Lime Creek Replacement Trail
Closed Solicitation Posted
- Solicitation number
- 1282B124Q0054
- Agency
-
Forest Service
Department of Agriculture
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Boise, Idaho 83709, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of Agriculture Forest Service is seeking construction services to replace the Lime Creek Trail bridge located in the Boise National Forest in Idaho. The work includes mobilization, soil erosion and pollution control, removal and disposal of the existing bridge, installation of a new prefabricated steel trail bridge with a concrete substructure, and related site work. Quotes are due by August 16, 2024 and must include a technical proposal, past performance information, and a price schedule. The Government will evaluate quotes based on technical capability, past performance, and price, and will select the offer providing the best value.
This opportunity is set aside for small businesses, with a HUBZone price evaluation preference. The project magnitude is estimated at $100,000 - $250,000. All work must be completed by September 30, 2025, with instream work required to be accomplished between August 30 and September 15, 2024, or July 1 and September 15, 2025. The place of performance is Boise, ID 83709.
Notice text
The Government intends to issue one FFP award for construction services, Lime Creek Replacement Trail, IAW with SOW, Specs & all attachments. The work shall consist of but is not limited to mobilization, soil erosion & pollution control, removal and disposal of an existing unserviceable trail bridge, rip rap armoring of new bridge abutments using local in-situ rock, design, purchase, transport, and installation of a prefabricated steel trail bridge, design, purchase, transport, and installation of new substructure (pre-cast concrete grade beams), construction of approach embankments, and general cleanup.
Files
| File | Type | Posted |
|---|---|---|
| A9_Amd_0002_Atch_2_Ques_Ans_Lime_Creek.xlsx | XLSX spreadsheet | |
| A9_Amd_0002_Lime_Creek_signed.pdf | ||
| A9_Amd_0002_Atch_1_Lime Creek_ Supplemental_Specs_Rev_2.pdf | ||
| A9_Amendment_0001_Lime_Creek_signed.pdf | ||
| A10_RFQ_signed.pdf |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| ID FLAP KOOTEN 8450(1), Yellowstone Trail Road, Segment 1 | Federal Highway Administration | No set-aside | |
| Cisco Branch Ontonagon River Bridge Replacement | Forest Service | Total Small Business | |
| GAOA Mesa Falls VC Roof Repairs in Caribou-Targhee National Forest, Idaho | Forest Service | Total Small Business | |
| YELL 338223 - Bridge Preservation | National Office | No set-aside | |
| GAOA Powell Duplex Improvements, Nez Perce - Clearwater National Forest | Forest Service | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity