Marley NC 9200 / 8310 Cooling Towers

Closed Solicitation Posted

Solicitation number
SJ446871
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Upton, New York 11973, United States

Notice details come from SAM.gov. Updated .

About this opportunity

Summary of the Solicitation Notice:

The Department of Energy Office of Science is seeking to procure cooling tower components and related supplies for the Brookhaven National Laboratory located in Upton, NY. The requirement includes replacement parts for two different cooling tower models (NC8310 and NC9200) such as eliminator sections, fill material, gearboxes, and oil. The agency will award the contract(s) to the responsive and responsible offeror(s) who submits the lowest total price and meets all technical requirements. Multiple awards may be made if it is in the best interest of the agency. The solicitation has a posted date of May 6, 2024 and a response due date of May 24, 2024.

This solicitation does not have any set-aside designations. The notice does not mention any potential incumbent contractors. The total value of the contract is not provided, but the quantity details are specified, including 2 each of various cooling tower components and 6 gallons of oil. The place of performance is Upton, NY 11973, USA.

Notice text

BSA will make award(s) to the responsive and responsible offeror(s) who submits the lowest total price and who meets all of BSA’s technical requirements, as stated herein. Multiple Awards may be made if in the best interest of BSA.

  • Qty2 : Tower Model (box size) NC8310, TU12X Eliminator replacement (top section only) includes packs and stainless steel hardware to re-install bottom retainer, per cell.
  • Qty2 : Tower Model (box size) NC8310, TU12X Eliminator replacement (bottom section only) includes packs only, per cell.
  • Qty2 : GEAREDUCER  2250 5.50 CC2
  • Qty6 : Oil Synthetic, ISO 150, 1 Gallon container
  • Qty2 : Tower Model NC8310, 20mil MX75 fill replacement includes fill sheets, splice tubes(to splice cut tubes back together) and all hardware to install, per cell, for stainless steel tower.
  • Qty2 : Tower Model (box size) NC9200, TU12X Eliminator replacement (top section only) includes packs and stainless steel hardware to re-install bottom retainer, per cell.
  • Qty2 : Tower Model (box size) NC9200, TU12X Eliminator replacement (bottom section only) includes packs only, per cell.
  • Qty2 : GEAREDUCER  2250 4.56 CC2
  • Qty6 : Oil Synthetic, ISO 150, 1 Gallon container
  • Qty2 : Tower Model NC9200, 20mil MX75 fill replacement includes fill sheets, splice tubes(to splice cut tubes back together) and all hardware to install, per cell, for stainless steel tower.

FOB ORIGIN Collect

Files

File Type Posted
Supplier Quality Assurance Requirements.docx DOCX document

Similar open opportunities

Opportunity Agency Set-aside Responses due
Cooling Tower, Roofing, and Structural Construction District of Columbia 20024, United States · NAICS 236220 Bureau of Engraving and Printing Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity