Market Research/Industry Feedback for potential Progressive Design-Build (PDB)/OTA projects at Tinker AFB

Closed Pre-Solicitation Posted

Solicitation number
W912BV26SDF01
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
Not on record
PSC
Not on record
Place of performance
Midwest City, Oklahoma, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Corps of Engineers, Tulsa District, is conducting market research and seeking industry feedback on optimal project delivery methods and contracting vehicles for four MILCON projects at Tinker Air Force Base, Oklahoma, with responses due by 2:00 PM CST on July 23, 2026.

The four projects total approximately $320 million in combined estimated value: a 2-Dock Program Depot Maintenance Hangar ($124 million, 102,150 GSF, 2.5–3 year performance period); Aircraft Pavement and Engine Runup facilities ($60 million, 45,000 GSF, 1.5–2 year performance period); a second 2-Dock Program Depot Maintenance Hangar with plant equipment support ($115 million, 102,150 GSF, 2.5–3 year performance period); and a Support Shops and Staging Building ($24 million, 40,000 GSF, 1.5–2 year performance period). All involve high-bay maintenance facilities with administrative spaces, specialized shops, airfield improvements, and infrastructure work.

The Government seeks evaluation of four delivery methods: Design-Bid-Build, Construction Manager at Risk under OTA, Design-Build to Budget under FAR, and Progressive Design-Build under OTA. Industry input must address company information, bonding capacity, socioeconomic status, budget realism assessment, cost drivers and schedule risks, collaboration priorities, contract incentive preferences, and delivery recommendations with supporting rationale. The Government also requests feedback on early price certainty feasibility, relevant project experience, proposal development stipend requirements, and capability to serve as prime contractor across all four projects.

Responses should be directed to Daniel Foyil at Daniel.A.Foyil@usace.army.mil.

Notice text

The Government seeks your expert feedback to select the optimal project delivery method and contracting vehicle (FAR-based or OTA) for various Tinker AFB facilities.  Please email your response to Daniel Foyil – Daniel.A.Foyil@usace.army.mil, U.S. Army Corps of Engineers, Tulsa District (CECT-SWT), no later than 2:00PM CST 23 July 2026.  (SEE ATTACHED)

Files

File Type Posted
Tinker AFB Market Research(3).docx DOCX document
Tinker AFB Market Research(2).pdf PDF

Similar open opportunities

Opportunity Agency Set-aside Responses due
Request for Information - Market Intelligence Survey** Use of OTA for E-7 Squad Ops Facility - Tinker AFB, OK Tinker Air Force Base, OK 73145 · NAICS 236220 ENDIST Tulsa No set-aside
Tinker AFB 2026 Multiple Award Construction Contract (MACC) Tinker AFB, Oklahoma 73145, United States · NAICS 236210 Air Force Sustainment Center Partial Small Business
Child Development Center (CDC), Tinker Air Force Base, Oklahoma NAICS 236220 ENDIST Tulsa No set-aside
WWYK260004 - repair structural integrity, B1134, post 34 & north wall Tinker AFB, Oklahoma 73145, United States · NAICS 238190 Air Force Sustainment Center Total Small Business
E-7 Squadron Operations Facility - Tinker Air Force Base, OK Tinker Air Force Base, OK 73145 · NAICS 236220 ENDIST Tulsa No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors