Major Repairs on Multiple Structures at US Coast Guard Boston Light on Little Brewster Island

Award Notice Posted

Solicitation number
HSCGG1-14-R-PXL001
Agency
Awarded
to Cenaxo, LLC
Set-aside
Total Small Business

Opportunity facts

Contract number
HSCGG1-14-C-PXL001 Federal contract award
NAICS code
236220 Commercial and Institutional Building Construction
PSC
Not on record
Place of performance
Uscg Boston Light, Little Brewster Island Hull, Massachusetts 02109, United States

Notice details come from SAM.gov. Updated .

Notice text

11 versions

Update #11 · Latest ·

SYNOPSIS
Solicitation: HSCGG1-14-R-PXL001
Project Serial Number (PSN): 5522706

The United States Coast Guard, Civil Engineering Unit - Providence, has a construction requirement for major exterior repairs on multiple structures at Boston Light on Little Brewster Island, MA.

This is an FY14 project, subject to the availability of funds.

This acquisition is a total small business set-aside. NAICS code is 236220 - Commercial and Institutional Building Construction, with small business size standard of $33.5M.

The Contracting Office is the USCG, CEU-Providence, located at 475 Kilvert Street, Suite 100, Warwick, RI 02886.

Solicitation release date: 24 September 2013

Site visit rescheduled for 3 Oct, leaving USCG Station Point Allerton (Hull, MA) at 0900. Visit is pending weather, emergency operations. If attending, notify David Feit (@ David.Feit@uscg.mil) of the number of people in your party. SITE VISIT WAS CANCELED BECAUSE OF THE GOVERNMENT SHUTDOWN

IN THE EVENT OF A GOVERNMENT SHUTDOWN, the site visit will still proceed as scheduled (weather- and emergency operations- permitting). However, neither a Government contract specialist nor a Government construction project manager or designer (i.e. technical resource) will be present at the visit.

Therefore, all questions, comments or RFIs must be submitted in writing to the contract specialist (David Feit, at David.Feit@uscg.mil) as soon as possible, but no later than the questions due date, 15 Oct. Questions/Comments/RFIs should be as detailed as possible and should included photos/sketches as necessary.

Proposal due date: EXTENDED TO 7 November 2013

Magnitude of Project: between $500,000 and $1,000,000

Base Scope of Work
The contractor shall provide all labor, materials, equipment, supervision, transportation and disposal necessary to effect the following and incidental related work.

Boathouse: The work includes removing existing wood shingle roofing, providing new wood shingle roofing, new copper flashing, exterior painting, and replacing a damaged wood sash with a new single glazed wood sash.

Oil House: The work includes painting and repairing the cupola, replacing eave and rake trim with new flat trim and molding, repointing the north façade, and exterior painting.

Dwelling (now Station Building): The work includes the following items:
a. Removing existing wood shingle roofing and providing new wood shingle roofing and new copper flashing

b. Provide new copper flashing at the chimney

c. Removing existing roofing and siding at dormer, and providing new wood shingle roofing, new siding, new flashing and new trim

d. Removing existing double hung, awning, and basement windows, and providing new impact-resistant aluminum clad wood windows with simulated divided lites, with new trim and associated patching

e. Removing existing fixed wood sash at the enclosed porch, and providing new fixed wood sash with divided lites. Trim and carpentry work is also included

f. Removing rusted post bases (10) at the ramp, and providing new stainless steel post bases, along with associated carpentry and concrete work

g. Repointing masonry at the basement walls, and repairing the foundation

h. Removing (2) existing doors and frames, and providing (2) new commercial grade flush fiberglass reinforced plastic doors, frames, with integrally colored door faces and frames and new stainless steel hardware

i. Exterior painting

j. At the porch, replacing 12 square feet of tongue and groove panels, and 16 linear feet of 2x3 framing

k. At the roof, replacing 220 square feet of3/4" thick wood board decking

Emergency Generator Building (Former Fog Signal Building): the work includes the following items:
a. Removing existing wood shingle roofing and providing new wood shingle roofing

b. Repointing and rebuilding existing brickwork, and providing new granite lintels

c. Repairing the foundation

d. Removing (3) existing double hung windows, and providing new impact-resistant aluminum clad wood windows with simulated divided lites, with new trim

e. At the gable, removing existing wood shingle siding and providing new wood shingle siding

f. Removing existing rake trim, wood gutters, and molding, and providing new rake trim, wood gutters, new moldings and new trim

g. Providing new copper downspouts with transition sections and elbows

h. Removing a pair of existing doors, and providing a pair of new commercial grade flush fiberglass reinforced plastic door with louvers, frame, with integrally colored door faces and frames and new stainless steel hardware

i. Exterior painting of masonry, (1) window and trim

j. At the roof, replacing 400 square feet of 3/4" thick wood board decking

Lighthouse: The work includes the following items:
a. Removing existing wood shingle roofing and providing new wood shingle roofing at the entry vestibule

b. Repointing at the tower

c. Painting and repairs at existing ironwork and metalwork, including the interior spiral stairway, ladders, doors, decks, windows, railings and the interior and exterior of the cupola.

d. Recoating the tower with Thoroseal plaster


Optional Bid Item Scope of Work
Optional Bid Item 1 includes the following items and incidental related work at the Cistern Building:
Removing existing wood shingle roofing, providing new wood shingle roofing, a new copper gutter and new copper downspouts, carpentry repairs, replacing a section of existing sheathing and providing new wood shingle siding, and exterior painting

IN THE EVENT OF A GOVERNMENT SHUTDOWN, the site visit will still proceed as scheduled (weather- and emergency operations- permitting). However, neither a Government contract specialist nor a Government construction project manager or designer (i.e. technical resource) will be present at the visit.

Therefore, all questions, comments or RFIs must be submitted in writing to the contract specialist (David Feit, at David.Feit@uscg.mil) as soon as possible, but no later than the questions due date, 15 Oct. Questions/Comments/RFIs should be as detailed as possible and should included photos/sketches as necessary.

IMPORTANT NOTICE 10/01/2013  --  THE SITE VISIT SCHEDULED FOR 3 OCTOBER IS HEREBY POSTPONED DUE TO THE GOVERNMENT SHUTDOWN.  THE COAST GUARD WILL PROVIDE NOTICE IF RESCHEDULED FOR NEXT WEEK.

See attached amendment (Amendment 0003).

Alternative pricing and sequencing plan (to accommodate tourists during construction) is required.

Amended Evaluation Methodology to accommodate alternative pricing.

Questions due date extended to 22 OCT.

Proposals due date extended to 7 NOV 2013 at 4 PM local time.

Notice of Pending Funds Availability.

Posting of justification and approval for brand name items.

All amendments must be acknowledged.




See attached amendment (Amendment 0004) and Q&A document.

Proposals due date is extended to 7 Nov 2013 at 4 PM local (Warwick, RI) time.

Update #10 ·

See attached amendment (Amendment 0003).

Alternative pricing and sequencing plan (to accommodate tourists during construction) is required.

Amended Evaluation Methodology to accommodate alternative pricing.

Questions due date extended to 22 OCT.

Proposals due date extended to 01 NOV.

Notice of Pending Funds Availability.

Posting of justification and approval for brand name items.

All amendments must be acknowledged.

Update #9 ·

See attached amendment (Amendment 0002).

Site visits (though unsupervised) are permitted (and strongly encouraged) before 21 OCT 2013. Visits must be coordinated with the lighthouse keeper.

Visits on or after 21 OCT (or after the dock is removed) are prohibited.

Site photos are attached.

All amendments must be acknowledged.

Update #8 ·

IMPORTANT NOTICE 10/01/2013  --  THE SITE VISIT SCHEDULED FOR 3 OCTOBER IS HEREBY POSTPONED DUE TO THE GOVERNMENT SHUTDOWN.  THE COAST GUARD WILL PROVIDE NOTICE IF RESCHEDULED FOR NEXT WEEK.

Update #7 ·

IN THE EVENT OF A GOVERNMENT SHUTDOWN, the site visit will still proceed as scheduled (weather- and emergency operations- permitting). However, neither a Government contract specialist nor a Government construction project manager or designer (i.e. technical resource) will be present at the visit.

Therefore, all questions, comments or RFIs must be submitted in writing to the contract specialist (David Feit, at David.Feit@uscg.mil) as soon as possible, but no later than the questions due date, 15 Oct. Questions/Comments/RFIs should be as detailed as possible and should included photos/sketches as necessary.

Update #6 ·

SYNOPSIS
Solicitation: HSCGG1-14-R-PXL001
Project Serial Number (PSN): 5522706

The United States Coast Guard, Civil Engineering Unit - Providence, has a construction requirement for major exterior repairs on multiple structures at Boston Light on Little Brewster Island, MA.

This is an FY14 project, subject to the availability of funds.

This acquisition is a total small business set-aside. NAICS code is 236220 - Commercial and Institutional Building Construction, with small business size standard of $33.5M.

The Contracting Office is the USCG, CEU-Providence, located at 475 Kilvert Street, Suite 100, Warwick, RI 02886.

Solicitation release date: 24 September 2013

Site visit rescheduled for 3 Oct, leaving USCG Station Point Allerton (Hull, MA) at 0900. Visit is pending weather, emergency operations. If attending, notify David Feit (@ David.Feit@uscg.mil) of the number of people in your party.

IN THE EVENT OF A GOVERNMENT SHUTDOWN, the site visit will still proceed as scheduled (weather- and emergency operations- permitting). However, neither a Government contract specialist nor a Government construction project manager or designer (i.e. technical resource) will be present at the visit.

Therefore, all questions, comments or RFIs must be submitted in writing to the contract specialist (David Feit, at David.Feit@uscg.mil) as soon as possible, but no later than the questions due date, 15 Oct. Questions/Comments/RFIs should be as detailed as possible and should included photos/sketches as necessary.

Proposal due date: 25 October 2013

Magnitude of Project: between $500,000 and $1,000,000

Base Scope of Work
The contractor shall provide all labor, materials, equipment, supervision, transportation and disposal necessary to effect the following and incidental related work.

Boathouse: The work includes removing existing wood shingle roofing, providing new wood shingle roofing, new copper flashing, exterior painting, and replacing a damaged wood sash with a new single glazed wood sash.

Oil House: The work includes painting and repairing the cupola, replacing eave and rake trim with new flat trim and molding, repointing the north façade, and exterior painting.

Dwelling (now Station Building): The work includes the following items:
a. Removing existing wood shingle roofing and providing new wood shingle roofing and new copper flashing

b. Provide new copper flashing at the chimney

c. Removing existing roofing and siding at dormer, and providing new wood shingle roofing, new siding, new flashing and new trim

d. Removing existing double hung, awning, and basement windows, and providing new impact-resistant aluminum clad wood windows with simulated divided lites, with new trim and associated patching

e. Removing existing fixed wood sash at the enclosed porch, and providing new fixed wood sash with divided lites. Trim and carpentry work is also included

f. Removing rusted post bases (10) at the ramp, and providing new stainless steel post bases, along with associated carpentry and concrete work

g. Repointing masonry at the basement walls, and repairing the foundation

h. Removing (2) existing doors and frames, and providing (2) new commercial grade flush fiberglass reinforced plastic doors, frames, with integrally colored door faces and frames and new stainless steel hardware

i. Exterior painting

j. At the porch, replacing 12 square feet of tongue and groove panels, and 16 linear feet of 2x3 framing

k. At the roof, replacing 220 square feet of3/4" thick wood board decking

Emergency Generator Building (Former Fog Signal Building): the work includes the following items:
a. Removing existing wood shingle roofing and providing new wood shingle roofing

b. Repointing and rebuilding existing brickwork, and providing new granite lintels

c. Repairing the foundation

d. Removing (3) existing double hung windows, and providing new impact-resistant aluminum clad wood windows with simulated divided lites, with new trim

e. At the gable, removing existing wood shingle siding and providing new wood shingle siding

f. Removing existing rake trim, wood gutters, and molding, and providing new rake trim, wood gutters, new moldings and new trim

g. Providing new copper downspouts with transition sections and elbows

h. Removing a pair of existing doors, and providing a pair of new commercial grade flush fiberglass reinforced plastic door with louvers, frame, with integrally colored door faces and frames and new stainless steel hardware

i. Exterior painting of masonry, (1) window and trim

j. At the roof, replacing 400 square feet of 3/4" thick wood board decking

Lighthouse: The work includes the following items:
a. Removing existing wood shingle roofing and providing new wood shingle roofing at the entry vestibule

b. Repointing at the tower

c. Painting and repairs at existing ironwork and metalwork, including the interior spiral stairway, ladders, doors, decks, windows, railings and the interior and exterior of the cupola.

d. Recoating the tower with Thoroseal plaster


Optional Bid Item Scope of Work
Optional Bid Item 1 includes the following items and incidental related work at the Cistern Building:
Removing existing wood shingle roofing, providing new wood shingle roofing, a new copper gutter and new copper downspouts, carpentry repairs, replacing a section of existing sheathing and providing new wood shingle siding, and exterior painting

See attached SF30 for Amendment 0001, and other attached documents.
All amendments must be acknowledged.

