Nail Canyon Wash Restoration (Snake Gulch)

Closed Pre-Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest solicitation from .

Solicitation number
127EAX25R0007
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Fredonia, Arizona 86022, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of Agriculture Forest Service is seeking contractors for the Nail Canyon Wash Restoration project in the North Kaibab Ranger District of Arizona's Kaibab National Forest. The project involves installing two rolling dips and implementing bank stabilization and armoring at five locations using geotextile and riprap materials on National Forest System Roads 423 and 642, with optional road reconditioning and resurfacing work on NFSR 22. The restoration work aims to improve road resilience against weather events, particularly flooding in post-fire environments, and will utilize commercial material sources. Contractors must adhere to the Federal Highway Administration's Standard Specifications for Construction of Roads and Bridges (FP-14), submit quality control and traffic control plans, provide weekly status reports, and ensure their representative has experience in road maintenance and reconditioning. The pre-solicitation notice was posted on August 4, 2025, with a response deadline of August 18, 2025, giving potential contractors a two-week window to prepare their submissions.

This procurement opportunity is designated as a Total Small Business set-aside, restricting participation to qualified small business contractors. The optional road reconditioning work on NFSR 22 includes three segments: mile post 21.25 to 22.25, mile post 22.25 to 23.25, and mile post 23.25 to 23.75, involving roadway reconditioning and aggregate surface course placement. Contractors must comply with comprehensive fire safety protocols outlined in the Kaibab National Forest Fire Plan, including maintaining specific firefighting equipment, following work hour restrictions, and adhering to different fire precaution plans based on daily fire danger ratings during the forest's fire season from April 15 to November 15. The project requires a 14-day advance notification prior to mobilization and includes strict fire safety requirements that could result in immediate contract suspension or termination for violations. While the government files reference a detailed cost estimate, specific contract values or budget ranges are not disclosed in the publicly available pre-solicitation materials.

Notice text

This project includes the installation of two rolling dips and five locations of bank stabilization and armoring using geotextile and riprap on NFSR 423 and 642. Optional items include road reconditioning and resurfacing on NFSR 22. This project will utilize commercial sources of material.

Files

File Type Posted
Snake Gulch Drawings.pdf PDF
Statement of Work.pdf PDF
SOI_Snake Gulch.pdf PDF
FSSS snake gulch-updated.pdf PDF
KNF_FIRE_PLAN.pdf PDF

Notice history

Notice Type Posted
0307 Q2 CON end nkrd nail canyon wash restoration Award Award Notice
Nail Canyon Wash Restoration (Snake Gulch) Latest solicitation Solicitation
This notice Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
New Mexico Forest Engineering and Road Maintenance (FERM) Santa Fe, New Mexico 87501, United States · NAICS 237310 Forest Service Total Small Business
Chino Emergency Repairs Chino Valley, Arizona 86323, United States · NAICS 236220 Forest Service Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors