Major Repairs on Multiple Structures at US Coast Guard Boston Light on Little Brewster Island
Solicitation number
HSCGG1-14-R-PXL001
Issued by

About this file

Amendment 0004 Q A - Repair Exteriors at Boston Light

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT 0004

QUESTIONS AND ANSWERS

Repair Exteriors on Multiple Structures at Light Station Boston

HSCGG1-14-R-PXL001

PSN: 5522706

29 October 2013

1. Will the ladder be the only means of egress to get personnel and material on to the island when work commences in April? If so, are we able to provide our own dock/gangway to load and offload equipment and personnel?

Response: Floating dock typically remains in place from mid-spring through mid-fall. When the dock is not in place, the ladder is the only means of access. A contractor can provide its own dock/gangway. Include your approach in your logistics plan.

2. Are our personnel able to use the onsite toilet facilities? Will we have to bring our own?

Response: Toilet facilities are NOT available. Contractor must provide.

3. Are we able to use cistern water for work operations? If so, will there be a daily usage limit?

Response: Cistern is not available for work operations.

4. It is my understanding that the motor on the crane structure will be removed in conjunction with the removal of the gangway and dock. Can we provide our own capacity compliant hoist motor and utilize that crane structure?

Response: Yes.

5. Will the light house light with the fresnel lens need to be fully operational during the duration of the work in the lighthouse?

Response: No.

6. As it pertains to alternate pricing- if the island remains open for tours, can the contractor assume that the NPS' floating dock and gangway will be available for use by the contractor?

Response: No. However, note that tours take place on Fridays, Saturdays and Sundays only.

The dock and gangway, if in place, will be available for use when it is not used for tours.

Painting and Coatings

7. Although not listed, we are proposing the use of Sponge Jet, Sponge Blast Media. Aluminum

Oxide 30Grit as well as their new Garnet Sponge Media. Is this Blast media acceptable?

Response: No, use what is in the specification.

8. What portion of the Lantern Glass Frame structure is Bronze and what portion is steel or

Iron?

Response: The frame is iron; astragals are bronze.

9. Is there any interior painting required at the Watch Deck Level?

Response: Yes, the entire lighthouse is included in the work.

10. Upon inspection, some wall surfaces in the keepers House showed evidence of water damage. Is there any wall painting required in the Keepers House?

Response: Yes, it is on the drawings.

11. Will items in the Light House Vestibule be removed during the work duration? Ie. Canon and items behind glass case

12. Do we need to bring out our own potable water for our clean up station/Decon Unit?

13. Please confirm we will be supplied with Holding Totes or containers to dispose of any gray water? Or will the contractor have to provide all gray water disposal methods?

Response: You will bring water to the site and dispose of it properly.

14. We would like confirmation that it is truly the intent of the spec writer to use Silicone Alkyd Enamel over Zinc Primer.

Response: Confirmed.

15. We would also like to know if the spec writer would entertain and allow the use of a complete Moisture Cured Urethane system? ie. Sherwin Williams Corothane I GalVaPac Zinc, Corothane I Ironox Intermediate, Corothane I Aliphatic Urethane Finish. (Both for Exterior and Interior Steel Surfaces.) This would allow for coating work during less favorable conditions without compromising system integrity.

Response: Proposal should reflect specifications without substitutions.

General Conditions

16. Can we provide a small camping trailer unit, or Tent on the island as a base for portions of the Light House Tower Scope of work? This is for frame and glass restoration.

17. How much electrical power is available on the island Response: You are advised to bring a generator.

18. Is the captured rain water available, filtered and useable as potable water?

Masonry

19. In applying the new thoroseal should we assume the use of a reinforcing fabric in the system?

20. What method or material is preferred for the repair of deep cracks on the light house tower?

Response: Use mortar.

Tower

21. Is it possible to relocate the emergency beacons to a higher point on the tower so they may be utilized during the restoration period when the light / lens is protected?

22. Are we allowed to take the Main light out of service for the period of restoration?

Response: Yes, with a schedule.

23. Is the contractor allowed to put an entire scaffolding around the light tower?