Main Roof Replacement
Closed Solicitation Posted
This opportunity was awarded. See its 4 award notices in the notice history.
- Solicitation number
- 47PF0021R0039
- Agency
- Region 5 Public Buildings Service, General Services Administration
- Responses due
- Set-aside
- Service-Disabled Veteran-Owned Small Business
Opportunity facts
- NAICS code
- 238160 Roofing Contractors
- Place of performance
- Cincinnati OH 45202, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The General Services Administration Region 5 is seeking a qualified general contractor to replace the existing 32,456 square foot lower main roof at the John W. Peck Federal Building in Cincinnati, Ohio. The solicitation requires removing the existing modified bitumen roof system and installing a new two-ply SBS modified bitumen roof over gypsum cover board and polyisocyanurate insulation, replacing all existing roof drains with new cast iron drains, and increasing the roof slope to 1/2 inch per foot to improve drainage. Offerors must have experience performing similar roof replacement projects and provide past performance references. Pricing proposals are due by March 15, 2021.
This opportunity is set aside for Service-Disabled Veteran-Owned Small Businesses with a NAICS code of 238160 and PSC code R499. The estimated award value is between $500,000 to $1,000,000 to be completed at the John W. Peck Federal Building located at 550 Main Street in Cincinnati, Ohio 45202 by December 24, 2021. Liquidated damages of $693.83 per day will be assessed for any delays beyond the 240-day period. Siplast is the recommended roof system manufacturer.
Notice text
2 versions
Update #2 · Latest ·
The General Services Administration (GSA), Region 05, is seeking a qualified General Contractor (GC) for the Main Roof Replacement Project at the John W. Peck Federal Building in Cincinnati, Ohio. SCOPE OF WORK but is not limited to: The purpose of this project is to replace the existing lower main roof of the John Weld Peck Federal Building in Cincinnati. The existing construction of this building is a concrete and steel frame with stone and glass cladding and was built in 1961. The existing main roof structure, as noted in the existing drawings supplied bythe GSA, is a 17-inch deep, concrete waffle deck bearing on concrete wrapped, steel columns. The existing roof system that is being replaced is 32,456 S.F and is approximately seven years old. Test cuts of the existing roof revealed a 2-ply modified bitumen roof over a gypsum cover board over polyisocyanurate insulation with felt facers. This top roof assembly had been installed over a 3-ply built up asphalt roof system over a base sheet mopped over the concrete roof deck. The modified bitumen cap sheet is showing signs of granule based deterioration. The edges of the cap sheet are curling and splitting and the field of the roof is ponding water in several locations.
It is the intention of the project to replace all the existing roof drains with new cast iron roof drains and match the roof system of the recently replace upper penthouse roof. This system is a 2-ply, cold applied SBS modified bitumen roof over a gypsum cover board over polyisocyanurate insulation over a temporary roof. In order to simplify maintenance and create a single source for warranty purposes, the recommended manufacturer of the main roof system is Siplast. In addition, the roof slope would be increased to ¼ inch per foot to improve roof drainage.
Attach Amendment 0001 and 0002, sign in sheet and agenda for preproposal
Update #1 ·
The General Services Administration (GSA), Region 05, is seeking a qualified General Contractor (GC) for the Main Roof Replacement Project at the John W. Peck Federal Building in Cincinnati, Ohio. SCOPE OF WORK but is not limited to: The purpose of this project is to replace the existing lower main roof of the John Weld Peck Federal Building in Cincinnati. The existing construction of this building is a concrete and steel frame with stone and glass cladding and was built in 1961. The existing main roof structure, as noted in the existing drawings supplied bythe GSA, is a 17-inch deep, concrete waffle deck bearing on concrete wrapped, steel columns. The existing roof system that is being replaced is 32,456 S.F and is approximately seven years old. Test cuts of the existing roof revealed a 2-ply modified bitumen roof over a gypsum cover board over polyisocyanurate insulation with felt facers. This top roof assembly had been installed over a 3-ply built up asphalt roof system over a base sheet mopped over the concrete roof deck. The modified bitumen cap sheet is showing signs of granule based deterioration. The edges of the cap sheet are curling and splitting and the field of the roof is ponding water in several locations.
It is the intention of the project to replace all the existing roof drains with new cast iron roof drains and match the roof system of the recently replace upper penthouse roof. This system is a 2-ply, cold applied SBS modified bitumen roof over a gypsum cover board over polyisocyanurate insulation over a temporary roof. In order to simplify maintenance and create a single source for warranty purposes, the recommended manufacturer of the main roof system is Siplast. In addition, the roof slope would be increased to ¼ inch per foot to improve roof drainage.
Attachments
| File | Type | Posted |
|---|---|---|
| Pre Proposal Meeting Agenda.pdf | ||
| Virtual Pre Proposal Sign In Sheet - Peck Main Roof - Sheet1.pdf | ||
| Solicitation Amendment 47PF0021R0039_0002.pdf | ||
| Solicitation Amendment 47PF0021R0039_0001.pdf | ||
| PECK MAIN ROOF SPECIFICATIONS.pdf | ||
| PECK MAIN ROOF DRAWINGS.pdf | ||
| RFP 47PF0021R0039.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Main Roof Replacement | Award Notice | |
| Tape Media Services | Solicitation | |
| Tape Media Services | Solicitation | |
| Tape Media Services | Solicitation | |
| Main Roof Replacement | Special Notice | |
| Main Roof Replacement | Special Notice | |
| Main Roof Replacement | Special Notice | |
| Main Roof Replacement | Solicitation | |
| Main Roof Replacement | Pre-Solicitation | |
| Tape Media Services | Pre-Solicitation | |
| Main Roof Replacement | Pre-Solicitation | |
| Z2DA--Proj. # 502-16-104 Replace HVAC System in Bldg. 2 | Award Notice | |
| Z2DA--Proj. # 502-16-104 Replace HVAC System in Bldg. 2-A0001 | Solicitation | |
| Z2DA--Proj. # 502-16-104 Replace HVAC System in Bldg. 2 | Solicitation | |
| Z2DA--Proj. # 502-16-104 Replace HVAC System in Bldg. 2 | Pre-Solicitation | |
| Cheyenne Substation Gate Replacement | Award Notice | |
| Cheyenne Substation Gate Replacement | Solicitation | |
| Lucky Peak Dam Guardrail Replacement and Paving Repair | Solicitation | |
| Lucky Peak Dam Guardrail Replacement and Paving Repair | Solicitation |
Show all 19
And 1 more award notice, with more on GovTribe.
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity