This document is a Government Estimate for the North Kaibab Ranger District Nail Canyon Wash Restoration project (Requisition No. 1145306) for the U.S. Forest Service. The base contract includes mobilization, drainage excavation for two rolling dips, geosynthetics installation, machine-placed riprap, and temporary traffic control on Forest Service Roads (FSR) 423 and 642. Optional line items cover roadway reconditioning and aggregate surface course placement on FSR 22 across three segments: MP 21.25-22.25, MP 22.25-23.25, and MP 23.25-23.75. The project involves road improvements and bank stabilization using commercial-source materials, with specific requirements for compaction methods, geotextile placement, and road surface treatment. The estimate provides a detailed breakdown of quantities and estimated units for each project component, marked as confidential for internal government use.

View the file

Other files

File Type Posted
FSSS snake gulch-updated.pdf PDF
KNF_FIRE_PLAN.pdf PDF
Statement of Work.pdf PDF
Snake Gulch Drawings.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT North Kaibab Ranger District Nail Canyon Wash Restoration (Snake Gulch) UNIT North Kaibab Ranger District

REUQISITION NO. 1145306

Base- FSR 423 and 642 Method of Estimated Estimated

Pay Item Description Measure Quantity Pay Unit Unit Cost Total

15101 Mobilization LSQ 1 LS

20421 Drainage Excavation, Construction Type I Rolling Dip, Tolerance Class 'A', Compaction Method A EA 2 EA 20701 Earthwork Geosynthetics, Class 1 Non-Woven Geotextile, Surface Preparation Incidental CQ 450 SY

25101 Machine-Placed Rip Rap, Class 2, Acceptance Method A CQ 650 CY

63501 Temporary Traffic Control LSQ 1 LS

Base Total

Option A- FSR 22 MP 21.25-22.25

30315

Roadway reconditioning, compaction using Placement Method 3 per FSSS 204.11(c). Costs associated with cattle guard cleaning per FSSS 303.07 are indirect, and shall be incidental to this line item CQ 1 MI

30115 Commercial-source aggregate surface course, Gradation specification per FSSS 703.05(b), 4" (compacted in place) depth, compaction Method A per FSSS 301.05 CQ 1 MI

Option A Total

Option B- FSR 22 MP 22.25-23.25

30315

Roadway reconditioning, compaction using Placement Method 3 per FSSS 204.11(c). Costs associated with cattle guard cleaning per FSSS 303.07 are indirect, and shall be incidental to this line item CQ 1 MI

30115 Commercial-source aggregate surface course, Gradation specification per FSSS 703.05(b), 4" (compacted in place) depth, compaction Method A per FSSS 301.05 CQ 1 MI

Option A Total

Option C- FSR 22 MP 23.25-23.75

30315

Roadway reconditioning, compaction using Placement Method 3 per FSSS 204.11(c). Costs associated with cattle guard cleaning per FSSS 303.07 are indirect, and shall be incidental to this line item CQ 0.5 MI

30115 Commercial-source aggregate surface course, Gradation specification per FSSS 703.05(b), 4" (compacted in place) depth, compaction Method A per FSSS 301.05 CQ 0.5 MI

Option A Total

Base + All Options

NORTH KAIBAB RANGER DISTRICT/KAIBAB NF

PROJECT TITLE: North Kaibab Ranger District Nail Canyon Wash Restoration (Snake Gulch)

REQUISITION NO: 1145306

GOVERNMENT ESTIMATE

For Internal Official Government use only –Confidential