140R6024R0010_File_1_of_2_Solicitation.pdf

PDF 6 MB Posted

Attached to
Norton Dam Wire Rope Replacement Federal contract opportunity
Solicitation number
140R6024R0010
Issued by
Department of the Interior Bureau of Reclamation

About this file

This Request for Proposal solicits wire rope replacement and related rehabilitation work at the Bureau of Reclamation's Norton Dam facility in Kansas. Work includes removing and replacing wire ropes, removing grease lines, fully recoating and rehabilitating sheave and idler arm assemblies, and spot repairing coatings on hoisting equipment. The solicitation is issued as a total small business set-aside. Interested offerors must submit proposals to the identified Contracting Specialist by the specified due date. The Bureau of Reclamation will evaluate proposals and make an award.

View the file

Other files for this federal contract opportunity

Other files attached to Norton Dam Wire Rope Replacement, newest first.
File Type Posted
140R6024R0010_Amend__No__0002_0002.pdf PDF
Sol_140R6024R0010_Amd_0002.pdf PDF
Sol_140R6024R0010_Amd_0001.pdf PDF
140R6024R0010_Amend__No__0001_0001.pdf PDF
140R6024R0010_File_2_of_2_Solicitation.pdf PDF
Sol_140R6024R0010.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. Department of the Interior Bureau of Reclamation Missouri Basin and Arkansas-Rio Grande-Texas Gulf Regions Billings, Montana January 2024

Request for Proposal Solicitation No. 140R6024R0010

Norton Dam Spillway Radial Gate Wire Rope Replacement

Almena Unit, Kansas Division Pick-Sloan Missouri Basin Program

Kansas

FOR OFFICIAL USE ONLY

Forward i

Norton Dam Spillway Radial Gate Wire Rope Replacement

Almena Unit, Kansas Division Pick-Sloan Missouri Basin Program

Kansas

FOREWORD

Work associated with this solicitation is to be performed at the Bureau of Reclamation’s Norton Dam facility near Norton, Kansas. The Norton Dam spillway is located approximately 4.9 miles southwest of the town of Norton, along Norton County Rd W3 off of Lower Dam Road.

Work performed under these specifications includes the following:

1. Remove and replace wire ropes.

2. Remove grease lines.

3. Fully recoat and rehabilitate sheave assemblies and idler arm assemblies.

4. Fully recoat floatwell covers, weirwell covers, and raised platforms.

5. Spot repair coatings on hoisting equipment.

POINT OF CONTACT – The Contracting Specialist for this action is Mr. Howard Heflin. All questions and correspondence concerning this solicitation shall be directed to him via e-mail at hheflin@usbr.gov.

METHOD OF PROCUREMENT – This requirement is solicited as a Request for Proposal using the Federal Acquisition Regulation Part 15 - Contracting by Negotiation.

ORGANIZED SITE VISIT – In accordance with L.14, 52.236-27 ALT1, Site Visit (Construction) - Alternate I, an organized on-site visit has been scheduled for 30 January 2024 at 10AM Central Standard Time. The meeting location will be the public parking lot on the South end of Norton Dam. The address for Norton Dam is 13000 Upper Dam Rd, Norton, KS 67654.

Prospective offerors interested in attending should contact Mr. Heflin via email. All offerors are strongly encouraged to attend this meeting.

Questions from industry may be submitted to Mr. Heflin via email no later than 2 February 2024 at 4PM Central Standard Time. A solicitation amendment will be issued no later than 9 February 2024 addressing all industry questions with corresponding Government answers.

RECLAMATION SAFETY AND HEALTH STANDARDS (2014 EDITION) – For information regarding Bureau of Reclamation's publication "RECLAMATION SAFETY AND HEALTH STANDARDS" (2023 Edition at http://www.usbr.gov/ssle/safety/RSHS/rshs.html) which is applicable to work under this contract, see clause at "WBR 1452.223-81 SAFETY AND

HEALTH."

SYSTEM FOR AWARD MANAGEMENT (SAM) – Effective October 2018, all contractors interested in doing business with the Federal Government must be registered in the System for Award Management (SAM) database at the time they submit their offer. Per FAR Provision http://www.usbr.gov/ssle/safety/RSHS/rshs.html

Forward ii

52.204-07 System for Award Management, upon receipt of each offer, the Government will verify that the offeror is currently registered in SAM. Any offeror found not registered in SAM at time of receipt of their offer will result in the Government immediately disqualifying their offer from further consideration for evaluation and award. In addition, any offeror’s registration that expires any time between submission of its offer and the time of award shall also be determined no longer qualified for consideration for such award. As such, each offeror is strongly encouraged to verify that they are currently registered in SAM and that their registration is not anticipated to expire within at least 4 months after the date they intend to submit its offer.

The Government cannot legally make ANY exceptions to this registration requirement for this procurement.

Additionally, the contractors Unique Entity ID (UEI) and banking information are required for the SAM registration and annual confirmation requirements must be accomplished through the SAM website at https://www.sam.gov. For assistance with registering in SAM, contact the Federal Services Desk at 1-866-606-8220.

INVOICE PROCESSING PLATFORM (IPP) – Payment requests for the anticipated contract or agreement must be submitted electronically through the U.S. Department of Treasury’s “Invoice Processing Platform” (IPP) System via the IPP website at https://www.ipp.gov. Contractors are required to use the IPP website to access and use IPP for submitting request for payment.

Registration assistance can be obtained by contacting the “IPP Production Helpdesk” via email ippgroup@bos.fbr.org or phone 1-866-973-3131. If the contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the contractor can submit a waiver request in writing to the Contracting Officer with its proposal. Note: Waivers will be on a case by case basis and not automatically granted as determined by the Contracting Officer. Please see Paragraph G.3, DOI-AAAP-0028 for more specific information on the process for submitting invoices in IPP.

https://www.sam.gov/ https://www.ipp.gov/ mailto:ippgroup@bos.fbr.org

Table of Contents - 1

TABLE OF CONTENTS

PART I – THE SCHEDULE

SECTION A -- SOLICITATION, OFFER, AND AWARD, STANDARD FORM 1442

SECTION B -- PRICE SCHEDULE

SECTION C -- DESCRIPTION / SPECIFICATIONS

DIVISION 01 – GENERAL REQUIREMENTS

01 11 00 Summary of Work 01 14 10 Use of Site 01 14 20 Radial Gate Operation 01 33 00 Submittals 01 35 10 Safety Data Sheets 01 35 20 Safety and Health 01 35 30 Contractor’s Onsite Safety Personnel 01 42 10 Reference Standards 01 46 00 Quality Procedures 01 51 00 Temporary Utilities 01 55 00 Vehicular Access and Parking 01 55 20 Traffic Control 01 56 10 Protection of Existing Installations 01 56 15 Protection of Existing Utilities 01 57 20 Environmental Controls 01 57 30 Water Pollution Control 01 74 00 Cleaning and Waste Management 01 78 30 Project Record Documents

DIVISION 02 – EXISTING CONDITIONS

02 83 30 Removal and Disposal of Coatings Containing Regulated Metals

DIVISION 09 - FINISHES

09 96 20 Coatings

DIVISION 41 – MATERIAL PROCESSING AND HANDLING EQUIPMENT

41 22 31 Refurbishment of Spillway Radial Gate Hoists

DIVISION 51 – INFORMATION AVAILABLE TO OFFERORS

51 00 00 Information Available to Offerors 51 02 83 Existing Coatings Analysis 51 09 96 Photographs 51 20 00 Record of Reservoir Elevation

Table of Contents - 2

DIVISION 52 – DRAWINGS

52 00 00 Drawings

SECTION D -- NOT USED

SECTION E -- INSPECTION AND ACCEPTANCE

E.1 52.246-12 Inspection of Construction

SECTION F – DELIVERIES OR PERFORMANCE

F.1 52.211-10 Commencement, Prosecution, and Completion of Work F.2 52.211-18 Variation in Estimated Quantity F.3 52.236-15 Schedules for Construction Contracts F.4 52.242-14 Suspension of Work

SECTION G -- CONTRACT ADMINISTRATION DATA

G.1 1452.201-70 Authorities and Delegations G.2 WBR 1452.201-80 Contracting Officer’s Representative’s Authorities and Limitations – Bureau of Reclamation G.3 WBR 1452.242-80 Postaward Conference – Bureau of Reclamation G.4 DOI-AAAP-0028 Electronic Invoicing and Payment Requirements – Invoice Processing Platform (IPP) G.5 DOI-AAAP-0050 Notice to Contractors – Contractor Performance Assessment Reporting System

SECTION H -- SPECIAL CONTRACT REQUIREMENTS

H.1 GP-1 Schedule of Values H.2 GP-2 Payment for Technical Data

PART II – CONTRACT CLAUSES

SECTION I – CONTRACT CLAUSES

I.1 52.252-2 Clauses Incorporated by Reference I.2 52.204-21 Basic Safeguarding of Covered Contractor Information Systems I.3 52.215-8 Order of Precedence – Uniform Contract Format I.4 52.219-6 Notice of Total Small Business Set-Aside I.5 52.219-14 Limitations on Subcontracting (Deviation) I.6 52.219-28 Post-Award Small Business Program Rerepresentation I.7 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction I.8 52.223-3 ALT I Hazardous Material Identification and Material Safety Data –

Alternate I I.9 1452.224-1 Privacy Act Notification (Deviation) I.10 52.225-9 Buy American–Construction Materials I.11 52.228-2 Additional Bond Security I.12 52.228-15 Performance and Payment Bonds – Construction I.13 52.232-5 Payments Under Fixed-Price Construction Contracts I.14 52.232-27 Prompt Payment for Construction Contracts

Table of Contents - 3

I.15 52.232-40 Providing Accelerated Payments to Small Business Subcontractors I.16 52.236-2 Differing Site Conditions I.17 52.236-13 Accident Prevention I.18 52.236-21 ALT II Specifications and Drawings for Construction – Alternate II I.19 52.243-4 Changes I.20 52.246-21 Warranty of Construction I.21 52.252-6 Authorized Deviations in Clauses I.22 1452.203-70 Restriction on Endorsements--Department of the Interior I.23 1452.204-70 Release of Claims--Department of the Interior I.24 1452.209-82 Prohibition on Release of Information – Bureau of Reclamation I.25 1452.215-70 Examination of Records by the Department of the Interior I.26 1452.228-70 Liability Insurance – Department of the Interior I.27 WBR 1452.223-81 Safety and Health -- Bureau of Reclamation I.28 WBR 1452.232-80 Limitation of Funds -- Bureau of Reclamation I.29 WBR 1452.232-81 Payment for Mobilization and Preparatory Work – Alternate I

ALT I

I.30 WBR 1452.236-84 Preservation of Cultural Resources -- Bureau of Reclamation I.31 WBR 1452.237-80 Security Requirements – Bureau of Reclamation – Alternate III

ALT III

I.32 WBR 1452.242-80 Postaward Conference – Bureau of Reclamation I.33 WBR 1452.243-80 Modification Proposals – Alternate II

ALT II

PART III – LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

SECTION J – LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

Attachment No. 1 .................................................................... General Decision No. KS20230037 Attachment No. 2 ………………..................................................... Standard Form 24 - Bid Bond Attachment No. 3 ………………......................................................................... Norton Drawings

PART IV – REPRESENTATIONS AND INSTRUCTIONS

SECTION K -- REPRESENTATIONS, CERTIFICATIONS AND OTHER

STATEMENTS OF OFFERORS

K.1 52.204-8 Annual Representations and Certifications K.2 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment K.3 52.209-7 Information Regarding Responsibility Matters K.4 52.209-13 Violation of Arms Control Treaties or Agreements- Certification

SECTION L -- INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS

L.1 52.204-7 System for Award Management L.2 52.204-16 Commercial and Government Entity Code Reporting L.3 52.204-22 Alternative Line Item Proposal L.4 52.211-1 Availability of Specifications Listed in the GSA Index of Federal Specifications, Standards and Commercial Item

Table of Contents - 4

Descriptions, FPMR Part 101-29 L.5 52.211-2 Availability of Specifications, Standards and Data Item Descriptions Listed in the Acquisition Streamlining and Standardization Information System (ASSIST) L.6 52.214-34 Submission of Offers in the English Language L.7 52.214-35 Submission of Offers in U.S. Currency L.8 52.215-1 Instructions to Offerors – Competitive Acquisition L.9 52.215-20 Requirements for Certified Cost or Pricing Data and Data Other Than

Certified Cost or Pricing Data L.10 52.216-1 Type of Contract L.11 52.222-5 Construction Wage Rate Requirements – Secondary Site of the Work L.12 52.228-1 Bid Guarantee L.13 52.228-17 Individual Surety – Pledge of Assets (Bid Guarantee) L.14 52.236-27 ALT I Site Visit (Construction) – Alternate I L.15 52.236-28 Preparation of Proposals – Construction L.16 52.252-1 Solicitation Provisions Incorporated by Reference L.17 52.252-5 Authorized Deviations in Provisions L.18 1452.215-71 Use and Disclosure of Proposal Information - Department of the Interior L.19 1452.233-2 Service of Protest Department of the Interior (JUL 1996) (Deviation) L.20 WBR 1452.215-81 Proposal Instructions – Bureau of Reclamation L.21 WBR 1452.236-85 Instruction for Mobilization and Preparatory Work Schedule Line Item – Bureau of Reclamation

SECTION M -- EVALUATION FACTORS FOR AWARD

M.1 WBR 1452.215-80 Source Selection Evaluation Procedures -- Bureau of Reclamation M.2 WBR 1452.215-82 Evaluation Factors for Award – Quality Predominance -- Bureau of Reclamation

END OF CONTENTS

SECTION A

SOLICITATION, OFFER, AND AWARD

(STANDARD FORM 1442)

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

Bureau of Reclamation

Great Plains Region

Regional Office PO Box 36900

R60

Billings MT 59107

Bureau of Reclamation / MB-5000

Attn: Howard Heflin 2021 4th Ave North Billings MT 59101

Howard Heflin 4062477797

1x 01/11/2024

140R6024R0010

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

Norton Dam Spillway Radial Gate Wire Rope Replacement Almena Unit, Kansas Division Pick- Sloan Missouri Basin Program, Kansas.

The magnitude of this project is between $1,000,000 and $5,000,000.

The North American Industry Classification System (NAICS) code is: 237990 - Other Heavy and Civil Engineering Construction.

The Small Business Size Standard is: $45 Million.

The Product or Service Code (PSC) is: Z2KA - Repair or Alterations of Dams.

The solicitation is issued as a Total Small Business Set-Aside.

Proposals are to be submitted via email to hheflin@usbr.gov. Reclamation's email servers limit attachments to 25 MB per message. Therefore, the offeror may need to submit multiple emails to ensure the Contract Specialist receives the complete proposal (Volumes 1-3).

The Offeror shall fill out the following:

Taxpayer Identification Number (TIN): _______________ System for Award Management (SAM) Unique Entity Identification (UEI): ______________ Commercial and Government Entity Code (CAGE): ______________ Currently Registered in System for Award Management (SAM): Yes or No. Indicate date SAM registration will expire: _______________

Continued ...

11. The Contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 425 calendar days and complete it within ________________ ________________ calendar days after receiving

Paragraph F.1

a. Sealed offers in original and

______________________ 02/26/2024

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 8/2014)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

40625092

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

Bureau of Reclamation Great Plains Region

Regional Office PO Box 36900

R60

Billings MT 59107

Ryan Cope

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 3304(a)

STANDARD FORM 1442 (REV. 8/2014) BACK

Continued...

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

140R6024R0010

1 Norton Dam Spillway Radial Gate Wire Rope Replacement

See attached Continuation of Section B (CLINs 1-5)

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

00010 AU $____________

SECTION B

THE SCHEDULE

Radial Gate Wire Rope Replacement Specifications No. 60-C0683

Price Schedule

B - 1

CONTINUATION OF

SECTION B – SUPPLIES OR SERVICES AND PRICES

NORTON DAM SPILLWAY

RADIAL GATE WIRE ROPE REPLACEMENT

Almena Unit, Kansas Division

Pick-Sloan Missouri Basin Program

Kansas

B.1 PRICE SCHEDULE

(a) Offers will be considered for award on the following Price Schedule, but no offer will be considered for award on only a part of the Price Schedule.

(b) Offers are subject to the terms and conditions of this solicitation.

(c) Quantities in the Price Schedule are estimated quantities for comparison of offers only.

Except as provided in the contract clause at FAR 52.211-18, Variation in Estimated

Quantity, no claim shall be made against the Government for overruns or underruns. The contract clause at FAR 52.211-18, Variation in Estimated Quantity does not apply to lump sum items.

(d) See the contract clause at WBR 1452.232-81, Payment for Mobilization and Preparatory

Work, for CLIN 1.

(e) Definitions:

(1) CLIN – Contract Line Item Number

Price Schedule

B - 2

PRICE SCHEDULE

CLIN Section Supplies or Services Quantity and Unit

Unit Price Amount

1 WBR

1452.232

-81

Mobilization and Preparatory

Work

For the lump sum of $

2 02 83 30 Removal and Disposal of

Coatings Containing

Regulated Metals

For the lump sum of $

3 09 96 20 Metalwork Spot Repairs 250 SF $ $

4 09 96 20 Metalwork Recoating 2,190 SF $ $

41 22 31 Hoist Refurbishment For the lump sum of $

TOTAL FOR PRICE SCHEDULE $

END OF SUPPLIES OR SERVICES AND PRICES

SECTION C

DESCRIPTION / SPECIFICATIONS

Table of Contents

00 01 10 - 1

SECTION C - DESCRIPTION / SPECIFICATIONS

TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 Summary of Work

01 14 10 Use of Site

01 14 20 Radial Gate Operation

01 33 00 Submittals

01 35 10 Safety Data Sheets

01 35 20 Safety and Health

01 35 30 Contractor’s Onsite Safety Personnel

01 42 10 Reference Standards

01 46 00 Quality Procedures

01 51 00 Temporary Utilities

01 55 00 Vehicular Access and Parking

01 55 20 Traffic Control

01 56 10 Protection of Existing Installations

01 56 15 Protection of Existing Utilities

01 57 20 Environmental Controls

01 57 30 Water Pollution Control

01 74 00 Cleaning and Waste Management

01 78 30 Project Record Documents

DIVISION 02 - EXISTING CONDITIONS

02 83 30 Removal and Disposal of Coatings Containing Regulated Metals

DIVISION 09 - FINISHES

09 96 20 Coatings

DIVISION 41 – MATERIAL PROCESSING AND HANDLING EQUIPMENT

41 22 31 Refurbishment of Spillway Radial Gate Hoists

DIVISION 51 – INFORMATION AVAILABLE TO OFFERORS

51 00 00 Information Available to Offerors

51 02 83 Existing Coatings Analysis

51 09 96 Photographs

51 20 00 Record of Reservoir Elevation

DIVISION 52 - DRAWINGS

52 00 00 Drawings

END OF CONTENTS

Summary of Work

01 11 00 - 1

SECTION 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1.01 LOCATION

A. Work associated with this solicitation is to be performed at the Bureau of Reclamation’s

Norton Dam facility near Norton, Kansas. The Norton Dam spillway is located approximately 4.9 miles southwest of the town of Norton, along Norton County Rd W3 off of Lower Dam Road.

1.02 PRINCIPAL COMPONENTS OF WORK

A. Work performed under these specifications includes the following:

1. Remove and replace wire ropes.

2. Remove grease lines.

3. Fully recoat and rehabilitate sheave assemblies and idler arm assemblies.

4. Fully recoat floatwell covers, weirwell covers, and raised platforms.

5. Spot repair coatings on hoisting equipment.

1.03 WORKFLOW RESTRICTIONS

A. Although no seasonal restriction will be imposed upon construction scheduling, the reservoir level may be above the crest elevation of 2296.00 feet prior to construction, or may rise above this elevation during construction (refer to Section 51 20 00 – Record of

Reservoir Elevation), which will place water on the radial gates. Reservoir operations will not be adjusted to accommodate construction schedules or work access, so the following restrictions shall apply:

1. Wire rope replacement and sheave assembly rehabilitation shall be performed on one gate at a time, such that at least 2 gates are fully operational at all times.

2. If after installation the lowering ropes on a particular gate require additional adjustment, and if the reservoir level exceeds or is anticipated to exceed the spillway crest elevation, the COR will direct all rope replacement work to cease until the reservoir level subsides or a Modification is issued to mitigate the safety hazards associated with the re-adjustment procedure.

3. Refer to Section 41 22 31 – Refurbishment of Spillway Radial Gate Hoists for further details.

Summary of Work

01 11 00 - 2

1.04 SPECIFICATIONS REQUIREMENTS

A. Requirements in Division 1, General Requirements, apply to Divisions 2 through 52.

B. Imperative statements in these specifications are Contractor requirements, unless otherwise stated.

C. Where specifications are written in streamlined form, the words “shall be” are included by inference where a colon (:) is used within the sentence or phrase.

1.05 DEFINITIONS

A. When the specifications use a word or term defined in the Federal Acquisition

Regulations (FAR), the definition of the word or term shall be in accordance with FAR sections in effect at the time the solicitation was issued.

1.06 ACRONYMS

A. The following acronyms apply to specifications Divisions 1 through 52:

1. CO: Contracting Officer

2. COR: Contracting Officer’s Representative

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

END OF SECTION

Use of Site

01 14 10 - 1

SECTION 01 14 10

USE OF SITE

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include in prices offered in the Price Schedule for other items of work.

1.02 REFERENCE STANDARDS

A. Bureau of Reclamation (USBR)

1. USBR Cleaning Manual Inspection and Cleaning Manual for Equipment and

Vehicles to Prevent the Spread of Invasive Species

(Technical memorandum No. 86-68220-07-05)

2010 Edition, available online at:

http://www.usbr.gov/mussels/prevention

1.03 SUBMITTALS

A. Submit the following in accordance with Section 01 33 00 – Submittals.

B. RSN 01 14 10-1, Area Use Plan:

1. For each Contractor use site on Government land:

a. Show use location and extent of impact. Uses include but are not limited to the following:

1) Service areas including storage areas, fuel and oil storage areas, and fabrication yards.

2) Parking areas and access routes.

3) Utilities including air, power, and water lines; and compressor stations.

4) First-aid and medical facilities.

5) Areas for processing, storing, and disposing of waste materials from construction operations.

6) Temporary fences.

b. Describe methods to preserve, protect, and repair (if damaged) vegetation

(such as trees, shrubs, and grass) and other landscape features on or adjacent to the jobsite, which are not to be removed and which do not interfere with the work required under this contract. Include methods to mark work area limits, protect disturbed areas, and prevent erosion.

http://www.usbr.gov/mussels/prevention

Use of Site

01 14 10 - 2

c. Describe methods to protect, and repair if damaged, existing improvements and utilities at or near the jobsite.

d. Describe methods for removing temporary structures and facilities, cleanup, and rehabilitating site after completion of construction activities.

2. Submit revised drawings of changes in use of Government land made during design and erection stages or after use of Government land is in operation.

1.04 PROJECT CONDITIONS

A. When private land is used for construction facilities, or other construction purposes, make necessary arrangements associated with use of private land.

B. Location, construction, operation, maintenance, and removal of construction facilities on

Government land will be subject to approval of the COR.

C. Housing for construction personnel will not be permitted on Government land.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Radial Gate Operation

01 14 20-1

SECTION 01 14 20

RADIAL GATE OPERATION

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include in prices offered in the Price Schedule for work requiring operation of the radial gates.

1.02 PROJECT CONDITIONS

A. Government-owned hoists will be required to open and close the radial gates.

B. The Government will provide an operator. Operation of radial gates by Contractor personnel is not permitted.

C. Contractor shall coordinate the opening and closing of the radial gates with the

Contracting Officer’s Representative (COR). Provide the COR 24 hours’ notice of required opening/closing/repositioning of radial gates to ensure Government operator is available to operate.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Radial Gate Operation

01 14 20-2

This page intentionally left blank.

Submittals

01 33 00 - 1

SECTION 01 33 00

SUBMITTALS

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include in prices offered in the Price Schedule for other items of work.

1.02 REFERENCE STANDARDS

A. American Society of Mechanical Engineers (ASME)

1. ASME Y14.1-12 Decimal Inch Drawing Sheet Size and Format

B. National Institute of Building Sciences (NIBS)

1. NIBS NCS-14 United States National CAD Standards, Version 6

1.03 DEFINITIONS

A. Days: Calendar days.

B. Required Submittal Number (RSN): Identifies items to be submitted together as a complete submittal.

C. Submittals: Considered “shop drawings” within the terms of the clause at FAR 52.236-21, Specifications and Drawings for Construction.

1.04 SUBMITTAL REQUIREMENTS

A. In case of conflict between requirements of this section and requirements included elsewhere in these specifications, requirements included elsewhere take precedence.

B. General:

1. Prepare in English.

2. Label with contract number and title, and RSN.

3. Measurement Units: US Customary Units.

C. Drawings:

1. Minimum identification in title block:

a. Contract number and title.

b. Contractor’s or supplier’s title and drawing number.

01 33 00 - 2

c. Date.

2. Provide space next to title block for review stamps.

3. Size: ANSI D size (22 inches by 34 inches) as defined by ASME Y14.1.

4. Draw to scale using computer drafting.

a. In accordance with NIBS NCS.

b. Electronic file format: Compatible with AutoCAD, Version 2018 or later.

c. Compile using “eTransmit” utility in AutoCAD.

d. Government will provide electronic AutoCAD format template.

e. Title block and sheet format:

1) As shown on Standard Drawing No. 40-D-7102.

2) Government will supply template.

3) Government will supply specific title block information to be used.

f. Show as-built changes, including revision dates, made during installation.

Indicate changes by clouding.

D. Product Data:

1. Mark manufacturer's data for commercial products or equipment, such as catalog cut sheets.

a. Identify manufacturer's name, type, model, size, and characteristics.

b. Illustrate that product or equipment meets requirements of specifications.

c. Mark items to be furnished in a manner that will photocopy (no highlighter).

d. Strike through items that do not apply.

E. Certifications:

1. Certifications by a registered professional: Signed and sealed by registered professional.

2. Manufacturer’s certifications: Signed by authorized representative of manufacturer.

1.05 SUBMITTALS PROCEDURES

A. Submit only checked submittals. Submittals without evidence of Contractor's approval will be returned for resubmission.

B. Submit complete sets of required materials for each RSN as specified in “Submittals Required” column in Table 01 33 00A – List of Submittals. A complete set includes all listed items for RSNs with multiple parts.

01 33 00 - 3

C. Submit number of sets specified in “No. of sets to be sent:” columns in Table 01 33 00A – List of Submittals.

1. Electronic submittals:

a. In Portable Document Format (PDF).

1) Optical Character Recognition (OCR).

2) 508 compliant.

3) RSNs having more than one requirement shall be bookmarked.

4) RSNs with requirements for files other than PDF (e.g. .XER, .PLF, .DWGs, etc.) shall be combined using WINZip.

b. Include RSN transmittal letter.

c. Personally Identifiable Information (PII) shall be encrypted using WINZip or Adobe Acrobat before transmitting electronically.

2. Submit electronic submittals via e-mail or USB drive based on size:

a. The Government can receive e-mails up to 25 MB. However, e-mails over 10 MB should be considered extra large. E-mailing of electronic submittals exceeding 10 MB should only occur after transmittal of extra-large size e-mail has been verified.

b. Address e-mail of electronic submittals less than extra-large size to:

1) sha-GPR-CONSTSVCS@usbr.gov

c. Electronic submittals that are too large to e-mail shall be submitted on USB drive.

d. Submittals received after 5:00 p.m. Mountain Time, shall be documented as received the next business day.

D. Include the following information in transmittal letters:

1. Contract number and title.

2. RSN for each attached submittal.

3. Responsible code.

4. Number of sets for each RSN.

5. Identify submittal as initial or resubmittal.

E. Resubmittal of submittals not approved:

1. Mark changes such that they are readily identifiable and show revision date.

a. Resubmitted drawings shall include a revision block with date.

2. Describe reasons for significant changes in transmittal letter.

3. Resubmit returned submittals within 7 days after receiving comments, unless otherwise directed.

mailto:sha-GPR-CONSTSVCS@usbr.gov

01 33 00 - 4

4. Requirements for initial submittals apply to resubmittals.

5. Resubmittals shall be complete submittals without reference to the original submittal.

F. Submit each RSN under a separate transmittal letter. Multiple RSNs submitted under a single letter will be returned for resubmittal.

1.06 REVIEW OF SUBMITTALS

A. Time Required:

1. Submittal review will require 28 days for review of each submittal or resubmittal, unless otherwise specified.

2. Time required for review of each submittal or resubmittal begins when complete sets of materials required for a particular RSN are received and extends through return e-mail date.

B. Time in Excess of Specified:

1. The CO may extend contract completion date to allow additional time for completing work affected by excess review time.

a. Time extension will extend the contract completion date based on the excess review time delay.

b. Time extension will not exceed time used in excess of specified number of days for review of submittals or resubmittals.

c. Concurrent days of excess review time resulting from review of two (2) or more separate submittals or resubmittals will be counted only once in extending contract completion date.

2. No time extension will be allowed if Contractor fails to make complete action submittals in sequence and within time periods specified.

3. Adjustment for delay will be made only to extent that:

a. Approval was required under contract, and.

b. Requests for approval were properly and timely submitted and were approved.

4. Adjustment will be subject to terms of paragraphs (b) and (c) of the clause at FAR

52.242-14, Suspension of Work; however, no such delay shall be deemed to be a “suspension order” as the term is used in that clause.

C. Submittal Response:

1. Response letter will indicate whether the submittal is approved, not approved, acceptable, not acceptable, or acknowledged receipt.

a. Revise and resubmit submittals not approved or not acceptable.

01 33 00 - 5

b. Do not change designs without approval of CO after drawings, documentation, and technical data have been approved.

1.07 TRANSMITTAL

A. Addresses for codes listed in Table 01 33 00A – List of Submittals:

1. CO: Bureau of Reclamation, Attention MB-5000, P.O. Box 36900, Billings, MT

59107-6900. Physical address: 2021 4th Avenue North, Billings, MT 59101.

2. COR: Bureau of Reclamation, Attention: Mark Rouse, 1706 West Third Street, McCook, NE 69001.

B. E-mail address for electronic submittals listed in Table 01 33 00A – List of Submittals:

sha-GPR-CONSTSVCS@usbr.gov.

1. Submit electronic submittals that are too large for e-mail to the physical address above.

C. Submittals required by specifications, but not listed in Table 01 33 00A – List of Submittals:

1. Submit in accordance with this section.

2. Submit to COR unless otherwise specified.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

mailto:sha-GPR-CONSTSVCS@usbr.gov

01 33 00 - 6

Table 01 33 00A. – List of Submittals ** CO indicates Contracting Officer, COR indicates Contracting Officer’s Representative.

RSN

Clause or

Section Title

Submittals required

Due date or delivery time

Respon-sible code

Sets to be sent to: **

CO COR

1 Reporting Executive Compensation and First Tier Subcontract Awards 52.204-10

Certification that executive compensation and subcontract awards were reported

Within 10 days of each report being submitted

CO 1 electronic 0

2 Equal Opportunity 52.222-26

Information required by Executive Order

112246 (SF-100)

Within 30 days following award

CO 1 electronic 0

3 Performance and Payment Bonds – Construction 52.228-15

Performance and Payment Bonds

Within 10 calendar days after award

CO 1 electronic 0

4 Release of Claims 1452.204-70

Release of Claims (DI-137) against the Government

After completion of the work and prior to final payment

CO 1 electronic 0

5 Insurance-Work on a Government Installation 1452.228-

1) Written certification that the required insurance has been obtained

2) Current certification of insurance for each subcontractor

Before commencing on-site work

CO 1 electronic

1 electronic

6 Liability Insurance 1452.228-70

Acceptable Certificate of Liability Insurance

Prior to commencement of work under the contract

CO 1 electronic 0

7 Payrolls and Basic Records 52.222-08

Copies of all payrolls

Weekly for each week of contract performance

COR 1 electronic encrypted

1 electronic encrypted

8 Labor Standards 52.222-11

List of subcontractors

Within 14 days after award of contract

COR 1 electronic 1 electronic

9 Labor Standards Data 52.222-11

Statement and Acknowledgment Form (SF-1413) for each subcontract

Within 14 days after award of contract

COR 1 electronic 1 electronic

10 Site Security

WBR 1452.237-80

Employee information

Submitted and accepted at least 28 days before mobilization

COR 0 1 electronic encrypted

11 Site Security

WBR 1452.237-80

Equipment and vehicles to be brought onsite

Submitted and approved at least 28 days before mobilization

COR 0 1 electronic

01 33 00 - 7

RSN

Clause or

Section Title

Submittals required

Due date or delivery time

Respon-sible code

Sets to be sent to: **

CO COR

12 Schedule of Values

GP-1

Schedule of Values Required for lump-sum items in the Bid Schedule. Submitted and approved before any payment other than bonds and insurance.

COR 0 1 electronic

13 Superintendence by the Contractor

Site Superintendent

Submitted and accepted at least 28 days before mobilization

COR 0 1 electronic encrypted

Division 1 – General 01 14 10-1 Use of Site Area Use Plan Submitted and approved at least 28 days before mobilization

COR 0 1 electronic

01 35 10-1 Safety Data Sheets Complete LHM and SDS

At least 28 days before jobsite delivery of hazardous material

COR 0 1 electronic

01 35 10-2 Safety Data Sheets Updated LHM and

SDS

At least 28 days before jobsite delivery of hazardous material not previously listed

COR 0 1 electronic

01 35 20-1 Safety and Health Safety Program Submitted and approved at least 28 days before mobilization.

COR 0 1 electronic

01 35 20-4 Safety and Health Training Certificates

Submitted and accepted at least 28 days before mobilization

COR 0 1 electronic

01 35 20-3 Safety and Health Monthly Accident Summary Report

Monthly COR 0 1 electronic

01 35 20-4 Safety and Health Respirator User Documentation

Submitted and accepted at least 28 days before mobilization

COR 0 1 electronic encrypted

01 35 20-5 Safety and Health Exposure Assessment Form (if applicable)

Within 21 days of exposure

COR 0 1 electronic

01 35 30-1 Contractor’s On-site Safety Personnel

Qualifications Submitted and accepted at least 28 days before mobilization

COR 0 1 electronic encrypted

01 35 30-2 Contractor’s On-site Safety Personnel

CIH Inspection Reports

Weekly COR 0 1 electronic

01 33 00 - 8

RSN

Clause or

Section Title

Submittals required

Due date or delivery time

Respon-sible code

Sets to be sent to: **

CO COR

01 35 30-3 Contractor’s On-site Safety Personnel

Safety Inspection Reports

Weekly COR 0 1 electronic

01 55 00-1 Vehicular Access and Parking

Preconstruction Digital Recordings

Submitted and approved at least 28 days before mobilization

COR 0 1 electronic

01 55 20-1 Traffic Control Traffic Control Plan (if applicable)

Submitted and approved at least 28 days before work affecting public traffic

COR 0 1 electronic

01 56 10-1 Protection of Existing Installations

Plan for Protecting Existing Installations

Submitted and approved at least 28 days before mobilization

COR 0 1 electronic

01 56 15-1 Protection of Existing Utilities

Plan for Protecting Existing Utilities

Submitted and approved at least 28 days before mobilization

COR 0 1 electronic

01 57 20-1 Environmental Controls

Copy of Applicable Air Quality Permit

Submitted and approved at least 28 days before mobilization

COR 0 1 electronic

01 57 30-1 Water Pollution Control

Water Management Plan

Submitted and approved at least 28 days before beginning on-site work

COR 0 1 electronic

01 57 30-2 Water Pollution Control

Spill Prevention, Control, and Countermeasure (SPCC) Plan (if required)

At least 28 days before delivery or storage of oil

COR 0 1 electronic

01 74 00-1 Cleaning and Waste Management

Waste Production and Disposal Plan

Submitted and approved at least 28 days before mobilization

COR 0 1 electronic

01 74 00-2 Cleaning and Waste Management

Waste Production and Disposal Records

Within 7 days of waste disposal

COR 0 1 electronic

01 74 00-3 Cleaning and Waste Management

Environmental Consultant Resume (if required)

At least 28 days before beginning environmental assessment

COR 0 1 electronic

01 74 00-4 Cleaning and Waste Management

Environmental Site Assessment (if required)

Within 14 days of completion of work

COR 0 1 electronic

01 78 30-1 Project Record Documents

Final As-built Drawings

Within 14 days of completion of work

01 33 00 - 9

RSN

Clause or

Section Title

Submittals required

Due date or delivery time

Respon-sible code

Sets to be sent to: **

CO COR

01 78 30-2 Project Record Documents

As-built Record of Materials

Within 14 days of completion of work

COR 0 1 electronic

Division 2 – Existing Conditions 02 83 30-1 Removal and Disposal of Coatings Containing Regulated Metals

Resumes and Qualifications

At least 28 days before beginning onsite work

COR 0 1 electronic

02 83 30-2 Removal and Disposal of Coatings Containing Regulated Metals

Coatings Removal Plans

At least 28 days before beginning onsite work

COR 0 1 electronic

02 83 30-3 Removal and Disposal of Coatings Containing Regulated Metals

Preconstruction Test Results

Within 7 days after completion of testing

COR 0 1 electronic

02 83 30-4 Removal and Disposal of Coatings Containing Regulated Metals

Working Level Test Results

Within 7 days after completion of testing

COR 0 1 electronic

02 83 30-5 Removal and Disposal of Coatings Containing Regulated Metals

Clearance and Post-Construction Test Results

Within 7 days after completion of testing

COR 0 1 electronic

02 83 30-6 Removal and Disposal of Coatings Containing Regulated Metals

Waste Characterization and Disposal Records

Within 7 days after disposal

COR 0 1 electronic

Division 9 – Finishes 09 96 20-1 Coatings Approval Data At least 21 days prior to beginning on-site work

COR 0 1 electronic

09 96 20-2 Coatings Final Approval Data

At least 21 days prior to beginning on-site work

COR 0 1 electronic

09 96 20-3 Coatings Qualifications At least 21 days prior to beginning on-site work

COR 0 1 electronic

09 96 20-4 Coatings Quality Control Plan

At least 21 days prior to beginning on-site work

COR 0 1 electronic

09 96 20-5 Coatings Contractor Quality Testing Final Report

Within 14 days of completion of work

COR 0 1 electronic

Division 41 – Material Processing and Handling Equipment 41 22 31-1 Refurbishment of

Spillway Radial Gate Hoists

Approval Data Submitted and approved at least 28 days before installation

01 33 00 - 10

RSN

Clause or

Section Title

Submittals required

Due date or delivery time

Respon-sible code

Sets to be sent to: **

CO COR

41 22 31-2 Refurbishment of Spillway Radial Gate Hoists

Final Data Submitted and approved at least 28 days before installation

Safety Data Sheets

01 35 10 - 1

SECTION 01 35 10

SAFETY DATA SHEETS

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include in prices offered in the Price Schedule for other items of work.

1.02 DEFINITIONS

A. LHM: List of Hazardous Materials.

B. SDS: Safety Data Sheet.

1. Referred to as Material Safety Data Sheets in the clause at 52.223-3, Hazardous

Material Identifications and Material Safety Data - Alternate 1.

1.03 APPLICATION

A. For the purposes of this contract, “delivered under this contract” in paragraph (b) of the clause at FAR 52.223-3, Hazardous Material Identification and Material Safety Data -

Alternate 1, includes:

1. Materials delivered to Government.

2. Materials incorporated into work.

3. Materials used by the Contractor during contract performance at the jobsite.

1.04 SUBMITTALS

A. Submit the following in accordance with Section 01 33 00 – Submittals.

B. RSN 01 35 10-1, Complete LHM and SDS.

C. RSN 01 35 10-2, Updated LHM and SDS:

1. Comply with paragraph (e) of clause at FAR 52.223-3, Hazardous Material

Identification and Material Safety Data – Alternate 1.

1.05 DELIVERY

A. Do not deliver hazardous materials to jobsite which are not included on original or previously updated LHM and SDS before receipt of updated LHM and SDS by the COR.

Safety Data Sheets

01 35 10 - 2

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Safety and Health

01 35 20 - 1

SECTION 01 35 20

SAFETY AND HEALTH

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include in prices offered in the Price Schedule for other items of work.

1.02 REFERENCE STANDARDS

A. American Conference of Governmental Industrial Hygienists (ACGIH)

1. TLVs Threshold Limit Values, available at https://www.acgih.org.

B. Bureau of Reclamation (USBR)

1. RSHS Reclamation Safety and Health Standards, available at https://www.usbr.gov/safety/rshs/index.html

C. Code of Federal Regulations (CFR)

1. 29 CFR Part 1910 Occupational Safety and Health Standards

2. 29 CFR Part 1926 Safety and Health Regulations for

Construction

3. Available at https://www.osha.gov.

D. National Institute for Occupational Safety and Health (NIOSH)

1. Available at www.cdc.gov/niosh.

E. Applicable Tribal and State Safety and Health Regulations for Construction.

1.03 ABBREVIATIONS AND DEFINITIONS

A. HECP Hazardous Energy Control Program

B. IDLH Immediately dangerous to life or health. Any condition that would interfere with an individual's ability to escape unaided from a PRCS and that poses a threat to life or that would cause irreversible adverse health effects.

C. JHA Job Hazard Analysis.

D. JSPM Joint Safety Policy Meeting.

https://www.acgih.org/ https://www.usbr.gov/safety/rshs/index.html https://www.osha.gov/ http://www.cdc.gov/niosh

01 35 20 - 2

E. PPE Personal protective equipment.

F. PRCS Permit-required confined space.

G. SDS Safety Data Sheet.

1.04 SUBMITTALS

A. Submit the following in accordance with Section 01 33 00 – Submittals.

B. RSN 01 35 20-1, Safety Program:

1. Submit a written safety program in accordance with Section 01 33 00 –

Submittals, RSHS Section 3.3, and these specifications.

2. Cover aspects of on-site and applicable off-site operations and activities associated with this contract.

3. Follow the outline in RSHS Appendix B, as shown in Table 01 35 20A – Safety

Program Guidelines.

a. The Safety Program will not be accepted for review by the COR unless it:

1) Addresses, in order, each lettered and numbered element per RSHS

Appendix B and Table 01 35 20A – Safety Program Guidelines.

2) Provides a comprehensive narrative for each applicable item in the outline.

b. For items in the outline that do not apply to this contract, write “Not applicable to Contract” next to the number/letter.

4. A generic company safety program is not acceptable. Safety Program shall be site-specific for this contract.

5. Submitted and accepted by Reclamation prior to commencing onsite work, including mobilization.

Table 01 35 20A – Safety Program Guidelines

Program Element

(from RSHS Appendix B) Comments

I. General Requirements • Comply with ACGIH, OSHA, RSHS, local safety programs, and any other referenced safety and health standards. The most stringent shall apply.

• Perform work in accordance with the specific safety program elements and referenced standards.

A. Statement of Policy • Contractor’s Safety and Health Policy.

B. Statement of Safety and

Health Responsibilities

• The Safety Program Statement of Responsibility shall state that “the

Contractor is responsible for ensuring that all work will be in compliance with Reclamation Safety and Health Standards and these specifications.”

01 35 20 - 3

Program Element

(from RSHS Appendix B) Comments

C. Statement of Compliance with

Regulations, Standards, and

Codes

• The Contractor shall specifically state the intention to comply with

ACGIH, OSHA, RSHS, and any other applicable regulatory standard.

The most stringent shall apply.

D. Statement of Subcontractor

Compliance

• The Contractor shall state that they will ensure compliance of their employees and subcontractors.

E. Safety Inspection Procedures • Specify in accordance with this specification and RSHS Section 3.

F. Accident Investigation and

Reporting Procedures

• Specify in accordance with this specification and RSHS Section 3.

• List procedures for reporting to COR and USBR, utilizing required forms.

G. Applicable Emergency Plans • Detailed coordination plan for outside emergency services including response time and a site visit where a rescue requires special capabilities or equipment.

• This plan shall address detailed emergency contacts and procedures to be used during an on-site emergency.

• Additional emergency plans and procedures as applicable to the location and potential hazards, such as but not limited to, the remoteness of worksite, potential hazards of worksite, and limitations of outside assistance.

• Plan shall include procedures for weather-related emergencies (e.g.

high winds, lightning, tornadoes, wildfires, etc.).

H. Confined Space Procedures • Include a detailed confined space entry plan for operations that require employees to enter confined spaces.

• The detailed confined space entry program shall be site-specific and in accordance with OSHA 29 CFR 1926.1200 thru 1926.1213 and these specifications.

• OSHA’s definition of IDLH in the 1926.1202 standard will be utilized on this project (see Article 1.3 above). A ventilation system alone does not alleviate the need for a rescue team to be prepared to enter an

IDLH atmosphere due to the potential for failure of a ventilation system.

• Include engineering controls, detailed ventilation plans (if applicable), personal protective equipment and air monitoring procedures for each confined space.

• Include non-entry and entry rescue plan.

• Include the Contractor’s Confined Space Entry Program.

• If permit-required confined spaces (PRCSs) will be entered, a trained and evaluated rescue team/service shall be required on site. If outside emergency services are to be relied upon for rescue and/or transporting of injured personnel, the employer shall first secure an agreement with the outside personnel to include what role they will have, response time, GPS coordinates if helicopter will be used, etc. The rescue team shall be immediately available (on site) during all entries into a PRCS.

Non-entry rescue is required unless the retrieval equipment would increase the overall risk of entry or would not contribute to the rescue of the entrant.

• For non-entry rescue, each authorized entrant shall use a chest or full body harness, with a retrieval line attached at the center of the entrant's…

This is the start of the file's text. The full file is on GovTribe.