National Park Service, National Mall and Memorial Parks, Buckeye Building Roof
Closed Pre-Solicitation Posted
Not the latest version. See the latest solicitation from .
- Solicitation number
- 140P3021Q0034
- Agency
-
National Office
National Park Service, Department of the Interior
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238160 Roofing Contractors
- PSC
- 5650 Roofing And Siding Materials
- Place of performance
- Buckeye Building Washington DC 20024, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This pre-solicitation notice is for the replacement of the roof on the Buckeye Building located at the National Mall and Memorial Parks in Washington, DC. The National Park Service seeks to procure labor, materials and equipment necessary to remove the existing metal roof and replace it with a new structural steel deck and thermoplastic polyolefin or ethylene propylene diene terpolymer membrane roofing system. Proposals are due by July 15, 2021 and must include a description of the roofing system and installation process to be utilized. The award will be a firm fixed-price purchase order to the responsible small business offering the best value based on technical approach and price.
This is a 100% total small business set-aside with a NAICS code of 238160 and PSC code of 5650. The estimated value is between $100,000 to $250,000 and the period of performance is 120 days from notice to proceed. Prevailing wage rates apply and the contractor must be registered in SAM under NAICS 238160.
Notice text
PRESOLICITATION NOTICE ONLY - National Park Service, National Mall and Memorial Parks, Buckeye Building
(1) Action Code. NAICS is 238160 and the business size standard is $16.5 M.
(2) Date. 5/26/21
(3) Year. 2021
(4) Contracting Office ZIP Code. 20242
(5) Product or Service Code. 5650
(6) Contracting Office Address. 1100 Ohio Dr., S.W. Washington, DC 20242
(7) Subject. NAMA Buckeye Building Roof Replacement
(8) Proposed Solicitation Number. 140P3021Q0034
(9) Closing Response Date. 7/15/21
(10) Contact Point or Contracting Officer. Craig Madison at craig_madison@nps.gov
(11) Contract Award and Solicitation Number. N/A
(12) Contract Award Dollar Amount. N/A
(13) Line Item Number. N/A
(14) Contract Award Date. N/A
(15) Contractor. N/A
(16) Description
This is a pre-solicitation notice only and does not constitute a solicitation. Accordingly, no response is due at this time, nor will any questions of a technical or contractual nature be answered. Specific instructions on submitting responses will be contained in solicitation documents. A date and time for a site visit will be specified in the solicitation. A firm fixed priced purchase order is anticipated. Requirement is 100% set-aside for small business. The applicable NAICS is 238160 and the business size standard is $16.5 M size standard. Contractor shall be registered in System for Award Management (SAM)under the appropriate NAICS code.
In accordance with Federal Acquisition Regulations (FAR) Subpart 36.204, Disclosure of Magnitude of Construction Project, the magnitude of this project is (B) between $100,000 and $250,000.
The Buckeye Building is located at 750 Buckeye Drive SW, Washington, DC, 20024
The period of performance is for 120 days from the issuance of the Notice to Proceed.
In compliance with FAR 22.403-1, Construction Wage Rate Requirements, the prevailing wage rates will apply. A solicitation will be issued as a Request for Quote (RFQ) solicitation. The solicitation subsequent to this announcement may be canceled at any time.
NOTE: This notice does not obligate the government to award a contract nor does it obligate the government to pay for any quote preparation costs. Complete solicitation and attachments will be posted on or about June 10th, 2021.
The contractor shall provide the National Park Service, with all labor, supplies, materials, equipment and travel, necessary to perform the work described in this contract for the National Mall and Memorial Parks. The work shall include but is not limited to replacing the roof of the Buckeye Building with approved materials. The contractor will provide a proposal that describes the Thermoplastic Polyolefin (TPO) or Ethylene Propylene Diene Terpolymer (EPDM) system that will be installed and the process by which it will be installed. Submit materials in proposal. The following requirements must be followed when submitting proposal.
A. Existing metal roof to be removed and replaced with a structural steel decking without disturbing the existing fiberglass insulation.
a. Decking shall be a minimum of 22-gauge, Type B steel roof decking
b. Decking shall be mechanically attached.
c. Structural ridge plates shall be used to bridge the two slopes.
d. Relocation of wire and conduit shall be done to minimize the amount of protrusions and/or protrusion locations during the installation of new decking.
B. Roof top units shall remain operational and intact during this project
a. Windscreen shall be removed around the units, reconfigured, and reinstalled.
b. Units shall be blocked up and existing framework under them shall be removed (this framework is excessive and was not replaced when units were upgraded)
c. New pedestals shall be created for the units to sit on.
d. When creating the new pedestals and wind screen for the units, reducing the amount of roof penetrations shall be a top priority.
C. First layer of polyiso insulation board shall be mechanically fastened to the steel decking. Second layer shall be adhered to the first layer.
a. All exposed insulation must be protected and covered to prevent invasive pests.
D. Roof membrane shall be adhered to the iso board using industry best practices.
a. Membrane shall be white or black in color.
b. All penetrations shall be sealed at least 6¿ higher than the roof deck.
c. No ¿peel and stick¿ joints shall be accepted.
d. If TPO is used, all seams, corners, and flashing shall be heat welded.
E. Edges of roof above gutters must have proper flashing with a drip edge to ensure the flow of water does not enter the interior of the building or the insulated area.
F. New fascia shall be installed on all sloped edges.
a. Color shall match existing fascia/metal siding.
G. Install walkway to rooftop units from designated access point.
a. Access point will be above the access ramp to the entrance on the south side of the building.
b. Walkway shall be walk pads designed for the type of membrane used and installed using industry best practices.
c. Walkway shall be a different color to help identify it as the walkway
Notice history
| Notice | Type | Posted |
|---|---|---|
| National Park Service, National Mall and Memorial | Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Denver, CO Denver P&DC Roof Replacement K95856 | United States Postal Service | No set-aside | |
| NY montezuma NWR main shop roof | — | Total Small Business | |
| HST Roof Safety Construction Project | — | No set-aside | |
| Building 434 Roof Repair | Naval Facilities Engineering Command | Competitive 8(a) | |
| Cooling Tower, Roofing, and Structural Construction | Bureau of Engraving and Printing | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity