Lighting Inverters Repair and Reprogramming

Closed Solicitation Posted

Solicitation number
FA251726Q0006
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Colorado Springs, Colorado 80914, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Air Force Space Command, specifically the 21st Civil Engineering Squadron, is soliciting services to troubleshoot and repair three nonfunctioning Harsh Environment Uninterruptible (HEU) power supply lighting inverters manufactured by Crucial Power Products (Model HU3.0R2500N1-VA), reprogram all seven existing HEU inverters to operate in both normal and emergency modes, and replace all eight 12 VDC batteries (Part Number 7050-436) in each of the seven inverters. The work must be executed by licensed electricians and must follow all current applicable codes, regulations, and standards, with all procedures and materials requiring approval from the 21st Civil Engineering Squadron Requirements and Optimization office prior to work commencement. The solicitation is for commercial products and services under FAR Part 12 streamlined acquisition procedures, with a firm fixed-price contract structure and a 180-calendar-day performance period from the lead time event to completion. The government will evaluate proposals based on their ability to meet the technical requirements and complete the work in a professional and expeditious manner, with acceptance and inspection occurring at both the contractor's location and the Cheyenne Mountain Air Force Station facility. The original deadline of March 12, 2026, has been extended to March 31, 2026, to accommodate a mandatory site visit scheduled for March 18, 2026, at 9:00 AM Mountain Time, for which vendors must RSVP by March 16, 2026.

This opportunity is designated as a 100 percent small business set-aside under NAICS code 238210 with a size standard of $19,000,000, and no current incumbents or prior contractors are identified in the solicitation materials. No specific award value or budget range is disclosed in the available documents, though a previous source-sought posting in FY24 identified at least five capable vendors interested in fulfilling this requirement. The project scope includes three repairs, reprogramming of seven units, and battery replacement across all seven inverters, with work to be performed between 7:00 a.m. and 4:00 p.m., Monday through Friday, excluding federal holidays, unless otherwise approved in writing. The place of performance is Cheyenne Mountain Space Force Station (Cheyenne Mountain AFB), Colorado, which is a restricted area requiring contractors to obtain proper base access authorization and submit a CMSFS Visitor Request at least 15 business days before work begins. Contractors will be required to follow Service Contract Act prevailing wage rates for the El Paso County, Colorado area and comply with Air Force Occupational Safety & Health standards, environmental regulations, and hazardous materials handling requirements.

Notice text

4 versions

Update #4 · Latest ·

AMENDMENT 03:  Amendment to address additional RFIs, and extend solicitation period. (Answers in Bold)

• Known failure conditions or symptoms for the three (3) non-functioning inverters

Nothing happens when the test button is pressed

• Any prior inspection reports, maintenance records, or diagnostic findings

None

• Date of last preventive maintenance or servicing performed on the units

March 2, 2026. Filters changed. Batteries tested. Test button pressed. Monthly

• Identification of known failed components (if any) such as batteries, control boards, or power modules

Units are functioning backwards, emergency lighting is always on

• Availability of any error codes, alarms, or system logs

Display shows:

          UPS STANDBY @ 3KVA

          INPUT OK @ CHRG OFF

          BATTERY LOW @ DC OK

ON BYPASS @ OUT BAD

• Confirmation whether any spare parts or replacement components are currently available onsite

None

• Any historical issues with similar units at the facility

None

• Is the Government open to vendors including clearly defined assumptions related to troubleshooting scope within their Firm-Fixed-Price proposal?

This would be acceptable
• Would the Government consider or accept a separate breakout (e.g., diagnostic vs. repair) for informational purposes, while still maintaining an overall Firm-Fixed-Price submission?

This would be acceptable

Update #3 ·

AMENDMENT 02:  Amendment to address RFIs, add a Site Visit and extend solicitation period.

RFI 1:  "To provide an accurate quote for the Crucial Power Products (Model HU3.0) repair and battery replacement project at Cheyenne Mountain, could you please provide the Serial Numbers for the seven units? This will allow us to confirm the exact firmware versions for the reprogramming and verify the specific replacement battery requested."

Answer:  Lighting Inverter serial numbers: HE0260A HE0260F HE0260E HE0260D HE0260C HE0260B HE0261

RFI 2:  "I am reaching out regarding the project Lighting Inverters Repair and Reprogramming - Active Opportunity (Notice ID FA251726Q0006). We would like to request information about the site visit for this opportunity. Could you please confirm if a site visit will be scheduled and provide the details on how interested vendors can attend?"

Answer:  Yes, we will have a Site Visit for this requirement. Please see below for all Site Visit information.

Site Visit: SITE VISIT ANNOUNCEMENT

a. A site visit for Solicitation FA251726Q0006 will be held on Wednesday March 18, 2026 at 09:00 AM Mountain Time.

b. All interested offerors must RSVP via email to 2d Lt Stephen Hayden, stephen.hayden.1@spaceforce.mil no later than Monday March 16, 2026 at 4:00 PM Mountain Time. No more than two (2) representatives per company may attend.

c. In the RSVP email, attendees must provide the following information for base access: Full Name, Date of Birth, and Driver's License Number and State of Issue. Also ensure that any vehicles driving on site have current registration and insurance information available.

d. Attendees will meet at the Cheyenne Mountain SFS Visitor Control Center for escort. Address:  1 Norad Rd, Colorado Springs, CO 80914

e. This will be the only site visit offered. Information discussed at the site visit is for informational purposes only. Any changes to the solicitation will be made only by formal amendment. Solicitation Close Date E

AMENDMENT 01: TO ADD CLAUSE FAR 52.212-2 EVALUATION COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

The 21st Civil Engineering Squadron (21 CES) has a new requirement for a one time service for the contractor to furnish necessary labor, tools, transportation, supplies, equipment, materials, and incidentals necessary to complete all work state in the Statement of Work (SOW). 
 
Project Description from SOW:
 
a) Troubleshoot and repair three existing nonfunctioning Harsh Environment Uninterruptible (HEU) power supply lighting inverters.
b) Reprogram all seven existing HEU power supply lighting inverters to operate in normal mode during normal operation and in emergency mode upon loss of power.
c) Replace all eight 12 VDC batteries in each of the seven existing HEU power supply lighting inverters.
 
Manufacturer:  Crucial Power Products
Model:  HU CABINET
Model Number:  HU3.0R2500N1-VA
Battery Part Number:  7050-436
 
The contractor shall follow all current, applicable codes, regulations, standards, and criteria. In addition, all work procedures and materials shall be approved by 21 CES Requirements and Optimization (R&O) prior to the start of work. The work within the SOW shall be executed by licensed electricians. The contractor shall coordinate and perform all operations in a manner that will result in a professionally and expeditiously completed project. 
 
This requirement is commercial as it is available to the general public or by non-governmental entities for purposes other than governmental purposes and can be acquired using the streamlined acquisition procedures in FAR Part 12. In FY24, a sources sought was posted to SAM.gov, revealing at least five vendors who are capable and interested in fulfilling this requirement. Within FY24, this requirement was canceled and is now being solicited as a one time service. SAM.gov will be the vehicle used to purchase the entirety of this requirement.
 
The Contractor shall obtain all necessary licenses and permits, complying with all federal, state, and municipal laws, codes and regulations applicable to the performance of the work needed. 
 
Should this requirement not be fulfilled, the emergency lights that are designed to come on during loss of power, will remain on at all times.  Having them operate as intended is imperative; furthermore, having the inverters repaired will save energy costs by not having an additional set of lights operating 24/7.
 
The Period of Performance (PoP) is 180 days from lead time event (receipt of any purchased materials needed to complete contracted work). This period encompasses all required activities, securing escorts, obtaining base access for personnel and vehicles, mobilization, all phases of project execution, site clean-up, and the submission of all closeout documentation.

Update #2 ·

AMENDMENT: TO ADD CLAUSE FAR 52.212-2 EVALUATION COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

The 21st Civil Engineering Squadron (21 CES) has a new requirement for a one time service for the contractor to furnish necessary labor, tools, transportation, supplies, equipment, materials, and incidentals necessary to complete all work state in the Statement of Work (SOW). 
 
Project Description from SOW:
 
a) Troubleshoot and repair three existing nonfunctioning Harsh Environment Uninterruptible (HEU) power supply lighting inverters.
b) Reprogram all seven existing HEU power supply lighting inverters to operate in normal mode during normal operation and in emergency mode upon loss of power.
c) Replace all eight 12 VDC batteries in each of the seven existing HEU power supply lighting inverters.
 
Manufacturer:  Crucial Power Products
Model:  HU CABINET
Model Number:  HU3.0R2500N1-VA
Battery Part Number:  7050-436
 
The contractor shall follow all current, applicable codes, regulations, standards, and criteria. In addition, all work procedures and materials shall be approved by 21 CES Requirements and Optimization (R&O) prior to the start of work. The work within the SOW shall be executed by licensed electricians. The contractor shall coordinate and perform all operations in a manner that will result in a professionally and expeditiously completed project. 
 
This requirement is commercial as it is available to the general public or by non-governmental entities for purposes other than governmental purposes and can be acquired using the streamlined acquisition procedures in FAR Part 12. In FY24, a sources sought was posted to SAM.gov, revealing at least five vendors who are capable and interested in fulfilling this requirement. Within FY24, this requirement was canceled and is now being solicited as a one time service. SAM.gov will be the vehicle used to purchase the entirety of this requirement.
 
The Contractor shall obtain all necessary licenses and permits, complying with all federal, state, and municipal laws, codes and regulations applicable to the performance of the work needed. 
 
Should this requirement not be fulfilled, the emergency lights that are designed to come on during loss of power, will remain on at all times.  Having them operate as intended is imperative; furthermore, having the inverters repaired will save energy costs by not having an additional set of lights operating 24/7.
 
The Period of Performance (PoP) is 180 days from lead time event (receipt of any purchased materials needed to complete contracted work). This period encompasses all required activities, securing escorts, obtaining base access for personnel and vehicles, mobilization, all phases of project execution, site clean-up, and the submission of all closeout documentation.

Update #1 ·

The 21st Civil Engineering Squadron (21 CES) has a new requirement for a one time service for the contractor to furnish necessary labor, tools, transportation, supplies, equipment, materials, and incidentals necessary to complete all work state in the Statement of Work (SOW). 
 
Project Description from SOW:
 
a) Troubleshoot and repair three existing nonfunctioning Harsh Environment Uninterruptible (HEU) power supply lighting inverters.
b) Reprogram all seven existing HEU power supply lighting inverters to operate in normal mode during normal operation and in emergency mode upon loss of power.
c) Replace all eight 12 VDC batteries in each of the seven existing HEU power supply lighting inverters.
 
Manufacturer:  Crucial Power Products
Model:  HU CABINET
Model Number:  HU3.0R2500N1-VA
Battery Part Number:  7050-436
 
The contractor shall follow all current, applicable codes, regulations, standards, and criteria. In addition, all work procedures and materials shall be approved by 21 CES Requirements and Optimization (R&O) prior to the start of work. The work within the SOW shall be executed by licensed electricians. The contractor shall coordinate and perform all operations in a manner that will result in a professionally and expeditiously completed project. 
 
This requirement is commercial as it is available to the general public or by non-governmental entities for purposes other than governmental purposes and can be acquired using the streamlined acquisition procedures in FAR Part 12. In FY24, a sources sought was posted to SAM.gov, revealing at least five vendors who are capable and interested in fulfilling this requirement. Within FY24, this requirement was canceled and is now being solicited as a one time service. SAM.gov will be the vehicle used to purchase the entirety of this requirement.
 
The Contractor shall obtain all necessary licenses and permits, complying with all federal, state, and municipal laws, codes and regulations applicable to the performance of the work needed. 
 
Should this requirement not be fulfilled, the emergency lights that are designed to come on during loss of power, will remain on at all times.  Having them operate as intended is imperative; furthermore, having the inverters repaired will save energy costs by not having an additional set of lights operating 24/7.
 
The Period of Performance (PoP) is 180 days from lead time event (receipt of any purchased materials needed to complete contracted work). This period encompasses all required activities, securing escorts, obtaining base access for personnel and vehicles, mobilization, all phases of project execution, site clean-up, and the submission of all closeout documentation.

Files

Similar open opportunities

Opportunity Agency Set-aside Responses due
Repair of the E-3/C-130H Power Supply Tinker AFB, Oklahoma 73145, United States · NAICS 336413 Air Force Sustainment Center No set-aside
FTG247 Replace UPS at IDT1, Fort Greely, Alaska Fort Greely, Alaska 99731, United States · NAICS 237130 ENDIST Alaska Total Small Business
6973GH-26-r-00177 - miniature UPS kits – SIR Oklahoma City, Oklahoma 73169, United States · NAICS 221122 Franchise Acquisition Servies No set-aside
10-Miler Audio/Visual Patrick AFB, Florida 32925, United States · NAICS 512110 Air Force Space Command Total Small Business
Power supply, unint NAICS 335931 Naval Supply Systems Command No set-aside