Site visit is scheduled for 3 October, leaving USCG Station Point Allerton at 0900. Visit is weather- and emergency operations- permitting. Arrive at the station by 0830. If you plan on attending, notify David Feit (at David.Feit@uscg.mil) of the number in your party.

Full size drawings provided.

Updated specification section provided.

Updated section M of the RFP provided.

Update #5 ·

SYNOPSIS
Solicitation: HSCGG1-14-R-PXL001
Project Serial Number (PSN): 5522706

The United States Coast Guard, Civil Engineering Unit - Providence, has a construction requirement for major exterior repairs on multiple structures at Boston Light on Little Brewster Island, MA.

This is an FY14 project, subject to the availability of funds.

This acquisition is a total small business set-aside. NAICS code is 236220 - Commercial and Institutional Building Construction, with small business size standard of $33.5M.

The Contracting Office is the USCG, CEU-Providence, located at 475 Kilvert Street, Suite 100, Warwick, RI 02886.

Expected solicitation release date: 24 September 2013

Tentative Site Visit: 2 October 2013
Site visit rescheduled for 3 Oct, leaving USCG Station Point Allerton (Hull, MA) at 0900. Visit is pending weather, emergency operations and no Government shutdown. If attending, notify David Feit (@ David.Feit@uscg.mil) of the number of people in your party.

Expected proposal due date: 25 October 2013

Magnitude of Project: between $500,000 and $1,000,000

Base Scope of Work
The contractor shall provide all labor, materials, equipment, supervision, transportation and disposal necessary to effect the following and incidental related work.

Boathouse: The work includes removing existing wood shingle roofing, providing new wood shingle roofing, new copper flashing, exterior painting, and replacing a damaged wood sash with a new single glazed wood sash.

Oil House: The work includes painting and repairing the cupola, replacing eave and rake trim with new flat trim and molding, repointing the north façade, and exterior painting.

Dwelling (now Station Building): The work includes the following items:
a. Removing existing wood shingle roofing and providing new wood shingle roofing and new copper flashing

b. Provide new copper flashing at the chimney

c. Removing existing roofing and siding at dormer, and providing new wood shingle roofing, new siding, new flashing and new trim

d. Removing existing double hung, awning, and basement windows, and providing new impact-resistant aluminum clad wood windows with simulated divided lites, with new trim and associated patching

e. Removing existing fixed wood sash at the enclosed porch, and providing new fixed wood sash with divided lites. Trim and carpentry work is also included

f. Removing rusted post bases (10) at the ramp, and providing new stainless steel post bases, along with associated carpentry and concrete work

g. Repointing masonry at the basement walls, and repairing the foundation

h. Removing (2) existing doors and frames, and providing (2) new commercial grade flush fiberglass reinforced plastic doors, frames, with integrally colored door faces and frames and new stainless steel hardware

i. Exterior painting

j. At the porch, replacing 12 square feet of tongue and groove panels, and 16 linear feet of 2x3 framing

k. At the roof, replacing 220 square feet of3/4" thick wood board decking

Emergency Generator Building (Former Fog Signal Building): the work includes the following items:
a. Removing existing wood shingle roofing and providing new wood shingle roofing

b. Repointing and rebuilding existing brickwork, and providing new granite lintels

c. Repairing the foundation

d. Removing (3) existing double hung windows, and providing new impact-resistant aluminum clad wood windows with simulated divided lites, with new trim

e. At the gable, removing existing wood shingle siding and providing new wood shingle siding

f. Removing existing rake trim, wood gutters, and molding, and providing new rake trim, wood gutters, new moldings and new trim

g. Providing new copper downspouts with transition sections and elbows

h. Removing a pair of existing doors, and providing a pair of new commercial grade flush fiberglass reinforced plastic door with louvers, frame, with integrally colored door faces and frames and new stainless steel hardware

i. Exterior painting of masonry, (1) window and trim

j. At the roof, replacing 400 square feet of 3/4" thick wood board decking

Lighthouse: The work includes the following items:
a. Removing existing wood shingle roofing and providing new wood shingle roofing at the entry vestibule

b. Repointing at the tower

c. Painting and repairs at existing ironwork and metalwork, including the interior spiral stairway, ladders, doors, decks, windows, railings and the interior and exterior of the cupola.

