Lower wicomico river maintenance dredging

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W912DR22B0018
Agency
ENDIST Baltimore US Army Corps of Engineers, Department of Defense
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Y1PZ Construction Of Other Non-Building Facilities
Place of performance
Deal Island, Maryland 21821, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks hydraulic dredging services for the Lower Wicomico River in Wicomico County, Maryland. The U.S. Army Corps of Engineers, Baltimore District requires the dredging of approximately 120,000 cubic yards of predominantly silty material from the lower half of the river to a depth of 14 feet. Dredged material must be pumped via an 8 to 14 mile pipeline and placed at a wildlife management area site using a diffuser to restore approximately 70 acres of wetlands. Contractors must stack straw bales and construct 20 tidal ditch plugs of varying sizes. Vegetation planting is required over two growing seasons. The final response deadline is August 30, 2022.

This requirement has a 100% small business set-aside designation under NAICS code 237990, Heavy and Civil Engineering Construction, with a size standard of $39.5 million. The placement of dredged material will occur over approximately 70 acres in the Deal Island Historic District of Maryland. Two offers were received with a low bid of $13.5 million from Cottrell Contracting Corporation. Award is anticipated to the responsive, responsible bidder that offers the lowest price.

Notice text

6 versions

Update #6 · Latest ·

Amendment 0001 issued on July 20, 2022

Amendment 0002 issued on August 09, 2022

Amendment 0003 issued on August 22, 2022

Amendment 0004 issued on August 26, 2022

Abstract of Bids issued on August 30, 2022

Lower Wicomico River Maintenance Dredging at Wicomico County, MD

This proposed procurement is a Competitive Invitation for Bid (IFB); NAICS 237990 “Other Heavy and Civil Engineering Construction” with a size standard of $39,500,000.00.

Total 100% Small Business Set-aside.

This project is to include the hydraulic dredging the lower half of the Wicomico River to its authorized depth of 14 feet (plus one foot of allowable over depth). Approximately 120,000 cubic yards of silty material, with small pockets of sandy material, are to be dredged. Placement of material via pipeline will be utilized. Pipeline distance will be, on average, 8 miles, with a maximum pumping distance of 14 miles. The pipeline will travel through the Wicomico River and over land (approximately 4 miles) to reach the placement site. The pipeline will be placed atop the existing berm at the WMA impoundment and a diffuser shall be used at multiple locations to place the material at a lower velocity into the placement site. The outflow of the pipeline shall be moved across the project placement areas to achieve the desired elevation. As such, careful attention to the prescribed elevation in placing the material is critical to the success of the project. Approximately 70 acres of land will be restored. Due to the location of the placement site being surrounded by water and the WMA impoundment, minimal land access is available with little to no access for heavy equipment from the land side of the project placement site. Wetland restoration is meant to increase migratory bird nesting habitat. To ensure the restoration goals are met the placement location shall also include placing straw bales as natural containment around the southern end of the placement site. The straw bales are to act as containment for dredged material placed for wetland restoration and increasing migratory bird nesting habitat. Approximately 11,000 strawbales will be used stacked two high with an additional single stacked row at the interior of the placement site to provide proper containment of the dredged material. Tidal ditch plugs shall be constructed in areas of high erosion or open water. Approximately 20 ditch plugs of varying size are to be constructed. After dredged material placement, vegetation will be planted to restore the wetland. Planting of vegetation will occur over the two growing seasons post dredged material placement. Vegetation will be Spartina patens and Distichlis spicata, and possibly a smaller amount of Panicum. Vegetation the first growing season may require aerial seeding, based on consolidation of the dredged material. Vegetation the first growing season shall also require the exterior edge only to be hand planted to provide stabilization, with interior planting occurring the second growing season once material has consolidated.

Update #5 ·

Amendment 0001 issued on July 20, 2022

Amendment 0002 issued on August 09, 2022

Amendment 0003 issued on August 22, 2022

Amendment 0004 issued on August 26, 2022

Lower Wicomico River Maintenance Dredging at Wicomico County, MD

This proposed procurement is a Competitive Invitation for Bid (IFB); NAICS 237990 “Other Heavy and Civil Engineering Construction” with a size standard of $39,500,000.00.

Total 100% Small Business Set-aside.

This project is to include the hydraulic dredging the lower half of the Wicomico River to its authorized depth of 14 feet (plus one foot of allowable over depth). Approximately 120,000 cubic yards of silty material, with small pockets of sandy material, are to be dredged. Placement of material via pipeline will be utilized. Pipeline distance will be, on average, 8 miles, with a maximum pumping distance of 14 miles. The pipeline will travel through the Wicomico River and over land (approximately 4 miles) to reach the placement site. The pipeline will be placed atop the existing berm at the WMA impoundment and a diffuser shall be used at multiple locations to place the material at a lower velocity into the placement site. The outflow of the pipeline shall be moved across the project placement areas to achieve the desired elevation. As such, careful attention to the prescribed elevation in placing the material is critical to the success of the project. Approximately 70 acres of land will be restored. Due to the location of the placement site being surrounded by water and the WMA impoundment, minimal land access is available with little to no access for heavy equipment from the land side of the project placement site. Wetland restoration is meant to increase migratory bird nesting habitat. To ensure the restoration goals are met the placement location shall also include placing straw bales as natural containment around the southern end of the placement site. The straw bales are to act as containment for dredged material placed for wetland restoration and increasing migratory bird nesting habitat. Approximately 11,000 strawbales will be used stacked two high with an additional single stacked row at the interior of the placement site to provide proper containment of the dredged material. Tidal ditch plugs shall be constructed in areas of high erosion or open water. Approximately 20 ditch plugs of varying size are to be constructed. After dredged material placement, vegetation will be planted to restore the wetland. Planting of vegetation will occur over the two growing seasons post dredged material placement. Vegetation will be Spartina patens and Distichlis spicata, and possibly a smaller amount of Panicum. Vegetation the first growing season may require aerial seeding, based on consolidation of the dredged material. Vegetation the first growing season shall also require the exterior edge only to be hand planted to provide stabilization, with interior planting occurring the second growing season once material has consolidated.

Update #4 ·

Amendment 0001 issued on July 20, 2022

Amendment 0002 issued on August 09, 2022

Amendment 0003 issued on August 22 2022

Lower Wicomico River Maintenance Dredging at Wicomico County, MD

This proposed procurement is a Competitive Invitation for Bid (IFB); NAICS 237990 “Other Heavy and Civil Engineering Construction” with a size standard of $39,500,000.00.

Total 100% Small Business Set-aside.

This project is to include the hydraulic dredging the lower half of the Wicomico River to its authorized depth of 14 feet (plus one foot of allowable over depth). Approximately 120,000 cubic yards of silty material, with small pockets of sandy material, are to be dredged. Placement of material via pipeline will be utilized. Pipeline distance will be, on average, 8 miles, with a maximum pumping distance of 14 miles. The pipeline will travel through the Wicomico River and over land (approximately 4 miles) to reach the placement site. The pipeline will be placed atop the existing berm at the WMA impoundment and a diffuser shall be used at multiple locations to place the material at a lower velocity into the placement site. The outflow of the pipeline shall be moved across the project placement areas to achieve the desired elevation. As such, careful attention to the prescribed elevation in placing the material is critical to the success of the project. Approximately 70 acres of land will be restored. Due to the location of the placement site being surrounded by water and the WMA impoundment, minimal land access is available with little to no access for heavy equipment from the land side of the project placement site. Wetland restoration is meant to increase migratory bird nesting habitat. To ensure the restoration goals are met the placement location shall also include placing straw bales as natural containment around the southern end of the placement site. The straw bales are to act as containment for dredged material placed for wetland restoration and increasing migratory bird nesting habitat. Approximately 11,000 strawbales will be used stacked two high with an additional single stacked row at the interior of the placement site to provide proper containment of the dredged material. Tidal ditch plugs shall be constructed in areas of high erosion or open water. Approximately 20 ditch plugs of varying size are to be constructed. After dredged material placement, vegetation will be planted to restore the wetland. Planting of vegetation will occur over the two growing seasons post dredged material placement. Vegetation will be Spartina patens and Distichlis spicata, and possibly a smaller amount of Panicum. Vegetation the first growing season may require aerial seeding, based on consolidation of the dredged material. Vegetation the first growing season shall also require the exterior edge only to be hand planted to provide stabilization, with interior planting occurring the second growing season once material has consolidated.

Update #3 ·

Amendment 0001 issued on July 20, 2022

Amendment 0002 issued on August 09, 2022

Lower Wicomico River Maintenance Dredging at Wicomico County, MD

This proposed procurement is a Competitive Invitation for Bid (IFB); NAICS 237990 “Other Heavy and Civil Engineering Construction” with a size standard of $39,500,000.00.

Total 100% Small Business Set-aside.

This project is to include the hydraulic dredging the lower half of the Wicomico River to its authorized depth of 14 feet (plus one foot of allowable over depth). Approximately 120,000 cubic yards of silty material, with small pockets of sandy material, are to be dredged. Placement of material via pipeline will be utilized. Pipeline distance will be, on average, 8 miles, with a maximum pumping distance of 14 miles. The pipeline will travel through the Wicomico River and over land (approximately 4 miles) to reach the placement site. The pipeline will be placed atop the existing berm at the WMA impoundment and a diffuser shall be used at multiple locations to place the material at a lower velocity into the placement site. The outflow of the pipeline shall be moved across the project placement areas to achieve the desired elevation. As such, careful attention to the prescribed elevation in placing the material is critical to the success of the project. Approximately 70 acres of land will be restored. Due to the location of the placement site being surrounded by water and the WMA impoundment, minimal land access is available with little to no access for heavy equipment from the land side of the project placement site. Wetland restoration is meant to increase migratory bird nesting habitat. To ensure the restoration goals are met the placement location shall also include placing straw bales as natural containment around the southern end of the placement site. The straw bales are to act as containment for dredged material placed for wetland restoration and increasing migratory bird nesting habitat. Approximately 11,000 strawbales will be used stacked two high with an additional single stacked row at the interior of the placement site to provide proper containment of the dredged material. Tidal ditch plugs shall be constructed in areas of high erosion or open water. Approximately 20 ditch plugs of varying size are to be constructed. After dredged material placement, vegetation will be planted to restore the wetland. Planting of vegetation will occur over the two growing seasons post dredged material placement. Vegetation will be Spartina patens and Distichlis spicata, and possibly a smaller amount of Panicum. Vegetation the first growing season may require aerial seeding, based on consolidation of the dredged material. Vegetation the first growing season shall also require the exterior edge only to be hand planted to provide stabilization, with interior planting occurring the second growing season once material has consolidated.

Update #2 ·

Amendment 0001 issued on July 20, 2022

Lower Wicomico River Maintenance Dredging at Wicomico County, MD

This proposed procurement is a Competitive Invitation for Bid (IFB); NAICS 237990 “Other Heavy and Civil Engineering Construction” with a size standard of $39,500,000.00.

Total 100% Small Business Set-aside.

This project is to include the hydraulic dredging the lower half of the Wicomico River to its authorized depth of 14 feet (plus one foot of allowable over depth). Approximately 120,000 cubic yards of silty material, with small pockets of sandy material, are to be dredged. Placement of material via pipeline will be utilized. Pipeline distance will be, on average, 8 miles, with a maximum pumping distance of 14 miles. The pipeline will travel through the Wicomico River and over land (approximately 4 miles) to reach the placement site. The pipeline will be placed atop the existing berm at the WMA impoundment and a diffuser shall be used at multiple locations to place the material at a lower velocity into the placement site. The outflow of the pipeline shall be moved across the project placement areas to achieve the desired elevation. As such, careful attention to the prescribed elevation in placing the material is critical to the success of the project. Approximately 70 acres of land will be restored. Due to the location of the placement site being surrounded by water and the WMA impoundment, minimal land access is available with little to no access for heavy equipment from the land side of the project placement site. Wetland restoration is meant to increase migratory bird nesting habitat. To ensure the restoration goals are met the placement location shall also include placing straw bales as natural containment around the southern end of the placement site. The straw bales are to act as containment for dredged material placed for wetland restoration and increasing migratory bird nesting habitat. Approximately 11,000 strawbales will be used stacked two high with an additional single stacked row at the interior of the placement site to provide proper containment of the dredged material. Tidal ditch plugs shall be constructed in areas of high erosion or open water. Approximately 20 ditch plugs of varying size are to be constructed. After dredged material placement, vegetation will be planted to restore the wetland. Planting of vegetation will occur over the two growing seasons post dredged material placement. Vegetation will be Spartina patens and Distichlis spicata, and possibly a smaller amount of Panicum. Vegetation the first growing season may require aerial seeding, based on consolidation of the dredged material. Vegetation the first growing season shall also require the exterior edge only to be hand planted to provide stabilization, with interior planting occurring the second growing season once material has consolidated.

Update #1 ·

Lower Wicomico River Maintenance Dredging at Wicomico County, MD

This proposed procurement is a Competitive Invitation for Bid (IFB); NAICS 237990 “Other Heavy and Civil Engineering Construction” with a size standard of $39,500,000.00.

Total 100% Small Business Set-aside.

This project is to include the hydraulic dredging the lower half of the Wicomico River to its authorized depth of 14 feet (plus one foot of allowable over depth). Approximately 120,000 cubic yards of silty material, with small pockets of sandy material, are to be dredged. Placement of material via pipeline will be utilized. Pipeline distance will be, on average, 8 miles, with a maximum pumping distance of 14 miles. The pipeline will travel through the Wicomico River and over land (approximately 4 miles) to reach the placement site. The pipeline will be placed atop the existing berm at the WMA impoundment and a diffuser shall be used at multiple locations to place the material at a lower velocity into the placement site. The outflow of the pipeline shall be moved across the project placement areas to achieve the desired elevation. As such, careful attention to the prescribed elevation in placing the material is critical to the success of the project. Approximately 70 acres of land will be restored. Due to the location of the placement site being surrounded by water and the WMA impoundment, minimal land access is available with little to no access for heavy equipment from the land side of the project placement site. Wetland restoration is meant to increase migratory bird nesting habitat. To ensure the restoration goals are met the placement location shall also include placing straw bales as natural containment around the southern end of the placement site. The straw bales are to act as containment for dredged material placed for wetland restoration and increasing migratory bird nesting habitat. Approximately 11,000 strawbales will be used stacked two high with an additional single stacked row at the interior of the placement site to provide proper containment of the dredged material. Tidal ditch plugs shall be constructed in areas of high erosion or open water. Approximately 20 ditch plugs of varying size are to be constructed. After dredged material placement, vegetation will be planted to restore the wetland. Planting of vegetation will occur over the two growing seasons post dredged material placement. Vegetation will be Spartina patens and Distichlis spicata, and possibly a smaller amount of Panicum. Vegetation the first growing season may require aerial seeding, based on consolidation of the dredged material. Vegetation the first growing season shall also require the exterior edge only to be hand planted to provide stabilization, with interior planting occurring the second growing season once material has consolidated.

Attachments

Show all 13

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Lower wicomico river maintenance dredging Award Award Notice
Lower wicomico river maintenance dredging This notice · Latest solicitation Solicitation
Lower wicomico river maintenance dredging Pre-Solicitation
Lower wicomico river maintenance dredging Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity