Naval Surface Warfare Center Philadelphia Division (NSWCPD) Repair Station Console (RSC) Solicitation Notice N6449824R4016
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- N6449824R4016
- Agency
-
Naval Sea Systems Command
Department of the Navy, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 334111 Electronic Computer Manufacturing
- Place of performance
- United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Naval Surface Warfare Center Philadelphia Division (NSWCPD) is seeking proposals for the design, fabrication, assembly, and testing of Repair Station Consoles (RSCs) to support the DDG-Modernization and DDG ship construction efforts. The contract will be an Indefinite-Delivery, Indefinite-Quantity (IDIQ), Firm-Fixed-Price agreement with a guaranteed minimum of $1,000 and a maximum of $35,985,428.20. The solicitation requires the contractor to perform First Article Testing, Non-Recurring Engineering, Support Services, and Storage/Maintenance services. Evaluation criteria include technical approach, past performance, corporate experience, price, quality management system, and small business participation. Questions are due by July 17, 2024 and proposals are due by August 26, 2024.
This solicitation is being competed on a full and open basis with no set-asides. The incumbent or current contractors are not named. The scope includes providing qualified Qualification Sets, Shipsets, Installation & Checkout Kits, and Onboard Repair Parts Kits over a 60-month period. The place of performance is the United States.
Notice text
7 versions
Update #7 · Latest ·
Amendment 005 issued to remove the Proposal Adequacy Checklist (DFARS 252.205-7009) from Section L.2.1 Page Numbers and Limits. This Checklist is not necessary for submnission with this RFP.
End of Amendment 005.
Amendment 004 issued to address the following:
- Extend the Solicitation closing date from Monday 12:00 PM EST 12 August 2024 to Monday 3:00 PM EST 26 August 2024.
- Provide compiled list of answers to questions received regarding the Solicitation package. All 43 questions have been provided with Government responses. (Please see Attachment 3 RSC 24R4016 Quesitons and Answers).
- Removal of Clause M-209-H001 WAIVER OF FIRST ARTICLE REQUIREMENTS (CONTRACTOR TESTING) – BASIC (NAVSEA) (OCT 2018)
- Revisions provided to Statement of Work in reply to Questions 22, 24, 31, 42, and 43:
- Q22: The reference to 1st Training Set is incorrect in the SOW 3.1.7.16.24. The SOW 3.1.7.16.24 has been revised to state SHIPSET instead of 1st training set.
- Q24: The language in SOW 3.1.7.1.3 has hereby been updated in accordance with Clauses L-227-H002 and L-227-H001 to “The Contract shall be appraised at a CMMI maturity level three (3) or equivalent.”
- Q29: SOW section 3.1.6.10.4 has been updated to state “3.1.6.10.4 The Contractor has two options regarding holding of the material line items. 1) The Contractor must agree with holding the material line item and NOT invoicing for it until availability is identified to ship the material to a Govt. facility/location. (at this point the Contractor still owns the item); or, 2) The Contractor invoices the material line item and it is then converted to GFP and is stored at the Contractor's facility. The GFP must be tracked in accordance with the GFP clauses.”
- Q31: Please see updated Amendment 4 with updated SOW sections 2.1.36, 3.1.7.16.19, 3.1.7.16.20, 3.1.7.16.21, 3.1.7.16.22, and 3.1.7.16.23 to reference MIL-STD-1399-300-1. Reference to MIL-STD-1399 section 300B is removed.
- Q42: SOW 3.1.7.23.7 has been updated to correct references of 3.1.7.23.5 and 3.1.7.23.6, please see revised SOW provided in Amendment 4.
- Q43: The SOW number of subsections have been updated for Section 10 Counterfeit Material Prevention. Please reference Amendment 4 Conformed Copy updates.
- Revisions Provided to Section L in reply to Questions 8, 15, and 18:
- Q8 and 15: Revision to Section L.1 General Instructions “Font text shall be 12-point Times New Roman, except for: Graphs, graphics, tables, or charts used to supplement the proposal text shall use Times New Roman that is no smaller than 9-point font size.”
- Q18: Revision to L.3. The total page limit for Volume II Factor 1 Technical Approach has been increased from 35 pages to 41 pages to account for the 6 pages allowed under Element 1D Software Development Plan.
- Revised Attachment A SOW Performance Spec_Updated has been provided in response of revisions to questions 12, 13, 34, and 41.
Amendment 003 issued to update Section M, FACTOR 6 - SMALL BUSINESS PARTICIPATION COMMITTMENT, Section 1. SBPCD baseline small business Minimum Quantitative Requirement (MQR) for small business has been udpated from 40% to 10% of the total proposed contract value (not subcontracting dollars). and Update of Attachment 1 - NSWCPD SBPCD RFP 24R4016 A3 with update to 10%.
End of Amendment 003.
Update of Sam.gov posting for solicitation due date to match Solicitation SF 33 stated date of 12 August 2024 at 12:00pm EST.
End of Sam.gov Update.
Amendment 0002 issued to update Section C Statement of Work; additonf of Fill in Clause 52.246-11 HIGHER-LEVEL-CONTRACT QUALITY REQUIREMENT (DEC 2014); Update of Clause C-209-H001; Update of Section L Element 1 D Software Development Plan; and Update of Section M Element 1 D Software Development Plan and M2 Relative Importance of Evaluation Factors.
End of Amendmnet 002.
Amendment 0001 issued to update Solictiatoin Instructions with inclusion of Joint Certification Program (JCP) request of Attachment B - SOW ILS Specifications.
End of Amendment 001
Attached is the following:
Request for Proposals (RFP) N64498-24-R-4016
Questions are due NLT 17 July 2024, 3:00pm EST.
List of Exhibits:
1. Exhibit 1_A001 - A088 CDRLS
2. Exhibit 2_DD254_RSC_C4
List of Attachments:
1. Attachment 1 - NSWCPD SBPCD
2. Attachment 1 - GFP Attachment Template
3. Attachment A - SOW Performance Spec
4. Attachment B - SOW ILS Specification - Please See Solictiation Amend 0001 JCP program for instructions on how to request access.
5. Attachment C - SOW MIL-STD-31000
6. Attachment C - SOW TPD Option Seclection Worksheet
7. Attachment D - SOW GFI
8. Attachment D - SOW DDGM BF ECP Form
9. Attachment D - SOW PAFOS Ch. 4
10. Attachment D - SOW RSC Tech Manual Contract Requirement
Update #6 ·
Amendment 004 issued to address the following:
- Extend the Solicitation closing date from Monday 12:00 PM EST 12 August 2024 to Monday 3:00 PM EST 26 August 2024.
- Provide compiled list of answers to questions received regarding the Solicitation package. All 43 questions have been provided with Government responses. (Please see Attachment 3 RSC 24R4016 Quesitons and Answers).
- Removal of Clause M-209-H001 WAIVER OF FIRST ARTICLE REQUIREMENTS (CONTRACTOR TESTING) – BASIC (NAVSEA) (OCT 2018)
- Revisions provided to Statement of Work in reply to Questions 22, 24, 31, 42, and 43:
- Q22: The reference to 1st Training Set is incorrect in the SOW 3.1.7.16.24. The SOW 3.1.7.16.24 has been revised to state SHIPSET instead of 1st training set.
- Q24: The language in SOW 3.1.7.1.3 has hereby been updated in accordance with Clauses L-227-H002 and L-227-H001 to “The Contract shall be appraised at a CMMI maturity level three (3) or equivalent.”
- Q29: SOW section 3.1.6.10.4 has been updated to state “3.1.6.10.4 The Contractor has two options regarding holding of the material line items. 1) The Contractor must agree with holding the material line item and NOT invoicing for it until availability is identified to ship the material to a Govt. facility/location. (at this point the Contractor still owns the item); or, 2) The Contractor invoices the material line item and it is then converted to GFP and is stored at the Contractor's facility. The GFP must be tracked in accordance with the GFP clauses.”
- Q31: Please see updated Amendment 4 with updated SOW sections 2.1.36, 3.1.7.16.19, 3.1.7.16.20, 3.1.7.16.21, 3.1.7.16.22, and 3.1.7.16.23 to reference MIL-STD-1399-300-1. Reference to MIL-STD-1399 section 300B is removed.
- Q42: SOW 3.1.7.23.7 has been updated to correct references of 3.1.7.23.5 and 3.1.7.23.6, please see revised SOW provided in Amendment 4.
- Q43: The SOW number of subsections have been updated for Section 10 Counterfeit Material Prevention. Please reference Amendment 4 Conformed Copy updates.
- Revisions Provided to Section L in reply to Questions 8, 15, and 18:
- Q8 and 15: Revision to Section L.1 General Instructions “Font text shall be 12-point Times New Roman, except for: Graphs, graphics, tables, or charts used to supplement the proposal text shall use Times New Roman that is no smaller than 9-point font size.”
- Q18: Revision to L.3. The total page limit for Volume II Factor 1 Technical Approach has been increased from 35 pages to 41 pages to account for the 6 pages allowed under Element 1D Software Development Plan.
- Revised Attachment A SOW Performance Spec_Updated has been provided in response of revisions to questions 12, 13, 34, and 41.
Amendment 003 issued to update Section M, FACTOR 6 - SMALL BUSINESS PARTICIPATION COMMITTMENT, Section 1. SBPCD baseline small business Minimum Quantitative Requirement (MQR) for small business has been udpated from 40% to 10% of the total proposed contract value (not subcontracting dollars). and Update of Attachment 1 - NSWCPD SBPCD RFP 24R4016 A3 with update to 10%.
End of Amendment 003.
Update of Sam.gov posting for solicitation due date to match Solicitation SF 33 stated date of 12 August 2024 at 12:00pm EST.
End of Sam.gov Update.
Amendment 0002 issued to update Section C Statement of Work; additonf of Fill in Clause 52.246-11 HIGHER-LEVEL-CONTRACT QUALITY REQUIREMENT (DEC 2014); Update of Clause C-209-H001; Update of Section L Element 1 D Software Development Plan; and Update of Section M Element 1 D Software Development Plan and M2 Relative Importance of Evaluation Factors.
End of Amendmnet 002.
Amendment 0001 issued to update Solictiatoin Instructions with inclusion of Joint Certification Program (JCP) request of Attachment B - SOW ILS Specifications.
End of Amendment 001
Attached is the following:
Request for Proposals (RFP) N64498-24-R-4016
Questions are due NLT 17 July 2024, 3:00pm EST.
List of Exhibits:
1. Exhibit 1_A001 - A088 CDRLS
2. Exhibit 2_DD254_RSC_C4
List of Attachments:
1. Attachment 1 - NSWCPD SBPCD
2. Attachment 1 - GFP Attachment Template
3. Attachment A - SOW Performance Spec
4. Attachment B - SOW ILS Specification - Please See Solictiation Amend 0001 JCP program for instructions on how to request access.
5. Attachment C - SOW MIL-STD-31000
6. Attachment C - SOW TPD Option Seclection Worksheet
7. Attachment D - SOW GFI
8. Attachment D - SOW DDGM BF ECP Form
9. Attachment D - SOW PAFOS Ch. 4
10. Attachment D - SOW RSC Tech Manual Contract Requirement
Update #5 ·
Amendment 003 issued to update Section M, FACTOR 6 - SMALL BUSINESS PARTICIPATION COMMITTMENT, Section 1. SBPCD baseline small business Minimum Quantitative Requirement (MQR) for small business has been udpated from 40% to 10% of the total proposed contract value (not subcontracting dollars). and Update of Attachment 1 - NSWCPD SBPCD RFP 24R4016 A3 with update to 10%.
End of Amendment 003.
Update of Sam.gov posting for solicitation due date to match Solicitation SF 33 stated date of 12 August 2024 at 12:00pm EST.
End of Sam.gov Update.
Amendment 0002 issued to update Section C Statement of Work; additonf of Fill in Clause 52.246-11 HIGHER-LEVEL-CONTRACT QUALITY REQUIREMENT (DEC 2014); Update of Clause C-209-H001; Update of Section L Element 1 D Software Development Plan; and Update of Section M Element 1 D Software Development Plan and M2 Relative Importance of Evaluation Factors.
End of Amendmnet 002.
Amendment 0001 issued to update Solictiatoin Instructions with inclusion of Joint Certification Program (JCP) request of Attachment B - SOW ILS Specifications.
End of Amendment 001
Attached is the following:
Request for Proposals (RFP) N64498-24-R-4016
Questions are due NLT 17 July 2024, 3:00pm EST.
List of Exhibits:
1. Exhibit 1_A001 - A088 CDRLS
2. Exhibit 2_DD254_RSC_C4
List of Attachments:
1. Attachment 1 - NSWCPD SBPCD
2. Attachment 1 - GFP Attachment Template
3. Attachment A - SOW Performance Spec
4. Attachment B - SOW ILS Specification - Please See Solictiation Amend 0001 JCP program for instructions on how to request access.
5. Attachment C - SOW MIL-STD-31000
6. Attachment C - SOW TPD Option Seclection Worksheet
7. Attachment D - SOW GFI
8. Attachment D - SOW DDGM BF ECP Form
9. Attachment D - SOW PAFOS Ch. 4
10. Attachment D - SOW RSC Tech Manual Contract Requirement
Update #4 ·
Update of Sam.gov posting for solicitation due date to match Solicitation SF 33 stated date of 12 August 2024 at 12:00pm EST.
End of Sam.gov Update.
Amendment 0002 issued to update Section C Statement of Work; additonf of Fill in Clause 52.246-11 HIGHER-LEVEL-CONTRACT QUALITY REQUIREMENT (DEC 2014); Update of Clause C-209-H001; Update of Section L Element 1 D Software Development Plan; and Update of Section M Element 1 D Software Development Plan and M2 Relative Importance of Evaluation Factors.
End of Amendmnet 002.
Amendment 0001 issued to update Solictiatoin Instructions with inclusion of Joint Certification Program (JCP) request of Attachment B - SOW ILS Specifications.
End of Amendment 001
Attached is the following:
Request for Proposals (RFP) N64498-24-R-4016
Questions are due NLT 17 July 2024, 3:00pm EST.
List of Exhibits:
1. Exhibit 1_A001 - A088 CDRLS
2. Exhibit 2_DD254_RSC_C4
List of Attachments:
1. Attachment 1 - NSWCPD SBPCD
2. Attachment 1 - GFP Attachment Template
3. Attachment A - SOW Performance Spec
4. Attachment B - SOW ILS Specification - Please See Solictiation Amend 0001 JCP program for instructions on how to request access.
5. Attachment C - SOW MIL-STD-31000
6. Attachment C - SOW TPD Option Seclection Worksheet
7. Attachment D - SOW GFI
8. Attachment D - SOW DDGM BF ECP Form
9. Attachment D - SOW PAFOS Ch. 4
10. Attachment D - SOW RSC Tech Manual Contract Requirement
Update #3 ·
Amendment 0002 issued to update Section C Statement of Work; additonf of Fill in Clause 52.246-11 HIGHER-LEVEL-CONTRACT QUALITY REQUIREMENT (DEC 2014); Update of Clause C-209-H001; Update of Section L Element 1 D Software Development Plan; and Update of Section M Element 1 D Software Development Plan and M2 Relative Importance of Evaluation Factors.
End of Amendmnet 002.
Amendment 0001 issued to update Solictiatoin Instructions with inclusion of Joint Certification Program (JCP) request of Attachment B - SOW ILS Specifications.
End of Amendment 001
Attached is the following:
Request for Proposals (RFP) N64498-24-R-4016
Questions are due NLT 17 July 2024, 3:00pm EST.
List of Exhibits:
1. Exhibit 1_A001 - A088 CDRLS
2. Exhibit 2_DD254_RSC_C4
List of Attachments:
1. Attachment 1 - NSWCPD SBPCD
2. Attachment 1 - GFP Attachment Template
3. Attachment A - SOW Performance Spec
4. Attachment B - SOW ILS Specification - Please See Solictiation Amend 0001 JCP program for instructions on how to request access.
5. Attachment C - SOW MIL-STD-31000
6. Attachment C - SOW TPD Option Seclection Worksheet
7. Attachment D - SOW GFI
8. Attachment D - SOW DDGM BF ECP Form
9. Attachment D - SOW PAFOS Ch. 4
10. Attachment D - SOW RSC Tech Manual Contract Requirement
Update #2 ·
Amendment 0001 issues to update Solictiatoin Instructions with inclusion of Joint Certification Program (JCP) request of Attachment B - SOW ILS Specifications.
End of Amendment 001
Attached is the following:
Request for Proposals (RFP) N64498-24-R-4016
Questions are due NLT 17 July 2024, 3:00pm EST.
List of Exhibits:
1. Exhibit 1_A001 - A088 CDRLS
2. Exhibit 2_DD254_RSC_C4
List of Attachments:
1. Attachment 1 - NSWCPD SBPCD
2. Attachment 1 - GFP Attachment Template
3. Attachment A - SOW Performance Spec
4. Attachment B - SOW ILS Specification - Please See Solictiation Amend 0001 JCP program for instructions on how to request access.
5. Attachment C - SOW MIL-STD-31000
6. Attachment C - SOW TPD Option Seclection Worksheet
7. Attachment D - SOW GFI
8. Attachment D - SOW DDGM BF ECP Form
9. Attachment D - SOW PAFOS Ch. 4
10. Attachment D - SOW RSC Tech Manual Contract Requirement
Update #1 ·
Attached is the following:
Request for Proposals (RFP) N64498-24-R-4016
Questions are due NLT 17 July 2024, 3:00pm EST.
List of Exhibits:
1. Exhibit 1_A001 - A088 CDRLS
2. Exhibit 2_DD254_RSC_C4
List of Attachments:
1. Attachment 1 - NSWCPD SBPCD
2. Attachment 1 - GFP Attachment Template
3. Attachment A - SOW Performance Spec
4. Attachment B - SOW ILS Specification
5. Attachment C - SOW MIL-STD-31000
6. Attachment C - SOW TPD Option Seclection Worksheet
7. Attachment D - SOW GFI
8. Attachment D - SOW DDGM BF ECP Form
9. Attachment D - SOW PAFOS Ch. 4
10. Attachment D - SOW RSC Tech Manual Contract Requirement
Files
Show all 22
Notice history
| Notice | Type | Posted |
|---|---|---|
| AWARD RFP N6449824R4016 Repair Station Console (RSC) | Award Notice | |
| This notice | Solicitation | |
| Naval Surface Warfare Center Philadelphia Division (NSWCPD) Repair Station Console (RSC) Pre-Solicitation Notice | Pre-Solicitation | |
| Naval Surface Warfare Center Philadelphia Division (NSWCPD) Repair Station Console (RSC) Industry Day | Special Notice | |
| Repair Station Console | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Control-display UNI, in repair/modification of | Naval Supply Systems Command | No set-aside | |
| C45 NDI Follow-on | Naval Sea Systems Command | No set-aside | |
| LM2500 Gas Turbine Assembly Repairs | Naval Sea Systems Command | No set-aside | |
| Control-display UNI, in repair/modification of | Naval Supply Systems Command | No set-aside | |
| Panel PC, in repair/modification of | Naval Supply Systems Command | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity