Naha Trail Phase 2 Restoration

Closed Pre-Solicitation Posted

Solicitation number
1240BJ24R0016
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Ketchikan, Alaska, United States
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

Paragraph 1:

The U.S. Department of Agriculture Forest Service is seeking construction contractors for the Naha Trail Phase 2 Restoration project in the Tongass National Forest, Alaska. The project involves the reconstruction of approximately 1.1 miles of the Naha Trail, including the demolition and removal of existing wood trail structures and the installation of new trail elements such as bridges, boardwalks, aggregate surfacing, retaining walls, and drainage features. An optional item is included for the demolition and removal of excess boardwalk structures. All offerors must be registered in the System for Award Management (SAM) prior to submitting a proposal, which is due by September 19, 2024.

Paragraph 2:

This procurement is set aside for small businesses. The estimated value of the contract is between $500,000 and $1,000,000. The work must be completed by August 30, 2025. The solicitation package includes engineering drawings, project specifications, a trail log, and a prevailing wage determination from the Department of Labor that lists the required labor classifications and rates for the construction work.

Notice text

2 versions

Update #2 · Latest ·

Naha Trail Phase 2 Reconstruction
Tongass National Forest - Ketchikan Misty Fjords Ranger District

The cut-off for pre-bid questions is due September 3, 2024, by 5:00PM AKDT.

Offerors must respond as described in Sections L and M. Proposals that fail to provide a complete response to the Technical Evaluation Factors (Section M) may be rejected and not considered further.

Update #1 ·

The Tongass National Forest requires construction work on the Ketchikan Misty-Fjords Ranger District. The project involves reconstruction of just over 1 mile of the Naha Trail. Work starts at station 22+04 and ends at to the barge ramp (station 79+76). Work may also comprise of reconstruction of .6 miles of the Naha trail starting at station 79+76 and ending at 111+46, the property boundary to the Orton Ranch. Major work items include the demolition and removal of approx.1.1 miles of wood trail structures, and installation of trail structures such as 3 trail bridges (BR), aggregate surfacing (AS), retaining logs (ASR), stepping stones (SS), stone retaining walls (SRW), stone open drains (SOD), drainage dips (DD), cut rock steps (CRS), solid rock removal (SRR), boardwalk (BW-A), step-and-run boardwalk (BW-B), elevated boardwalk (BW-C), and boardwalk bridges (BW-D). Additional option Item is for the demolition and removal of excess boardwalk structures piled up adjacent to Naha Trail before start of work.

Note: Per FAR 52.204-7(b)(1), System for Award Management (SAM), an Offeror is required to be registered in SAM when submitting an offer and shall continue to be registered until time of award, during performance, and through final payment for any contract resulting from this solicitation. Information on registration may be obtained via: https://www.sam.gov. All Offerors must complete the electronic version of the Representations and Certifications in the SAM system.

This announcement serves as the Pre-Solicitation notice only. Responses to this synopsis are not required.

Files

File Type Posted
Naha Trail Drawing.pdf PDF
1240BJ24R0016 Solicitation Packet.pdf PDF
SF24_BidBond.pdf PDF
Naha Trail_ProjectSpecs.pdf PDF
Naha Phase 2 Trail Log ext B.pdf PDF
General Decision Number AK20240002 01.05.2024.pdf PDF

Similar open opportunities

Opportunity Agency Set-aside Responses due
Acadia National Park Maine, United States · NAICS 237310 Federal Highway Administration Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity