Exhibit 1_A001 - A088 CDRLS.pdf
PDF 21 MB Posted
- Solicitation number
- N6449824R4016
About this file
This document is the Request for Proposals (RFP) N64498-24-R-4016 for the Naval Surface Warfare Center Philadelphia Division (NSWCPD) Repair Station Console (RSC) Solicitation. The solicitation includes the following exhibits and attachments:
Exhibits:
- Exhibit 1_A001 - A088 CDRLS
- Exhibit 2_DD254_RSC_C4
Attachments:
- Attachment 1 - NSWCPD SBPCD
- Attachment 1 - GFP Attachment Template
- Attachment A - SOW Performance Spec
- Attachment B - SOW ILS Specification
- Attachment C - SOW MIL-STD-31000
- Attachment C - SOW TPD Option Seclection Worksheet
- Attachment D - SOW GFI
- Attachment D - SOW DDGM BF ECP Form
- Attachment D - SOW PAFOS Ch. 4
- Attachment D - SOW RSC Tech Manual Contract Requirement
The solicitation is issued by the Department of the Navy Naval Sea Systems Command. Questions are due no later than 17 July 2024, 3:00pm EST. The solicitation documents provide details on the required products and services, as well as relevant specifications, standards, and contract requirements.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP N64498-24-R-4016 RSC
Exhibit 1 – A001 – A088 CDRLS
Please reference “attachments” tab in this PDF to see all applicable CDRLs in reference of the Statement of Work of RFP 24R4016
DD FORM 1423-1, FEB 2001
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
A CMAN
REPAIR STATION CONSOLE
A050 ENGINEERING CHANGE PROPOSAL (ECP)
DI-CMAN-80639E SOW 4.0 NSWC PD C/554
LT
A* D*
AS REQ
BLK 16
NSWC PD 1 0 1
DCMA(S3911A) 1
1 1 1
BLOCK 4: Government shall provide format at contract award.
BLOCK 9: Distribution Statement D: Distribution authorized to Department of Defense (DoD) and U. S. DoD contractors only; Critical Technology (5 January 2024). Other requests for this document shall be referred to NSWC Philadelphia Division C/ 554.
BLOCK 8, 11-13: Approval is for technical content only. Submit 30 days prior to Design Reviews. GOVT to provide response w/in 15 days, CTR to provide updated document NLT
30 DARC.
BLOCK 14: Electronic format for regular copy acceptable. Format must be readable by Microsoft Office 2010 Suite or Later Version. Electronic distribution acceptable.
Jacob Guendelsberger NSWC PD C/554
GUENDELSBERGER.JACOB.DA
VID.1545513087
Digitally signed by
GUENDELSBERGER.JACOB.DAVID.1545513087
Date: 2024.01.09 14:05:55 -05'00'
1/9/2024 ENGELS.DAVID.R.13853233
ENGELS.DAVID.R.1385323391
Date: 2024.01.05 19:48:08 -05'00'
01/05/2024
Adobe Professional 8.0
16. REMARKS (Continued)
DD FORM 1423-1, FEB 2001 Page of Pages
A CMAN
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoD 5010.12-M for detailed instructions.)
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package;
TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15.
Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.
DD FORM 1423-1 (BACK), FEB 2001
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
A MGMT
A001 CONTRACT STATUS REPORT
DI-MGMT-81991 SOW 4.0 NSWC PD C/554
N/A BLK 16
Tech POC 0 1 1
PCO 0 1
COR 0 1
0 4 1
BLOCK 10 and 11: Start and end status date same as start and end dates on i-RAPT invoice submission.
BLOCK 12 and 13 Submit report same day as submission of each i-RAPT invoice throughout the Period of Performance for this contract/order.
BLOCK 9: Distribution Statement B. Distribution authorized to U.S. Government agencies only for contractor performance evaluation 17 12 2023. Other requests for this document shall be referred to Commander, Naval Surface Warfare Center, Philadelphia Division, 5001 South Broad Street, Building 4, Philadelphia, PA 19112.
BLOCK 14: Submit via electronic mail in a digital format that can be read by Microsoft Office 2010 applications (or earlier) or Adobe PDF applications to the distribution addresses identified in Attachment 1 to Exhibit A.
Date: 2024.01.09 09:44:21 -05'00'
Date: 2023.12.17 10:05:56 -05'00'
12/17/2023 conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
A MISC
A082 Counterfeit Prevention Plan
DI-MISC-81832 SOW 4.0 NSWC PD C/554
A* D (BLK 16)
2 TIME/R (BLK 16)
N/A
SEE BLK 16
PCO 0 1
COR 0 1
0 2 1
Block 4: Contractor’s format is acceptable. The contractor shall develop a Counterfeit Prevention Plan using SAE Aerospace Standards AS5553 and AS6174 as a guide.
Blocks 8 and 10: Allow 45 days for Government approval/disapproval. Resubmittals, if required, shall be submitted NLT 60 days after receipt of Government comments.
Block 9: Distribution Statement D. Distribution authorized to the U.S. Department of Defense and U.S. DoD contractors only. Critical Technology: (insert date). Other requests for this document shall be referred to Commander, Naval Surface Warfare Center, Philadelphia Division, 5001 South Broad Street, Building 4, Philadelphia, PA 19112.
Block 12: Initial submittal 90 days after contract award. Final submission shall be 90 days prior to Milestone C.
Block 13: Significant revisions shall be submitted 60 days after completion of revisions and submittals shall continue throughout the period of performance.
Block 14: Submit via electronic mail in a digital format compatible with Adobe Acrobat Document Format (PDF) and Microsoft Office 2000 and sent to the PCO (xxx@navy.mil) and COR, Date: 2024.01.09 15:14:07 -05'00'
Date: 2024.01.06 16:32:07 -05'00'
01/06/2024
1 2
Intentionally left blank conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
A051 TECHNICAL INFORMATION REPORT RSC SYSTEM AND HARDWARE
REQUIREMENTS REPORT
DI-MISC-80652 SOW 4.0 NSWC PD C/554
A* D*
NSWC PD 1 0 1
1 0 2
BLOCK 8, 10-13: Approval for technical content only. Submit draft report 14 Days prior to SRR, submit updated requirements 14 Days prior to PDR, and submit final 14 Days prior to CDR. Also submit requirements updates when impacted by approved hardware or software changes. Government to provide comments within 30 days. CTR to provide updated document NLT 30 DARC.
BLOCK 14: Electronic distribution acceptable. Submit Requirements in DOORS 9.0 compatible file format. Also deliver export file of software requirements in Microsoft EXCEL file.
Date: 2024.01.09 14:06:24 -05'00'
Date: 2024.01.05 19:52:51 -05'00' conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
A002 TRAVEL/TRIP REPORT TRIP STATUS REPORT
DI-MISC-81943 SOW 4.0 NSWC PD C/554
MNTHLY
COR 0 1
Tech POC 0 1
0 4 0
BLOCK 9: Distribution Statement B. Distribution authorized to U.S. Government agencies only for contractor performance evaluation, 6 Jan 2024. Other requests for this
BLOCK 11, 12 & 13: First submission due No Later Than (NLT) 45 Days after Contract (DAC). Subsequent submissions due monthly thereafter, concurrent with the invoice.
Date: 2024.01.09 09:46:30 -05'00'
Date: 2023.12.17 10:08:12 -05'00' conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
A SESS
A083 Contractual Baseline Report
DI-SESS-81856 SOW 4.0 NSWC PD C/554
N/A D*
NSWC PD 0 0 1
0 0 2
BLOCKS 11-13: Contractor to submit initial document at PDR. Contractor to submit updated document NLT 14 days after change is made to Contractual Baseline.
Date: 2024.01.09 15:14:32 -05'00'
Date: 2024.01.08 17:46:09 -05'00'
01/08/2024 conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
A003 CONTRACTOR PERSONNEL ROSTER ON-SITE CONTRACTOR PERSONNEL
DI-MGMT-81834A SOW 4.0 NSWC PD C/554
COR 0 1
agencies only for contractor performance evaluation, 06 Jan 2024. Other requests for this
Date: 2024.01.09 09:47:42 -05'00'
Date: 2023.12.17 10:09:50 -05'00' conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
A
A052 COMMERICAL OFF-THE-SHELF (COTS) HARDWARE
MANUALS
SUPPLEMENTAL ENGINEERING DATA FOR
PROVISIONING
DI-TMSS-80527D SOW 4.0 NSWCPD C/554
ONE
0 1 1
BLOCK 1: If no commercial hardware manual(s) exist for the system or equipment, this data item requirement shall be deleted upon notification to the Government Contracting Officer.
Blocks 11-13 - Submit 14 days prior to Preliminary Design Review (PDR). Submit follow-on drawings 14 days prior to CDR. Allow 30 days Government review time.
Government comments to be incorporated within 30 DARC
BLOCK 14: Manuals shall be provided in Adobe Portable Data Format (PDF) 9.0 or higher.
One CDROM containing the electronic version of the Tech Manuals is required by NSWC PD for the final Tech Manual versions produced. All Tech Manual CDROMs shall be delivered with the capability to be duplicated.
Date: 2024.01.09 14:06:51 -05'00'
Date: 2024.01.08 17:27:18 -05'00'
01/08/2024
A conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
A084 SEE BLK 16 Systems Security Plan (SSP)
DI-MGMT-82247 SOW 4.0 NSWC PD C/554
N/A E*
Tech SME 0 1 0
COR 0 1 0
PCO 0 1 0
0 3 1
Block 2: "Title: Contractor’s Systems Security Plan and Associated Plans of Action to Implement NIST SP 800-171 on a Contractor’s Internal Unclassified Information System".
Block 9: Distribution Statement E. Distribution authorized to DoD Components only (Proprietary Information) Other requests for this document shall be referred to Commander, Naval Surface Warfare Center, Philadelphia Division, 5001 S. Broad Street, Building 4, Philadelphia, PA 19112.
Blocks 10, 11, 12, 13 - SSP shall be submitted yearly or when requested by the Government. The first submission shall be submitted no later than 30 days after award of an order.
BLK 14: Submit via electronic mail in a digital format that can be read by Microsoft Office 2010 applications (or earlier) or Adobe PDF applications.
Email address for TPOC submission shall be as follows unless othewise directed by the GoverNment: jacob.d.guendelsberger.civ@us.navy.mil
Date: 2024.01.09 15:15:02 -05'00'
Date: 2024.01.06 16:37:32 -05'00'
Intentionally left blank conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
A085 List of All Deliverables
DI-MISC-81920 SOW 4.0 NSWC PD C/554
BLOCKS 11-13: Contractor to submit List of All Deliverables at every delivery.
For all software items, the following information should be included: equipment on which installed, name of the application, version of the application, purpose of the application, whether or not it is IA enabled, Common Criteria evaluation status, FAM status, and DADMS ID number.
Date: 2024.01.09 15:16:16 -05'00'
Date: 2024.01.06 16:39:53 -05'00' conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
A053 LOGISTICS MANAGEMENT INFORMATION (LMI) ENGINEERING DATA FOR PROVISIONING
(EDFP)
DI-SESS-82294 SOW 4.0 NSWCPD C/554
DD
A* D
ONE/R
(BLK 4) – EDFP shall be IAW paragraph 3.9 of the Provisioning SOW.
Format and content shall meet the latest industry standards and shall Include a complete Bill of Material (BOM). EDFP shall contain all appropriate annotations, i.e., proper Distribution Statements, Military Critical Technology markings, etc. The following order of precedence required for EDFP:
a. Technical Data equivalent to approved Product Engineering Drawings as defined in MIL-STD-31000
b. Commercial drawings
c. Commercial manuals, catalogs or catalog descriptions
d. Sketches or photographs with a brief description of dimensional, material, mechanical, electrical or other characteristics.
BLK 8, 11-13: Submission Requirements will be determined at Provisioning Guidance Conference (PGC). Revisions shall be submitted with Data Product Deliverable unless instructed otherwise at the PGC and delivered concurrent with the Design Change Notices.
(BLK 14) – Drawings shall be in digital form. The formats for these Engineering drawings shall be submitted in both:
a. Native CAD.
b. Adobe Systems Portable Data Format (PDF 9.0 or higher)
PEO Ships AMB shall receive a Letter of Transmittal only for contractual tracking purposes.
Date: 2024.01.09 14:07:28 -05'00'
Date: 2024.01.05 20:08:39 -05'00' conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
A FNCL
A004 OTHER DIRECT COSTS (ODCs) REPORT ODC STATUS REPORT
DI-FNCL-81866 SOW 4.0 NSWC PD C/554
COR 0 1
agencies only for contractor performance evaluation, 06 Jan 2024. Other requests for this
Date: 2024.01.09 09:49:57 -05'00'
Date: 2023.12.17 10:11:35 -05'00'
D. SYSTEM/ITEM E. CONTR
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .