Machine Shop Equipment Preventative Maintenance and Repair Service
Closed Solicitation Posted
- Solicitation number
- W91ZLK-20-R-0017
- Agency
-
ACC Aberdeen Proving Ground
Army Contracting Command, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 811310 Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance
- Place of performance
- MD 21010 USA
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks proposals for preventative maintenance and repair services for machine shop equipment owned by the U.S. Army Chemical Biological Center Advanced Design and Manufacturing Branch. Offerors must demonstrate experience performing similar scope, size, and complexity projects. Proposals will be evaluated on technical approach, past performance on three relevant projects within the last three years, and price. Award will be made to the lowest priced technically acceptable offeror for a hybrid firm-fixed price and time & material contract. Proposals are due by July 30, 2020.
This requirement has been set aside for total small business. The primary NAICS code is 811310 for commercial and industrial machinery repair and maintenance. The period of performance is a three-year base period plus two one-year options to provide on-site preventative maintenance on a quarterly basis and remedial maintenance or repair within 24 hours as needed. The place of performance is the Advanced Design and Manufacturing facility at Aberdeen Proving Ground in Maryland. Pricing must be provided using the attached quote registry with firm fixed prices for preventative maintenance and time and material labor rates and hours for repair work.
Notice text
2 versions
Update #2 · Latest ·
This edit/change is to advise a changed made to the amount of equiment that requires a Preventative Maintenance (PM), versus On Call (OC).
Updated Shop Equipment List added under attachments section.
Please be advised, that this does not change due date of 30 July 2020, proposals in any way.
This is a combined synopsis/solicitation for a commercial items prepared in accordance with the format in FAR
Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes
the only solicitation. Quotes are being requested and a written solicitation will not be issued. Incorporated
provisions and clauses are those in effect through Federal Acquisition Circular FAC 2020-06 Effective 05 June
2020. The solicitation number for this requirement is W91ZLK-20-R-0017. This requirement is being solicited as a
Total Small Business Set Aside. The associated North American Industry Classification System (NAICS) Code is
811310 Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and
Maintenance. This procurement is being conducted using the Simplified Acquisition Procedures authorized in FAR
Part 13.5, Simplified Procedures for Certain Commercial Items. The Government contemplates an award of a
Hybrid Firm-Fixed Price (FFP) and Time & Material (T&M) contract and will be evaluated based on the Lowest
Priced Technically Acceptable (LPTA) offer.
INSTRUCTIONS AND INFORMATION TO OFFERORS
Description of Requirement:
The purpose of this contract is to provide US Army Chemical Biological Center (ECBC) Advanced
Design & Manufacturing (ADM) Branch with a preventive maintenance and repair service to the Government owned
Shop equipment machinery. Period of Performance is a base and two option years. Place of performance
will be at the ADM facility (Edgewood) Aberdeen Proving Ground, MD.
For more specific information regarding this requirement, please refer to the Performance Work Statement(PWS)
attached.
Proposals shall be submitted in two (2) separate volumes:
Volume I: Technical Proposal
Volume II: Pricing Proposal
The provision at FAR 52.212-2 - Evaluation -Commercial Items, applies to this acquisition. The contract will be
awarded to the Lowest Priced Technically Acceptable (LPTA) offeror. The technical evaluation will be a
determination based on information furnished by the vendor in the submitted proposal. The Government is not
responsible for locating or securing any information which is not identified in the offer. The Government reserves
the right to make an award without discussions.
VOLUME CONTENT REQUIREMENTS:
Executive Summary (Volume I):
The Executive Summary shall include a brief summary of the offeror's capability and approach to accomplish the
requirements of this contract. Include a statement specifying agreement with all terms, conditions, and provisions
included in the RFQ or any exceptions. Any exceptions taken to the attachments, exhibits, enclosures, or other
RFQ terms, conditions, or documents must be fully explained, however, any such exceptions may be grounds for
the Contracting Officer to reject the proposal from further consideration in the source selection process before
initial evaluation.
FACTOR 1: Technical Proposal (Volume I)
Technical Capabilities Factor: As a minimum, Offerors shall address the following in their proposal:
Offerors shall provide a discussion to describe how they intend to perform the requirements of the PWS which
demonstrates a complete understanding of the PWS requirements. In addition, offerors shall provide evidence that
they can meet the minimum requirements of the PWS Offerors shall provide resumes that satisfies the
requirement for Key Personnel (one Senior Electronic Technician (Class III) and three Electronic Technician
(Class III) ) located in the PWS.
FACTOR 2: Past Performance (Volume I):
The proposal must demonstrate satisfactory past performance and contractual completion of relevant projects.
Relevant projects are recent projects that are similar to the solicited project in scope, size and/or complexity.
Scope relevancy is defined as those projects that demonstrate past performance.
As a minimum Offeror shall address the following:
Offerors and major subcontractors shall submit three (3) recent and relevant projects. Recent projects are
considered to be efforts in performance or awarded during the past three (3) years prior to this solicitation. Data
used shall not extend past three (3) years prior to issue date but may include data generated during the past three
years without regard to contract award date.. The past performance references shall not be for work prior to 2017.
Offerors with no past performance shall so state.
The Offeror submission of past performance shall contain the following:
a. Section I - Offeror Past Performance
1.Contractor/Subcontractor place of performance, CAGE Code and DUNS number
2.Government contracting activity, address, telephone and FAX numbers
3.POCs name, telephone and fax numbers
4.Government's technical representative/COR telephone and fax numbers
5.Government contract administration activity and the ACO's name, telephone and fax numbers
6.Contract Number
7.Contract Type
8.Awarded price/cost
9.Final or projected final price/cost
10.Original delivery schedule
11.Final or projected final delivery schedule
12.Narrative - Offeror shall provide a specific narrative explanation of each contract listed describing the objectives
achieved and detailing how the effort is similar to the requirements of this solicitation. For any contracts that did
not/do not meet original cost schedule or technical performance requirements, provide a brief explanation of the
reason(s) for the shortcomings and any corrective actions taken to avoid recurrence. The Offeror shall list each
time the delivery schedule was revised and provide an explanation of why the revision was necessary. The Offeror
shall also provide a copy of any cure notices or show because notices received on each contract listed and a
description of any corrective action taken. The Offeror shall indicate if any of the contracts listed were terminated
and the type and reasons for the termination. The Offeror shall also specify to what extent subcontractors were
involved in gaining related experience, and their level of involvement with respect to the scope of work, objectives
achieved, and personnel resources utilized, and how previous contracts relate to this effort.
b.Section 2 Subcontracts- Offerors shall provide an outline of how the effort required by the solicitation will be
assigned for performance within the contractor's corporate entity and among the proposed subcontractors.
Offerors shall provide the above-required information for any proposed subcontractor who will perform a significant
portion of the effort. A significant portion is defined as performing 10% or more of the total effort. If not applicable,
the Offeror shall so state.
c.Section 3 New Corporate Entities- New corporate entities may submit data on prior contracts involving its
officers and employees. The Offeror shall discuss in detail the role performed by such persons in the prior
contracts cited. If not applicable, the Offeror shall so state.
FACTOR 3: Price Proposal (Volume II)
Information requested below for inclusion in the Price Proposal is not intended to be restrictive or all-inclusive.
Offeror's cost/price proposals will be evaluated based on the applicable criteria in FAR 15.404-1 based on
competition and other factors. Offerors are encouraged to submit any other price or financial information that may
be helpful in the understanding and evaluation of the Price Proposal; however, superfluous or elaborate
documents are discouraged. Pricing information shall be addressed ONLY in the Price Proposal (Volume III) and
shall be separated from any technical information being provided.
To provide uniformity and consistency a Quote Registry is attached. Please use this form to provide your price
proposal. Include Company name, POC to include: Name, title, email address.
It must be signed.
Partial quotes will not be evaluated.
The Government intends to make award to the Offeror whose proposal is TECHNICALLY ACCEPTABLE with the
LOWEST evaluated price (LPTA).
The Price Volume shall clearly identify the proposed firm fixed price unit prices for CLINs 0001, 1001, 2001 and
time & material labor rates for CLINs 0002, 1002, 2002.
The Government has provided the hours which all offerors shall utilize to compute the total prices for the T&M
CLINs as specified on the Quote Registry.
Assumptions used in determining the proposed CLIN amounts must be clearly stated in the Offeror's proposal.
All submissions shall be made in U.S. dollars.
EVALUATION & BASIS FOR AWARD
Basis for Award:
The Government intends to award one Hybrid Firm-Fixed Price (FFP) and Time & Material (T&M) contract to the
Lowest Priced, Technically Acceptable (LPTA) proposal, in accordance with FAR 15.101-2. To receive
consideration for award, a rating of "Acceptable" must be achieved for both Factors 1 and 2, Technical and Past
Performance.
Rejection of Offers: In accordance with FAR 52.212-1 (g) The Government may reject any or all offers if such
action is in the public interest; accept other than the lowest offer; and waive informalities and minor irregularities in
offers received. Examples include, but are not limited to, the following:
a.Offers that provide only a statement indicating its capability to comply with the RFP terms without support and
elaboration as specified in volume instructions stated in this combined synopsis/solicitation; or
b.Offers that reflect an inherent lack of technical competence or a failure to comprehend the complexity and risks
required to perform the requirements. This may include submission of a proposal which is abnormally high or low
in Price (unbalanced pricing) or unattainable in terms of technical or schedule commitments: or
c.Offers that do not meet all the stated material requirements of this combined synopsis/solicitation; or
d.Offers that propose exceptions to the attachments, exhibits, enclosures, or other combined synopsis/solicitation
terms and conditions.
Evaluation and Source Selection Process
Selection: Selection of the successful Offeror shall be made following an assessment of each proposal, based on
the response to the requirements of this solicitation. Proposals will be evaluated as specified in Proposal
Evaluation Section below.
Evaluation: The evaluation of proposals submitted in response to this combined synopsis/solicitation shall be
conducted in accordance with a LPTA competition.
Award without Discussions: In accordance with FAR 52.212-l (g), the Government intends to evaluate proposals
and award a contract without discussions with Offerors (except clarifications as described in FAR 15.306(a)).
Therefore, the Offeror's initial proposal shall contain the Offeror's best terms from a price and technical standpoint.
The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be
necessary. If the Contracting Officer determines that the number of proposals that would otherwise be in the
competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer
may limit the number of proposals in the competitive range to the greatest number that will permit an efficient
competition among the most highly rated proposals.
Determination of Responsibility: In accordance with FAR 9.103, contracts will be placed only with Contractors that
the Contracting Officer determines to be responsible. Prospective offerors, in order to qualify as sources for this
acquisition must be able to demonstrate that they meet standards of responsibility set forth in FAR 9.1 04. No
award can be made to an Offeror who has been determined non-responsible by the Contracting Officer.
PROPOSAL EVALUATION
Evaluation Factors: The Technical volume of the proposal will be evaluated against the requirements described in
the Performance Work Statement (PWS) contained in this solicitation. The Technical Volume will be determined to
be "Acceptable" or "Unacceptable", using the following ratings:
Technical Acceptable/Unacceptable Ratings
Rating Description
Acceptable--Proposal clearly meets the minimum requirements of the solicitation.
Unacceptable--Proposal does not clearly meet the minimum requirements of the solicitation.
Technical Proposal (Volume I)
FACTOR I: Technical Factor: The Government will evaluate the offeror's technical proposal based on the technical
factors stated above under Factor 1 Instructions, also see the PWS for further details..
FACTOR 2: Past Performance Factor:
Past Performance rating will be an Offeror's probability of meeting the requirements. Past Performance uses two
aspects: relevancy and recency. The assessment is based on the Offeror's record of relevant and recent past
performance information that pertains to the products and/or services outlined in the solicitation requirements.
Recency is described as contractual efforts undertaken within three years prior to this solicitation. Relevance
pertains to whether the Offeror's present/past performance is relevant or not relevant to the effort.
The second aspect of past performance will be determining how well the contractor performance on the contracts.
This evaluation does not establish, create, or change the existing record of performance rather the past
performance evaluation gathers information from customers on how well the Offeror performed on those past
contracts.
Each Offeror's proposal will receive an acceptable, or unacceptable rating. The Government may use data
provided in the Offeror's proposal and data will be obtained from other sources including, but not limited to, Past
Performance Information Retrieval System and interviews with other Government officials.
Past Performance Evaluation Ratings
Acceptable: Based on the Offeror's performance record the Government has a reasonable expectation that the
Offeror will successfully perform the required effort, or the Offeror's performance record is unknown. (See note
below.)
Unacceptable: Based on the Offeror's performance record, the Government has no reasonable expectation that
the Offeror will be able to successfully perform the required effort.
Note: In the case of an Offeror without a record of relevant Past Performance or for whom information on past
performance is not available or so sparse that no meaningful past performance rating can be reasonably
assigned, the Offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305 (a) (2)
(IV). Therefore, the Offeror shall be determined to have unknown past performance. In the context of
acceptability/unacceptability, "unknown'' shall be considered "acceptable."
FACTOR 3: Price Factor (Volume II):
The Government will evaluate the price proposal for award purposes by adding the Total Cost (base plus 2 option
years) of Preventive Maintenance and Repair sections of the Quote Registry by using price analysis techniques
described in FAR 15.404-1(b) based on competition and other factors. Accordingly, the analytical techniques and
procedures described in FAR 15.404-1 may be used singly or in combination with others, as determined by the
Contracting Officer, to ensure the costs are fair and reasonable. Any significant inconsistency, if unexplained, may
raise a fundamental issue of the Offeror's understanding of the nature and scope of the work required and may be
grounds for rejection of the proposal as inadequate.
Partial quotes will not be evaluated by the Government.
SUBMISSION PROCEDURES:
ALL PROPOSALS SHALL BE SUBMITTED VIA EMAIL WITH THE SUBJECT LINE:
W91ZLK-20-R-0017 PROPOSAL FROM (INSERT COMPANY NAME)
The offeror shall include a Company name, Point of contact, Company CAGE code, DUNS number and TIN.
All questions regarding this solicitation must be submitted to the Contracting Officer Gregory Faulcon and the
Contracting Officer Sherry Compton via email no later than 1:00 p.m. Eastern Time, July 15, 2020 to
gregory.faulcon.civ@mail or sherry.l.compton.civ@mail.mil.
Responses to this solicitation must be signed, dated, and received no later than 10:00 a.m. Eastern Time July 30, 2020. Responses must be sent by email directly to the Contracting Officer Gregory Faulcon and the Contracting Officer Sherry Compton to gregory.faulcon.civ@mail.mil or sherry.l.compton.civ@mail.mil.
NO TELEPHONE INQUIRIES WILL BE HONORED.
All proposals from responsible sources will be fully considered. Contractors who are not registered in the System
for Award Management (SAM) database prior to award will not be considered. Contractors may register with SAM
online for free at www.sam.gov.
Offerors shall include a completed copy of the provision at FAR 52.212-3, Offeror Representations and
Certifications- Commercial Items, with its offer.
FAR 52.252-1 - Solicitation Provisions Incorporated by Reference.
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if
they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is
cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with
its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by
paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a
solicitation provision may be accessed electronically at the following address: http://farsite.hill.af.mil
The following clauses and provisions are incorporated by reference:
FAR 52.203-6, Restrictions on Subcontractor Sales to the Government, Alternate I
FAR 52.203-13, Contractor Code of Business Ethics and Conduct
FAR 52.204-7 System for Award Management
FAR 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards OCT 2015
FAR 52.209-2 Prohibition on Contracting with Inverted Domestic Corporations-Rep NOV 2015
FAR 52.209-6 -- Protecting the Governments Interest When Subcontracting with Contractors Debarred,
Suspended, or Proposed for Debarment.
FAR 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (July 2013) (41 U.S.C.
2313).
FAR 52.209-10 - Prohibition on Contracting With Inverted Domestic Corporations.
FAR 52.212-1 Instructions to Offerors -- Commercial Items.
FAR 52.212-2, Evaluation- Commercial Items
FAR 52.212-3, Offeror Representations and Certifications - Commercial Items
FAR 52.212-4 Contract Terms and Conditions--Commercial Items
FAR 52.212-5, Contract Terms and Conditions Required to Implement Statutes or Executive Orders- Commercial
Items (Deviation 2013-O0019)
FAR 52.217-5, Evaluation of Options
FAR 52.217-8, Option to Extend Services
FAR 52.217-9, Option to Extend the Term of the Contract
FAR 52.219-6, Notice of Total Small Business Set-Aside
FAR 52.219-8, Utilization of Small Business Concerns
FAR 52.219-14, Limitations on Subcontracting
FAR 52.219-28, Post-Award Small Business Program Representation
FAR 52.222-3, Convict Labor
FAR 52.222-17 Nondisplacement of Qualified Workers
FAR 52.222-19, Child Labor- Cooperation with Authorities and Remedies
FAR 52.222-21, Prohibition of Segregated Facilities
FAR 52.222-26, Equal Opportunity
FAR 52.222-35, Equal Opportunity for Veterans
FAR 52.222-36, Affirmative Action for Workers with Disabilities
FAR 52.222-37, Employment Reports on Veterans
FAR 52.222-40, Notification of Employee Rights under the National Labor Relations Act
FAR 52.222-41 Service Contract Act of 1965
FAR 52.222-42 Statement of Equivalent Rates for Federal Hires
FAR 52.222-43, Fair Standards Act and Service Contract Act - Price Adjustment (Multiple Year and Option
Contracts)
FAR 52.222-50 Combating Trafficking in Persons
FAR 52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving
FAR 52.225-13, Restrictions on Certain Foreign Purchases
FAR 52.225-25, Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to
Iran-Representation and Certifications
FAR 52.232-33 Payment by Electronic Funds Transfer-- System for Award Management.
FAR 52.232-39, Unenforceability of Unauthorized Obligations
FAR 52.233-1 Disputes.
FAR 52.233-3, Protest After Award
FAR 52.233-4, Applicable Law for Breach of Contract Claim
FAR 52.237-1, Site Visit
FAR 52.237-2, Protection of Government Buildings, Equipment, and Vegetation
FAR 52.239-1, Privacy or Security Safeguards
FAR 52.243-3 -- Changes -Time-and-Materials or Labor-Hours.
FAR 52.243-1, Changes- Fixed Price, Alternate I
FAR 52.247-34 F.O.B. Destination
FAR 52.249-8, Default (Fixed-Price Supply and Service)
DFARS 252.201-7000 Contracting Officer's Representative
DFARS 252.203-7000 Requirements Relating to Compensation of Former DoD Officials.
DFARS 252.203-7002 Requirement to Inform Employees of Whistleblower Rights.
DFARS 252.204-7003 Control of Government Personnel Work Product.
DFARS 252.204-7012, Safeguarding of Unclassified Controlled Technical Information.
DFARS 252.204-7015, Disclosure of Information to Litigation Support Contractors.
DFARS 252-211-7003, Item Identification and Valuation
DFARS 252-215-7007, Notice of Intent to Re-solicit
DFARS 252.223-7008, Prohibition of Hexavalent Chromium
DFARS 252.225-7012, Preference for Certain Domestic Commodities
DFARS 252.225-7048, Export-Controlled Items
DFARS 252.226-7001, Utilization of Indian Organizations and Indian-Owned
Economic Enterprises, and Native Hawaiian Small Business Concerns.
DFARS 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports.
DFARS 252.232-7006, Wide Area Workflow Payment Instructions.
DFARS 252.232-7010 Levies on Contract Payments.
DFARS 252.237-7010, Prohibition on Interrogation of Detainees by Contractor Personnel.
DFARS 252.239-7002, Access
DFARS 252.243-7001 Pricing of Contract Modifications
DFARS 252.243-7002, Requests for Equitable Adjustment
DFARS 252.244-7000 Subcontracts for Commercial Items JUN 2013
DFARS 252.247-7023, Transportation of Supplies by Sea
EXEMPTION CERTIFICATE FROM MARYLAND RETAIL SALES AND USE TAX (OCT 2012) ACC-APG
5152.229-4900 Exemption Certificate No. 30005004 covers exemption from Maryland Retail Sales and Use Tax.
AMC-LEVEL PROTEST PROGRAM (AUG 2012) ACC-APG 5152.233-4900 If you have complaints about this
procurement, it is preferable that you first attempt to resolve those concerns with the responsible Contracting
Officer. However, you can also protest to Headquarters, AMC. The HQ, AMC-Level Protest Program is intended to
encourage interested parties to seek resolution of their concerns within AMC as an Alternative Dispute Resolution
forum, rather than filing a protest with the General Accounting Office (GAO) or other external forum. Contract
award or performance is suspended during the protest to the same extent, and within the same time periods, as if
filed at the GAO. The AMC protest decision goal is to resolve protests within 20 working days from filing. To be
timely, protests must be filed within the periods specified in FAR 33.103. Send protests (other than protests to the
Contracting Officer) to:
Headquarters U.S. Army Materiel Command
Office of Command Counsel-Deputy Command Counsel 4400 Martin Road
Rm: A6SE040.001
Redstone Arsenal, AL 35898-5000
Phone: (256) 450-8165
Fax: (256) 450-8840
E-mail: amcprotests@conus.army.mil
The AMC-Level Protest Procedures are accessible via the Internet at:
www.amc.army.mil/amc/commandcounsel.html. If Internet access is not available, contact the Contracting Officer
or HQ, AMC, to obtain the AMC Level Protest Procedures.
The AMC-Level Protest Procedures are accessible via the Internet at:
www.amc.army.mil/amc/commandcounsel.html. If internet access is not available, contact the Contracting Officer
or HQ, AMC, to obtain the AMC Level Protest Procedures.
Update #1 ·
This is a combined synopsis/solicitation for a commercial items prepared in accordance with the format in FAR
Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes
the only solicitation. Quotes are being requested and a written solicitation will not be issued. Incorporated
provisions and clauses are those in effect through Federal Acquisition Circular FAC 2020-06 Effective 05 June
2020. The solicitation number for this requirement is W91ZLK-20-R-0017. This requirement is being solicited as a
Total Small Business Set Aside. The associated North American Industry Classification System (NAICS) Code is
811310 Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and
Maintenance. This procurement is being conducted using the Simplified Acquisition Procedures authorized in FAR
Part 13.5, Simplified Procedures for Certain Commercial Items. The Government contemplates an award of a
Hybrid Firm-Fixed Price (FFP) and Time & Material (T&M) contract and will be evaluated based on the Lowest
Priced Technically Acceptable (LPTA) offer.
INSTRUCTIONS AND INFORMATION TO OFFERORS
Description of Requirement:
The purpose of this contract is to provide US Army Chemical Biological Center (ECBC) Advanced
Design & Manufacturing (ADM) Branch with a preventive maintenance and repair service to the Government owned
Shop equipment machinery. Period of Performance is a base and two option years. Place of performance
will be at the ADM facility (Edgewood) Aberdeen Proving Ground, MD.
For more specific information regarding this requirement, please refer to the Performance Work Statement(PWS)
attached.
Proposals shall be submitted in two (2) separate volumes:
Volume I: Technical Proposal
Volume II: Pricing Proposal
The provision at FAR 52.212-2 - Evaluation -Commercial Items, applies to this acquisition. The contract will be
awarded to the Lowest Priced Technically Acceptable (LPTA) offeror. The technical evaluation will be a
determination based on information furnished by the vendor in the submitted proposal. The Government is not
responsible for locating or securing any information which is not identified in the offer. The Government reserves
the right to make an award without discussions.
VOLUME CONTENT REQUIREMENTS:
Executive Summary (Volume I):
The Executive Summary shall include a brief summary of the offeror's capability and approach to accomplish the
requirements of this contract. Include a statement specifying agreement with all terms, conditions, and provisions
included in the RFQ or any exceptions. Any exceptions taken to the attachments, exhibits, enclosures, or other
RFQ terms, conditions, or documents must be fully explained, however, any such exceptions may be grounds for
the Contracting Officer to reject the proposal from further consideration in the source selection process before
initial evaluation.
FACTOR 1: Technical Proposal (Volume I)
Technical Capabilities Factor: As a minimum, Offerors shall address the following in their proposal:
Offerors shall provide a discussion to describe how they intend to perform the requirements of the PWS which
demonstrates a complete understanding of the PWS requirements. In addition, offerors shall provide evidence that
they can meet the minimum requirements of the PWS Offerors shall provide resumes that satisfies the
requirement for Key Personnel (one Senior Electronic Technician (Class III) and three Electronic Technician
(Class III) ) located in the PWS.
FACTOR 2: Past Performance (Volume I):
The proposal must demonstrate satisfactory past performance and contractual completion of relevant projects.
Relevant projects are recent projects that are similar to the solicited project in scope, size and/or complexity.
Scope relevancy is defined as those projects that demonstrate past performance.
As a minimum Offeror shall address the following:
Offerors and major subcontractors shall submit three (3) recent and relevant projects. Recent projects are
considered to be efforts in performance or awarded during the past three (3) years prior to this solicitation. Data
used shall not extend past three (3) years prior to issue date but may include data generated during the past three
years without regard to contract award date.. The past performance references shall not be for work prior to 2017.
Offerors with no past performance shall so state.
The Offeror submission of past performance shall contain the following:
a. Section I - Offeror Past Performance
1.Contractor/Subcontractor place of performance, CAGE Code and DUNS number
2.Government contracting activity, address, telephone and FAX numbers
3.POCs name, telephone and fax numbers
4.Government's technical representative/COR telephone and fax numbers
5.Government contract administration activity and the ACO's name, telephone and fax numbers
6.Contract Number
7.Contract Type
8.Awarded price/cost
9.Final or projected final price/cost
10.Original delivery schedule
11.Final or projected final delivery schedule
12.Narrative - Offeror shall provide a specific narrative explanation of each contract listed describing the objectives
achieved and detailing how the effort is similar to the requirements of this solicitation. For any contracts that did
not/do not meet original cost schedule or technical performance requirements, provide a brief explanation of the
reason(s) for the shortcomings and any corrective actions taken to avoid recurrence. The Offeror shall list each
time the delivery schedule was revised and provide an explanation of why the revision was necessary. The Offeror
shall also provide a copy of any cure notices or show because notices received on each contract listed and a
description of any corrective action taken. The Offeror shall indicate if any of the contracts listed were terminated
and the type and reasons for the termination. The Offeror shall also specify to what extent subcontractors were
involved in gaining related experience, and their level of involvement with respect to the scope of work, objectives
achieved, and personnel resources utilized, and how previous contracts relate to this effort.
b.Section 2 Subcontracts- Offerors shall provide an outline of how the effort required by the solicitation will be
assigned for performance within the contractor's corporate entity and among the proposed subcontractors.
Offerors shall provide the above-required information for any proposed subcontractor who will perform a significant
portion of the effort. A significant portion is defined as performing 10% or more of the total effort. If not applicable,
the Offeror shall so state.
c.Section 3 New Corporate Entities- New corporate entities may submit data on prior contracts involving its
officers and employees. The Offeror shall discuss in detail the role performed by such persons in the prior
contracts cited. If not applicable, the Offeror shall so state.
FACTOR 3: Price Proposal (Volume II)
Information requested below for inclusion in the Price Proposal is not intended to be restrictive or all-inclusive.
Offeror's cost/price proposals will be evaluated based on the applicable criteria in FAR 15.404-1 based on
competition and other factors. Offerors are encouraged to submit any other price or financial information that may
be helpful in the understanding and evaluation of the Price Proposal; however, superfluous or elaborate
documents are discouraged. Pricing information shall be addressed ONLY in the Price Proposal (Volume III) and
shall be separated from any technical information being provided.
To provide uniformity and consistency a Quote Registry is attached. Please use this form to provide your price
proposal. Include Company name, POC to include: Name, title, email address.
It must be signed.
Partial quotes will not be evaluated.
The Government intends to make award to the Offeror whose proposal is TECHNICALLY ACCEPTABLE with the
LOWEST evaluated price (LPTA).
The Price Volume shall clearly identify the proposed firm fixed price unit prices for CLINs 0001, 1001, 2001 and
time & material labor rates for CLINs 0002, 1002, 2002.
The Government has provided the hours which all offerors shall utilize to compute the total prices for the T&M
CLINs as specified on the Quote Registry.
Assumptions used in determining the proposed CLIN amounts must be clearly stated in the Offeror's proposal.
All submissions shall be made in U.S. dollars.
EVALUATION & BASIS FOR AWARD
Basis for Award:
The Government intends to award one Hybrid Firm-Fixed Price (FFP) and Time & Material (T&M) contract to the
Lowest Priced, Technically Acceptable (LPTA) proposal, in accordance with FAR 15.101-2. To receive
consideration for award, a rating of "Acceptable" must be achieved for both Factors 1 and 2, Technical and Past
Performance.
Rejection of Offers: In accordance with FAR 52.212-1 (g) The Government may reject any or all offers if such
action is in the public interest; accept other than the lowest offer; and waive informalities and minor irregularities in
offers received. Examples include, but are not limited to, the following:
a.Offers that provide only a statement indicating its capability to comply with the RFP terms without support and
elaboration as specified in volume instructions stated in this combined synopsis/solicitation; or
b.Offers that reflect an inherent lack of technical competence or a failure to comprehend the complexity and risks
required to perform the requirements. This may include submission of a proposal which is abnormally high or low
in Price (unbalanced pricing) or unattainable in terms of technical or schedule commitments: or
c.Offers that do not meet all the stated material requirements of this combined synopsis/solicitation; or
d.Offers that propose exceptions to the attachments, exhibits, enclosures, or other combined synopsis/solicitation
terms and conditions.
Evaluation and Source Selection Process
Selection: Selection of the successful Offeror shall be made following an assessment of each proposal, based on
the response to the requirements of this solicitation. Proposals will be evaluated as specified in Proposal
Evaluation Section below.
Evaluation: The evaluation of proposals submitted in response to this combined synopsis/solicitation shall be
conducted in accordance with a LPTA competition.
Award without Discussions: In accordance with FAR 52.212-l (g), the Government intends to evaluate proposals
and award a contract without discussions with Offerors (except clarifications as described in FAR 15.306(a)).
Therefore, the Offeror's initial proposal shall contain the Offeror's best terms from a price and technical standpoint.
The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be
necessary. If the Contracting Officer determines that the number of proposals that would otherwise be in the
competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer
may limit the number of proposals in the competitive range to the greatest number that will permit an efficient
competition among the most highly rated proposals.
Determination of Responsibility: In accordance with FAR 9.103, contracts will be placed only with Contractors that
the Contracting Officer determines to be responsible. Prospective offerors, in order to qualify as sources for this
acquisition must be able to demonstrate that they meet standards of responsibility set forth in FAR 9.1 04. No
award can be made to an Offeror who has been determined non-responsible by the Contracting Officer.
PROPOSAL EVALUATION
Evaluation Factors: The Technical volume of the proposal will be evaluated against the requirements described in
the Performance Work Statement (PWS) contained in this solicitation. The Technical Volume will be determined to
be "Acceptable" or "Unacceptable", using the following ratings:
Technical Acceptable/Unacceptable Ratings
Rating Description
Acceptable--Proposal clearly meets the minimum requirements of the solicitation.
Unacceptable--Proposal does not clearly meet the minimum requirements of the solicitation.
Technical Proposal (Volume I)
FACTOR I: Technical Factor: The Government will evaluate the offeror's technical proposal based on the technical
factors stated above under Factor 1 Instructions, also see the PWS for further details..
FACTOR 2: Past Performance Factor:
Past Performance rating will be an Offeror's probability of meeting the requirements. Past Performance uses two
aspects: relevancy and recency. The assessment is based on the Offeror's record of relevant and recent past
performance information that pertains to the products and/or services outlined in the solicitation requirements.
Recency is described as contractual efforts undertaken within three years prior to this solicitation. Relevance
pertains to whether the Offeror's present/past performance is relevant or not relevant to the effort.
The second aspect of past performance will be determining how well the contractor performance on the contracts.
This evaluation does not establish, create, or change the existing record of performance rather the past
performance evaluation gathers information from customers on how well the Offeror performed on those past
contracts.
Each Offeror's proposal will receive an acceptable, or unacceptable rating. The Government may use data
provided in the Offeror's proposal and data will be obtained from other sources including, but not limited to, Past
Performance Information Retrieval System and interviews with other Government officials.
Past Performance Evaluation Ratings
Acceptable: Based on the Offeror's performance record the Government has a reasonable expectation that the
Offeror will successfully perform the required effort, or the Offeror's performance record is unknown. (See note
below.)
Unacceptable: Based on the Offeror's performance record, the Government has no reasonable expectation that
the Offeror will be able to successfully perform the required effort.
Note: In the case of an Offeror without a record of relevant Past Performance or for whom information on past
performance is not available or so sparse that no meaningful past performance rating can be reasonably
assigned, the Offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305 (a) (2)
(IV). Therefore, the Offeror shall be determined to have unknown past performance. In the context of
acceptability/unacceptability, "unknown'' shall be considered "acceptable."
FACTOR 3: Price Factor (Volume II):
The Government will evaluate the price proposal for award purposes by adding the Total Cost (base plus 2 option
years) of Preventive Maintenance and Repair sections of the Quote Registry by using price analysis techniques
described in FAR 15.404-1(b) based on competition and other factors. Accordingly, the analytical techniques and
procedures described in FAR 15.404-1 may be used singly or in combination with others, as determined by the
Contracting Officer, to ensure the costs are fair and reasonable. Any significant inconsistency, if unexplained, may
raise a fundamental issue of the Offeror's understanding of the nature and scope of the work required and may be
grounds for rejection of the proposal as inadequate.
Partial quotes will not be evaluated by the Government.
SUBMISSION PROCEDURES:
ALL PROPOSALS SHALL BE SUBMITTED VIA EMAIL WITH THE SUBJECT LINE:
W91ZLK-20-R-0017 PROPOSAL FROM (INSERT COMPANY NAME)
The offeror shall include a Company name, Point of contact, Company CAGE code, DUNS number and TIN.
All questions regarding this solicitation must be submitted to the Contracting Officer Gregory Faulcon and the
Contracting Officer Sherry Compton via email no later than 1:00 p.m. Eastern Time, July 15, 2020 to
gregory.faulcon.civ@mail or sherry.l.compton.civ@mail.mil.
Responses to this solicitation must be signed, dated, and received no later than 10:00 a.m. Eastern Time July 30, 2020. Responses must be sent by email directly to the Contracting Officer Gregory Faulcon and the Contracting Officer Sherry Compton to gregory.faulcon.civ@mail.mil or sherry.l.compton.civ@mail.mil.
NO TELEPHONE INQUIRIES WILL BE HONORED.
All proposals from responsible sources will be fully considered. Contractors who are not registered in the System
for Award Management (SAM) database prior to award will not be considered. Contractors may register with SAM
online for free at www.sam.gov.
Offerors shall include a completed copy of the provision at FAR 52.212-3, Offeror Representations and
Certifications- Commercial Items, with its offer.
FAR 52.252-1 - Solicitation Provisions Incorporated by Reference.
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if
they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is
cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with
its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by
paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a
solicitation provision may be accessed electronically at the following address: http://farsite.hill.af.mil
The following clauses and provisions are incorporated by reference:
FAR 52.203-6, Restrictions on Subcontractor Sales to the Government, Alternate I
FAR 52.203-13, Contractor Code of Business Ethics and Conduct
FAR 52.204-7 System for Award Management
FAR 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards OCT 2015
FAR 52.209-2 Prohibition on Contracting with Inverted Domestic Corporations-Rep NOV 2015
FAR 52.209-6 -- Protecting the Governments Interest When Subcontracting with Contractors Debarred,
Suspended, or Proposed for Debarment.
FAR 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (July 2013) (41 U.S.C.
2313).
FAR 52.209-10 - Prohibition on Contracting With Inverted Domestic Corporations.
FAR 52.212-1 Instructions to Offerors -- Commercial Items.
FAR 52.212-2, Evaluation- Commercial Items
FAR 52.212-3, Offeror Representations and Certifications - Commercial Items
FAR 52.212-4 Contract Terms and Conditions--Commercial Items
FAR 52.212-5, Contract Terms and Conditions Required to Implement Statutes or Executive Orders- Commercial
Items (Deviation 2013-O0019)
FAR 52.217-5, Evaluation of Options
FAR 52.217-8, Option to Extend Services
FAR 52.217-9, Option to Extend the Term of the Contract
FAR 52.219-6, Notice of Total Small Business Set-Aside
FAR 52.219-8, Utilization of Small Business Concerns
FAR 52.219-14, Limitations on Subcontracting
FAR 52.219-28, Post-Award Small Business Program Representation
FAR 52.222-3, Convict Labor
FAR 52.222-17 Nondisplacement of Qualified Workers
FAR 52.222-19, Child Labor- Cooperation with Authorities and Remedies
FAR 52.222-21, Prohibition of Segregated Facilities
FAR 52.222-26, Equal Opportunity
FAR 52.222-35, Equal Opportunity for Veterans
FAR 52.222-36, Affirmative Action for Workers with Disabilities
FAR 52.222-37, Employment Reports on Veterans
FAR 52.222-40, Notification of Employee Rights under the National Labor Relations Act
FAR 52.222-41 Service Contract Act of 1965
FAR 52.222-42 Statement of Equivalent Rates for Federal Hires
FAR 52.222-43, Fair Standards Act and Service Contract Act - Price Adjustment (Multiple Year and Option
Contracts)
FAR 52.222-50 Combating Trafficking in Persons
FAR 52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving
FAR 52.225-13, Restrictions on Certain Foreign Purchases
FAR 52.225-25, Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to
Iran-Representation and Certifications
FAR 52.232-33 Payment by Electronic Funds Transfer-- System for Award Management.
FAR 52.232-39, Unenforceability of Unauthorized Obligations
FAR 52.233-1 Disputes.
FAR 52.233-3, Protest After Award
FAR 52.233-4, Applicable Law for Breach of Contract Claim
FAR 52.237-1, Site Visit
FAR 52.237-2, Protection of Government Buildings, Equipment, and Vegetation
FAR 52.239-1, Privacy or Security Safeguards
FAR 52.243-3 -- Changes -Time-and-Materials or Labor-Hours.
FAR 52.243-1, Changes- Fixed Price, Alternate I
FAR 52.247-34 F.O.B. Destination
FAR 52.249-8, Default (Fixed-Price Supply and Service)
DFARS 252.201-7000 Contracting Officer's Representative
DFARS 252.203-7000 Requirements Relating to Compensation of Former DoD Officials.
DFARS 252.203-7002 Requirement to Inform Employees of Whistleblower Rights.
DFARS 252.204-7003 Control of Government Personnel Work Product.
DFARS 252.204-7012, Safeguarding of Unclassified Controlled Technical Information.
DFARS 252.204-7015, Disclosure of Information to Litigation Support Contractors.
DFARS 252-211-7003, Item Identification and Valuation
DFARS 252-215-7007, Notice of Intent to Re-solicit
DFARS 252.223-7008, Prohibition of Hexavalent Chromium
DFARS 252.225-7012, Preference for Certain Domestic Commodities
DFARS 252.225-7048, Export-Controlled Items
DFARS 252.226-7001, Utilization of Indian Organizations and Indian-Owned
Economic Enterprises, and Native Hawaiian Small Business Concerns.
DFARS 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports.
DFARS 252.232-7006, Wide Area Workflow Payment Instructions.
DFARS 252.232-7010 Levies on Contract Payments.
DFARS 252.237-7010, Prohibition on Interrogation of Detainees by Contractor Personnel.
DFARS 252.239-7002, Access
DFARS 252.243-7001 Pricing of Contract Modifications
DFARS 252.243-7002, Requests for Equitable Adjustment
DFARS 252.244-7000 Subcontracts for Commercial Items JUN 2013
DFARS 252.247-7023, Transportation of Supplies by Sea
EXEMPTION CERTIFICATE FROM MARYLAND RETAIL SALES AND USE TAX (OCT 2012) ACC-APG
5152.229-4900 Exemption Certificate No. 30005004 covers exemption from Maryland Retail Sales and Use Tax.
AMC-LEVEL PROTEST PROGRAM (AUG 2012) ACC-APG 5152.233-4900 If you have complaints about this
procurement, it is preferable that you first attempt to resolve those concerns with the responsible Contracting
Officer. However, you can also protest to Headquarters, AMC. The HQ, AMC-Level Protest Program is intended to
encourage interested parties to seek resolution of their concerns within AMC as an Alternative Dispute Resolution
forum, rather than filing a protest with the General Accounting Office (GAO) or other external forum. Contract
award or performance is suspended during the protest to the same extent, and within the same time periods, as if
filed at the GAO. The AMC protest decision goal is to resolve protests within 20 working days from filing. To be
timely, protests must be filed within the periods specified in FAR 33.103. Send protests (other than protests to the
Contracting Officer) to:
Headquarters U.S. Army Materiel Command
Office of Command Counsel-Deputy Command Counsel 4400 Martin Road
Rm: A6SE040.001
Redstone Arsenal, AL 35898-5000
Phone: (256) 450-8165
Fax: (256) 450-8840
E-mail: amcprotests@conus.army.mil
The AMC-Level Protest Procedures are accessible via the Internet at:
www.amc.army.mil/amc/commandcounsel.html. If Internet access is not available, contact the Contracting Officer
or HQ, AMC, to obtain the AMC Level Protest Procedures.
The AMC-Level Protest Procedures are accessible via the Internet at:
www.amc.army.mil/amc/commandcounsel.html. If internet access is not available, contact the Contracting Officer
or HQ, AMC, to obtain the AMC Level Protest Procedures.
Files
| File | Type | Posted |
|---|---|---|
| A03 Revised 14 July 2020 Shop Equipment List for PM and Repair.docx | DOCX document | |
| B01 Solicitation Question and Answers 14 July 2020.pdf | ||
| A03 Shop Equipment List for PM and Repair.pdf | ||
| A03 PWS ADM Equipment Miantenance.docx | DOCX document |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Preventative Maintenance and Repairs | ACC Warren | No set-aside | |
| Preventative Maintenance and Repair of Heavy Equipment for the Fort Mifflin Project Office | ENDIST Philadelphia | No set-aside | |
| Laser Cutting Machine Preventive Maintenance | ACC Redstone | No set-aside | |
| Shop equipment,metal | Land and Maritime | No set-aside | |
| Gear shaper repair | ACC Rock Island | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity