About this opportunity

The Department of Energy seeks qualified roofing contractors to replace existing built-up roofs at Princeton Plasma Physics Laboratory (PPPL) on four buildings: C50 ESAT Building, C52 PLT Power Building, C60 C Site Pump House, and D45 Rad Waste Handling Facility. The contractor must provide complete roof replacement services including demolition of existing membranes, insulation, and trim; installation of two layers of 2.6-inch ISO insulation, one-half-inch HD coverboard, and 145-mil Carlisle Fleeceback EPDM membrane; and installation of new roof drains, gutters, scuppers, and perimeter guardrails. All work must comply with PPPL's Integrated Safety Management Plan, OSHA standards, and environmental requirements, with work performed during normal business hours (7:00 AM to 3:30 PM, Monday through Friday) unless otherwise approved. Proposals are due by February 27, 2026, and must include both bundled pricing for all four buildings and separate phased pricing for each individual building. Prospective bidders must submit a bid bond or certified check equal to at least 20% of the total proposed price, and the awarded contractor will be required to provide performance and payment bonds each equal to 100% of the subcontract price within ten calendar days of award.

This is a full and open competition procurement with no set-aside designation, using NAICS Code 238160 (Roofing Contractors) with a small business size standard of $19.0 million in annual sales. The project encompasses approximately 20,008 square feet of roofing work across the four buildings, with no current incumbent contractor identified in the solicitation materials. Award value and budget information have not been disclosed in the available solicitation documents. The Construction Wage Rate Requirements Statute applies to this work, requiring the contractor to provide employees with wages and benefits no less than those specified in the latest U.S. Department of Labor Wage Determination Decision and to submit weekly certified payroll reports. Work will be performed at Princeton Plasma Physics Laboratory, located at 100 Stellarator Road, James Forrestal Campus, Princeton, New Jersey 08543, with all personnel requiring REAL ID-compliant identification and safety training clearance before site access.

Notice text

2 versions

Update #2 · Latest ·

There are several existing roofs (C50 ESAT Building/C52 PLT Power Building/C60 C Site Pump
House/D45 Rad Waste Handling Facility) which are past their useful life requiring costly
maintenance to upkeep. Severe water infiltration occurs regularly at failing joints, punctures,
and flashing. Portions of existing metal coping have pulled away during storm events causing
large sections of membrane to separate from the substrate. A catastrophic failure to one of
these roofs would negatively impact the ability to conduct the top priority experimental
operations in the Laboratory.
1.2. SCOPE
1.2.1. The Subcontractor shall provide all materials, labor, supervision, equipment, and expertise
required replace the noted roofs and specified components per the associated contract
documents. Construction scope includes the following:
1.2.1.1. Remove and replace existing built-up roofs at PPPL. Buildings include:
1.2.1.1.1. C50 – ESAT Building
1.2.1.1.2. C52 – PLT Power Building
1.2.1.1.3. C60 – C Site Pump House
1.2.1.1.4. D45 – Rad Waste Handling Facility
1.2.1.2. Demolition including removal of existing membrane, cover board, insulation, metal trim,
flashing, coping and any other miscellaneous roofing material accessories.
1.2.1.3. Remove and recycle stone ballast on ballasted roofs. Recycle documentation to be
provided to PPPL.
1.2.1.4. Additional integrated roof elements shall be inspected and replaced as specified within
this SOW. Elements include: wood blocking, roof drains, gutters, scuppers, downspouts,
and metal/concrete roof panels.
1.2.1.5. Abandoned equipment shall be removed to a point that does not affect new roof
installation. Any equipment that should be temporarily relocated so roof replacement
work can be completed shall be the responsibility of the roofing contractor.
1.2.1.6. Contractor to furnish and install 2 layers of 2.6” ISO.
1.2.1.7. Contractor to furnish and install ½” HD coverboard mechanically fastened.
1.2.1.8. Contractor to furnish and install 145 mil Carlisle Fleeceback EPDM, black in color adhered
to coverboard.
1.2.1.9. Contractor to furnish and install counter flashing and copings, expansion joints and other
roofing components as required for manufacturer’s warranty.
Page 3 of 21
1.2.1.10. The new roof system shall be comprised of the following materials: EPDM membrane,
cover board, and insulation.
1.2.1.10.1. Meets a minimum insulating value of R-30 average. Modifications to the existing
building envelope are required to accommodate additional insulation.
1.2.1.10.2. Flexible walkway pads shall be provided to all operating equipment/drain locations
and as necessary to meet manufacturer’s requirements.
1.2.1.10.3. All materials shall be furnished by Carlisle Syntec Systems and shall meet all
manufacturer specifications to obtain a minimum manufacturer system warranty of
30 years along with a 2-year installers warranty. The warranty coverage shall
include incidental membrane punctures, damage from hail and a minimum of 72-
mph peak gust wind speeds.
1.2.1.11. Roof perimeter guardrails shall be provided on all roofs. See attached guardrail cut sheet
for details.
1.2.1.12. New and higher curbs as required due to the new roof installation work.
1.2.1.13. Contractor to build up existing roof vents as required due to the new roof work.
1.2.1.14. Expansion joint to be raised up to account for new roof insulation height for the ESAT
building roof.
1.2.1.15. Contractor to add a new roof drain at the Northwest section of the ESAT building roof.
1.2.1.16. Contractor to replace all existing roof scuppers with new.
1.2.1.17. Contractor to replace all existing roof drains with new.
1.2.1.18. Contractor to provide minimum of 12” overlap between the existing adjacent roof
membrane system and provide written confirmation the systems are compatible.
1.2.1.19. Contractor to temporary relocate and reinstall any fall protection anchor systems
identified on roof sections.
1.2.1.20. Contractor to install secondary drainage per code in addition to existing drains for the PLT
building roof.
1.2.1.21. If necessary, existing asbestos elements shall be mitigated by PPPL. Subcontractor to
assist the abatement contractor to bring the sealed roofing material down from roof area
to grade with lift equipment. Coordination of this work shall be completed in concert with
all other construction activities. The subcontractor to follow directly after PPPL
abatement contractor to install new roofing system. The construction subcontractor shall
be responsible to coordinate all work with PPPL.
1.2.1.22. Any and all equipment that requires power disconnect has to be coordinated with PPPL a
minimum of 72 hours prior. All equipment that will be out of service shall be minimized.
1.2.1.23. All roof fans and equipment are to be salvaged, protected, and reinstalled.

THERE ARE (5) COVER LETTER SECTIONS TO THE RFP.  THERE ARE FILES ATTACHED TO EACH COVER LETTER.  TO VIEW THE ATTACHMENTS YOU MUST

(1) FIRST DOWNLOAD EACH COVER LETTER SECTION TO YOUR DESKTOP. 

(2) AFTER DOWNLOADING EACH COVER LETTER--REOPENED EACH ONE (ON YOUR DESKTOP)

YOU SHOULD BE ABLE TO SEE THE ATTACHED FILES ON THE RIGHT HAND SIDE OF THE COMPUTER SCREEN.   BE SURE TO UTILIZE ADOBE ACROBAT SOFTWARE TO VIEW THE PDF FILES

Update #1 ·

There are several existing roofs (C50 ESAT Building/C52 PLT Power Building/C60 C Site Pump
House/D45 Rad Waste Handling Facility) which are past their useful life requiring costly
maintenance to upkeep. Severe water infiltration occurs regularly at failing joints, punctures,
and flashing. Portions of existing metal coping have pulled away during storm events causing
large sections of membrane to separate from the substrate. A catastrophic failure to one of
these roofs would negatively impact the ability to conduct the top priority experimental
operations in the Laboratory.
1.2. SCOPE
1.2.1. The Subcontractor shall provide all materials, labor, supervision, equipment, and expertise
required replace the noted roofs and specified components per the associated contract
documents. Construction scope includes the following:
1.2.1.1. Remove and replace existing built-up roofs at PPPL. Buildings include:
1.2.1.1.1. C50 – ESAT Building
1.2.1.1.2. C52 – PLT Power Building
1.2.1.1.3. C60 – C Site Pump House
1.2.1.1.4. D45 – Rad Waste Handling Facility
1.2.1.2. Demolition including removal of existing membrane, cover board, insulation, metal trim,
flashing, coping and any other miscellaneous roofing material accessories.
1.2.1.3. Remove and recycle stone ballast on ballasted roofs. Recycle documentation to be
provided to PPPL.
1.2.1.4. Additional integrated roof elements shall be inspected and replaced as specified within
this SOW. Elements include: wood blocking, roof drains, gutters, scuppers, downspouts,
and metal/concrete roof panels.
1.2.1.5. Abandoned equipment shall be removed to a point that does not affect new roof
installation. Any equipment that should be temporarily relocated so roof replacement
work can be completed shall be the responsibility of the roofing contractor.
1.2.1.6. Contractor to furnish and install 2 layers of 2.6” ISO.
1.2.1.7. Contractor to furnish and install ½” HD coverboard mechanically fastened.
1.2.1.8. Contractor to furnish and install 145 mil Carlisle Fleeceback EPDM, black in color adhered
to coverboard.
1.2.1.9. Contractor to furnish and install counter flashing and copings, expansion joints and other
roofing components as required for manufacturer’s warranty.
Page 3 of 21
1.2.1.10. The new roof system shall be comprised of the following materials: EPDM membrane,
cover board, and insulation.
1.2.1.10.1. Meets a minimum insulating value of R-30 average. Modifications to the existing
building envelope are required to accommodate additional insulation.
1.2.1.10.2. Flexible walkway pads shall be provided to all operating equipment/drain locations
and as necessary to meet manufacturer’s requirements.
1.2.1.10.3. All materials shall be furnished by Carlisle Syntec Systems and shall meet all
manufacturer specifications to obtain a minimum manufacturer system warranty of
30 years along with a 2-year installers warranty. The warranty coverage shall
include incidental membrane punctures, damage from hail and a minimum of 72-
mph peak gust wind speeds.
1.2.1.11. Roof perimeter guardrails shall be provided on all roofs. See attached guardrail cut sheet
for details.
1.2.1.12. New and higher curbs as required due to the new roof installation work.
1.2.1.13. Contractor to build up existing roof vents as required due to the new roof work.
1.2.1.14. Expansion joint to be raised up to account for new roof insulation height for the ESAT
building roof.
1.2.1.15. Contractor to add a new roof drain at the Northwest section of the ESAT building roof.
1.2.1.16. Contractor to replace all existing roof scuppers with new.
1.2.1.17. Contractor to replace all existing roof drains with new.
1.2.1.18. Contractor to provide minimum of 12” overlap between the existing adjacent roof
membrane system and provide written confirmation the systems are compatible.
1.2.1.19. Contractor to temporary relocate and reinstall any fall protection anchor systems
identified on roof sections.
1.2.1.20. Contractor to install secondary drainage per code in addition to existing drains for the PLT
building roof.
1.2.1.21. If necessary, existing asbestos elements shall be mitigated by PPPL. Subcontractor to
assist the abatement contractor to bring the sealed roofing material down from roof area
to grade with lift equipment. Coordination of this work shall be completed in concert with
all other construction activities. The subcontractor to follow directly after PPPL
abatement contractor to install new roofing system. The construction subcontractor shall
be responsible to coordinate all work with PPPL.
1.2.1.22. Any and all equipment that requires power disconnect has to be coordinated with PPPL a
minimum of 72 hours prior. All equipment that will be out of service shall be minimized.
1.2.1.23. All roof fans and equipment are to be salvaged, protected, and reinstalled.

Files

Similar open opportunities

Opportunity Agency Set-aside Responses due
GAOA Remove and Replace Roofing on Island Park Admin Site Housing Units Island Park, Idaho 83429, United States · NAICS 238160 Forest Service Total Small Business
SLV-CB pumping plant roof 16399 Lane 6 N Mosca, Colorado 81146, United States · NAICS 238160 Bureau of Reclamation Total Small Business