d. Recoating the tower with Thoroseal plaster


Optional Bid Item Scope of Work
Optional Bid Item 1 includes the following items and incidental related work at the Cistern Building:
Removing existing wood shingle roofing, providing new wood shingle roofing, a new copper gutter and new copper downspouts, carpentry repairs, replacing a section of existing sheathing and providing new wood shingle siding, and exterior painting

Update #4 ·

See attached SF30 for Amendment 0001, and other attached documents.
All amendments must be acknowledged.

Site visit is scheduled for 3 October, leaving USCG Station Point Allerton at 0900. Visit is weather, emergency operations and Government operations permitting. Arrive at the station by 0830. If you plan on attending, notify David Feit (at David.Feit@uscg.mil) of the number in your party.

Full size drawings provided.

Updated specification section provided.

Updated section M of the RFP provided.

Update #3 ·

SYNOPSIS
Solicitation: HSCGG1-14-R-PXL001
Project Serial Number (PSN): 5522706

The United States Coast Guard, Civil Engineering Unit - Providence, has a construction requirement for major exterior repairs on multiple structures at Boston Light on Little Brewster Island, MA.

This is an FY14 project, subject to the availability of funds.

This acquisition is a total small business set-aside. NAICS code is 236220 - Commercial and Institutional Building Construction, with small business size standard of $33.5M.

The Contracting Office is the USCG, CEU-Providence, located at 475 Kilvert Street, Suite 100, Warwick, RI 02886.

Expected solicitation release date: 24 September 2013

Tentative Site Visit: 2 October 2013

Expected proposal due date: 25 October 2013

Magnitude of Project: between $500,000 and $1,000,000

Base Scope of Work
The contractor shall provide all labor, materials, equipment, supervision, transportation and disposal necessary to effect the following and incidental related work.

Boathouse: The work includes removing existing wood shingle roofing, providing new wood shingle roofing, new copper flashing, exterior painting, and replacing a damaged wood sash with a new single glazed wood sash.

Oil House: The work includes painting and repairing the cupola, replacing eave and rake trim with new flat trim and molding, repointing the north façade, and exterior painting.

Dwelling (now Station Building): The work includes the following items:
a. Removing existing wood shingle roofing and providing new wood shingle roofing and new copper flashing

b. Provide new copper flashing at the chimney

c. Removing existing roofing and siding at dormer, and providing new wood shingle roofing, new siding, new flashing and new trim

d. Removing existing double hung, awning, and basement windows, and providing new impact-resistant aluminum clad wood windows with simulated divided lites, with new trim and associated patching

e. Removing existing fixed wood sash at the enclosed porch, and providing new fixed wood sash with divided lites. Trim and carpentry work is also included

f. Removing rusted post bases (10) at the ramp, and providing new stainless steel post bases, along with associated carpentry and concrete work

g. Repointing masonry at the basement walls, and repairing the foundation

h. Removing (2) existing doors and frames, and providing (2) new commercial grade flush fiberglass reinforced plastic doors, frames, with integrally colored door faces and frames and new stainless steel hardware

i. Exterior painting

j. At the porch, replacing 12 square feet of tongue and groove panels, and 16 linear feet of 2x3 framing

k. At the roof, replacing 220 square feet of3/4" thick wood board decking

Emergency Generator Building (Former Fog Signal Building): the work includes the following items:
a. Removing existing wood shingle roofing and providing new wood shingle roofing

b. Repointing and rebuilding existing brickwork, and providing new granite lintels

c. Repairing the foundation

d. Removing (3) existing double hung windows, and providing new impact-resistant aluminum clad wood windows with simulated divided lites, with new trim

e. At the gable, removing existing wood shingle siding and providing new wood shingle siding

f. Removing existing rake trim, wood gutters, and molding, and providing new rake trim, wood gutters, new moldings and new trim

g. Providing new copper downspouts with transition sections and elbows

h. Removing a pair of existing doors, and providing a pair of new commercial grade flush fiberglass reinforced plastic door with louvers, frame, with integrally colored door faces and frames and new stainless steel hardware

i. Exterior painting of masonry, (1) window and trim

j. At the roof, replacing 400 square feet of 3/4" thick wood board decking

Lighthouse: The work includes the following items:
a. Removing existing wood shingle roofing and providing new wood shingle roofing at the entry vestibule

b. Repointing at the tower

c. Painting and repairs at existing ironwork and metalwork, including the interior spiral stairway, ladders, doors, decks, windows, railings and the interior and exterior of the cupola.

d. Recoating the tower with Thoroseal plaster


Optional Bid Item Scope of Work
Optional Bid Item 1 includes the following items and incidental related work at the Cistern Building:
Removing existing wood shingle roofing, providing new wood shingle roofing, a new copper gutter and new copper downspouts, carpentry repairs, replacing a section of existing sheathing and providing new wood shingle siding, and exterior painting

Update #2 ·

SYNOPSIS
Solicitation: HSCGG1-14-R-PXL001
Project Serial Number (PSN): 5522706

The United States Coast Guard, Civil Engineering Unit - Providence, has a construction requirement for major exterior repairs on multiple structures at Boston Light on Little Brewster Island, MA.

This is an FY14 project, subject to the availability of funds.

This acquisition is a total small business set-aside.

The Contracting Office is the USCG, CEU-Providence, located at 475 Kilvert Street, Suite 100, Warwick, RI 02886.

Expected solicitation release date: 24 September 2013

Tentative Site Visit: 2 October 2013

Expected proposal due date: 25 October 2013

Magnitude of Project: between $500,000 and $1,000,000

Base Scope of Work
The contractor shall provide all labor, materials, equipment, supervision, transportation and disposal necessary to effect the following and incidental related work.

Boathouse: The work includes removing existing wood shingle roofing, providing new wood shingle roofing, new copper flashing, exterior painting, and replacing a damaged wood sash with a new single glazed wood sash.

Oil House: The work includes painting and repairing the cupola, replacing eave and rake trim with new flat trim and molding, repointing the north façade, and exterior painting.

Dwelling (now Station Building): The work includes the following items:
a. Removing existing wood shingle roofing and providing new wood shingle roofing and new copper flashing

b. Provide new copper flashing at the chimney

c. Removing existing roofing and siding at dormer, and providing new wood shingle roofing, new siding, new flashing and new trim

d. Removing existing double hung, awning, and basement windows, and providing new impact-resistant aluminum clad wood windows with simulated divided lites, with new trim and associated patching

e. Removing existing fixed wood sash at the enclosed porch, and providing new fixed wood sash with divided lites. Trim and carpentry work is also included

f. Removing rusted post bases (10) at the ramp, and providing new stainless steel post bases, along with associated carpentry and concrete work

g. Repointing masonry at the basement walls, and repairing the foundation

h. Removing (2) existing doors and frames, and providing (2) new commercial grade flush fiberglass reinforced plastic doors, frames, with integrally colored door faces and frames and new stainless steel hardware

i. Exterior painting

j. At the porch, replacing 12 square feet of tongue and groove panels, and 16 linear feet of 2x3 framing

k. At the roof, replacing 220 square feet of3/4" thick wood board decking

Emergency Generator Building (Former Fog Signal Building): the work includes the following items:
a. Removing existing wood shingle roofing and providing new wood shingle roofing

b. Repointing and rebuilding existing brickwork, and providing new granite lintels

c. Repairing the foundation

d. Removing (3) existing double hung windows, and providing new impact-resistant aluminum clad wood windows with simulated divided lites, with new trim

e. At the gable, removing existing wood shingle siding and providing new wood shingle siding

f. Removing existing rake trim, wood gutters, and molding, and providing new rake trim, wood gutters, new moldings and new trim

g. Providing new copper downspouts with transition sections and elbows

h. Removing a pair of existing doors, and providing a pair of new commercial grade flush fiberglass reinforced plastic door with louvers, frame, with integrally colored door faces and frames and new stainless steel hardware

i. Exterior painting of masonry, (1) window and trim

j. At the roof, replacing 400 square feet of 3/4" thick wood board decking

Lighthouse: The work includes the following items:
a. Removing existing wood shingle roofing and providing new wood shingle roofing at the entry vestibule

b. Repointing at the tower

c. Painting and repairs at existing ironwork and metalwork, including the interior spiral stairway, ladders, doors, decks, windows, railings and the interior and exterior of the cupola.

d. Recoating the tower with Thoroseal plaster


Optional Bid Item Scope of Work
Optional Bid Item 1 includes the following items and incidental related work at the Cistern Building:
Removing existing wood shingle roofing, providing new wood shingle roofing, a new copper gutter and new copper downspouts, carpentry repairs, replacing a section of existing sheathing and providing new wood shingle siding, and exterior painting

Update #1 ·

SYNOPSIS
Solicitation: HSCGG1-14-R-PXL001
Project Serial Number (PSN): 5522706

The United States Coast Guard, Civil Engineering Unit - Providence, has a construction requirement for major exterior repairs on multiple structures at Boston Light on Little Brewster Island, MA.

This is an FY14 project, subject to the availability of funds.

This acquisition is a total small business set-aside.

The Contracting Office is the USCG, CEU-Providence, located at 475 Kilvert Street, Suite 100, Warwick, RI 02886.

Expected solicitation release date: 20 September 2013

Expected proposal due date: 22 October 2013

Magnitude of Project: between $500,000 and $1,000,000

Base Scope of Work
The contractor shall provide all labor, materials, equipment, supervision, transportation and disposal necessary to effect the following and incidental related work.

Boathouse: The work includes removing existing wood shingle roofing, providing new wood shingle roofing, new copper flashing, exterior painting, and replacing a damaged wood sash with a new single glazed wood sash.

Oil House: The work includes painting and repairing the cupola, replacing eave and rake trim with new flat trim and molding, repointing the north façade, and exterior painting.

Dwelling (now Station Building): The work includes the following items:
a. Removing existing wood shingle roofing and providing new wood shingle roofing and new copper flashing

b. Provide new copper flashing at the chimney

c. Removing existing roofing and siding at dormer, and providing new wood shingle roofing, new siding, new flashing and new trim

d. Removing existing double hung, awning, and basement windows, and providing new impact-resistant aluminum clad wood windows with simulated divided lites, with new trim and associated patching

e. Removing existing fixed wood sash at the enclosed porch, and providing new fixed wood sash with divided lites. Trim and carpentry work is also included

f. Removing rusted post bases (10) at the ramp, and providing new stainless steel post bases, along with associated carpentry and concrete work

g. Repointing masonry at the basement walls, and repairing the foundation

h. Removing (2) existing doors and frames, and providing (2) new commercial grade flush fiberglass reinforced plastic doors, frames, with integrally colored door faces and frames and new stainless steel hardware

i. Exterior painting

j. At the porch, replacing 12 square feet of tongue and groove panels, and 16 linear feet of 2x3 framing

k. At the roof, replacing 220 square feet of3/4" thick wood board decking

Emergency Generator Building (Former Fog Signal Building): the work includes the following items:
a. Removing existing wood shingle roofing and providing new wood shingle roofing

b. Repointing and rebuilding existing brickwork, and providing new granite lintels

c. Repairing the foundation

d. Removing (3) existing double hung windows, and providing new impact-resistant aluminum clad wood windows with simulated divided lites, with new trim

e. At the gable, removing existing wood shingle siding and providing new wood shingle siding

f. Removing existing rake trim, wood gutters, and molding, and providing new rake trim, wood gutters, new moldings and new trim

g. Providing new copper downspouts with transition sections and elbows

h. Removing a pair of existing doors, and providing a pair of new commercial grade flush fiberglass reinforced plastic door with louvers, frame, with integrally colored door faces and frames and new stainless steel hardware

i. Exterior painting of masonry, (1) window and trim

j. At the roof, replacing 400 square feet of 3/4" thick wood board decking

Lighthouse: The work includes the following items:
a. Removing existing wood shingle roofing and providing new wood shingle roofing at the entry vestibule

b. Repointing at the tower

c. Painting and repairs at existing ironwork and metalwork, including the interior spiral stairway, ladders, doors, decks, windows, railings and the interior and exterior of the cupola.

d. Recoating the tower with Thoroseal plaster


Optional Bid Item Scope of Work
Optional Bid Item 1 includes the following items and incidental related work at the Cistern Building:
Removing existing wood shingle roofing, providing new wood shingle roofing, a new copper gutter and new copper downspouts, carpentry repairs, replacing a section of existing sheathing and providing new wood shingle siding, and exterior painting

Files

Show all 25

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors