A9_Amendment_0001_Lime_Creek_signed.pdf
PDF 232 KB Posted
- Attached to
- Lime Creek Replacement Trail
- Solicitation number
- 1282B124Q0054
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is an amendment to a Request for Quotation (RFQ) for the Lime Creek Replacement Trail project. The amendment modifies the project location performance section, specifying that all instream work must be accomplished between August 30 and September 15, 2024, or July 1 and September 15, 2025, to protect aquatic species and hydrologic function. The original RFQ, Solicitation Number 1282B124Q0054, is for construction services to include mobilization, soil erosion and pollution control, removal and disposal of an existing trail bridge, rip rap armoring of new bridge abutments, design and installation of a prefabricated steel trail bridge and new substructure, construction of approach embankments, and general cleanup. The contracting agency is the U.S. Department of Agriculture Forest Service.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A9_Amd_0002_Lime_Creek_signed.pdf | ||
| A9_Amd_0002_Atch_1_Lime Creek_ Supplemental_Specs_Rev_2.pdf | ||
| A9_Amd_0002_Atch_2_Ques_Ans_Lime_Creek.xlsx | XLSX spreadsheet | |
| A10_RFQ_signed.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Agriculture
United States Department of
Forest EAZ Acquisition Management 160-A Zillicoa St
Service Acquisition Management Asheville NC 28802
USDA Forest Service
PPS- SPOC
Intermountain Branch
1400 Independence Avenue, Mailstop 1138
Washington, DC 20250
Caring for the Land and Serving People Printed on Recycled Paper
July 22, 2024
USDA Forest Service
Crystal Amos, Contracting Officer
SPOC-Intermountain
1400 Independence Avenue, Mailstop 1138
Washington, DC 20250
Subject: Request for Quotation, 1282B124Q0054, 0001, Lime Creek Replacement Trail
The purpose of this amendment is to modify the information below:
C.2 PROJECT LOCATION
PERFORMANCE: Specific time windows for work have been established to protect aquatic species and hydrologic function. All instream work shall be accomplished between
30 August and September 15th, 2024, or July 01, 2025, and September 15, 2025.
Sincerely, CRYSTAL AMOS
Contracting Officer
| 2024-07-22T15:19:23-0500 | |
| CRYSTAL AMOS |
File details come from the government source that posted it. Updated .