This is a Statement of Work (SOW) for repair and reprogramming of Harsh Environment Uninterruptible Power Supply (HEU) Lighting Inverters at Cheyenne Mountain Space Force Station, Colorado, prepared by the 21st Civil Engineer Squadron dated February 18, 2026.
The contractor must troubleshoot and repair three nonfunctioning HEU Lighting Inverters (Crucial Power Products Model HU3.0R2500N1-VA) and replace eight 12VDC batteries (Part Number 7050-436) in all seven existing inverters. All seven inverters must be reprogrammed to operate in normal mode during standard operation and automatically switch to emergency mode upon loss of main power. Work must be executed by licensed electricians and performed between 7:00 a.m. and 4:00 p.m., Monday through Friday, excluding federal holidays, unless otherwise approved in writing by Requirements and Optimization (R&O) or the contracting officer. The contractor is responsible for furnishing all necessary labor, tools, materials, supplies, and equipment to complete the work according to current applicable codes, regulations, standards, and Air Force Occupational Safety & Health (AFOSH) standards (29 CFR 1910 and 1926). All work procedures and materials require approval from 21 CES R&O prior to start.
The worksite is located in a restricted area requiring contractors to obtain proper authorization and submit a CMSFS Visitor Request no later than 15 business days before work begins. The contractor must coordinate with CMCC at shift start and end (719-474-3575/3558) and notify OMCS personnel before disconnecting control panels (719-474-2156/3000). Environmental and hazardous materials handling must comply with federal, state, and local laws; the contractor must maintain Safety Data Sheets and submit an AF Form 3952 to 21 CES at least 15 business days prior to work start. Final acceptance requires demonstration that the three repaired inverters power on with stable output per manufacturer specifications and that all seven reprogrammed inverters successfully transfer to battery backup when main power is simulated as lost. Deliverables include all operational and maintenance documentation, a detailed condition and maintenance report, and test results, all of which become U.S. Government property.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
FOR
Lighting Inverters Repair and Reprograming
February 18, 2026
PREPARED BY:
21st CIVIL ENGINEER SQUADRON
1 NORAD RD
CHEYENNE MOUNTAIN SPACE FORCE STATION, CO 80914
1. GENERAL
a) Repair three of seven of the Harsh Environment Uninterruptible Power
Supply (HEU) Lighting Inverters. Replace eight batteries in all seven HEUs. All seven HEUs are to be reprogrammed to operate in normal mode during normal operation, and in emergency mode upon loss of power at Cheyenne Mountain Space Force Station (CMSFS), Colorado.
b) The work to be performed shall consist of furnishing necessary labor, tools, transportation, supplies, equipment, materials, and incidentals necessary to complete all work stated in this Statement Of Work (SOW). The Contractor shall follow all current, applicable codes, regulations, standards, and criteria. In addition, all work procedures and materials shall be approved by the 21 Civil Engineering Squadron (21 CES) Requirements and Optimization (R&O) prior to the start of work. The work in this SOW shall be executed by licensed electricians.
The Contractor shall coordinate and perform all operations in a manner that will result in a professionally and expeditiously completed project.
1.1. PROJECT DESCRIPTION
a) Troubleshoot and repair three existing nonfunctioning harsh environment uninterruptible power supply lighting inverters.
b) Reprogram all seven existing harsh environment uninterruptible power supply lighting inverters to operate in normal mode during normal operation, and in emergency mode upon loss of power.
c) Replace all eight 12VDC batteries in each of the seven existing harsh environment uninterruptible power supply lighting inverters.
Manufacture: Crucial Power Products Model: HU CABINET Model Number: HU3.0R2500N1-VA Battery P/N: 7050-436
2. ENVIRONMENTAL AND HAZARDOUS MATERIAL HANDLING
2.1. The Contractor shall provide and maintain Safety Data Sheets (SDS) on all materials used in the performance of this contract. If any materials used in the performance of this contract are considered hazardous; the Contractor shall follow all local, state, and federal laws for proper management or transport of said hazardous waste. All potentially hazardous materials/toxics found or identified at CMSFS while executing this work will immediately be reported to R&O at 719- 474-2775 and The Environmental Section at 719-474-2217.
2.2. Ensure employees handle any hazardous materials according to federal, state, or local laws and emergency response requirements. If required, a license for employees handling of hazardous materials shall be the Contractor’s responsibility and at their expense. Report any instances of spills, leaks, and/or inadvertent release of hazardous materials to Cheyenne Mountain Control Center (CMCC) at 719-474-3575/3558 and The Environmental Section at 719- 474-2217 as soon as the event occurs.
2.3. The Government will provide the Contractor an AF Form 3952, Chemical/Hazardous Material Request Authorization, for all materials used on CMSFS. The Contractor shall have the form submitted back to 21 CES at least
15 business days prior to the start of work.
2.4. The Contractor shall contact 21 CES prior to generating any waste that is determined to be hazardous per the SDS. The Contractor is encouraged to contact R&O at 719-474-2775 if assistance is needed in making a waste determination.
3. SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK.
(a) The Contractor acknowledges that it has taken steps reasonably necessary to ascertain the nature and location of the work, and that it has investigated and satisfied itself as to the general and local conditions which can affect the work or its cost, including but not limited to (1) conditions bearing upon transportation, disposal, handling, and storage of materials; (2) the availability of labor, water, electric power, and roads; (3) uncertainties of weather, river stages, tides, or similar physical conditions at the site; (4) the conformation and conditions of the ground;
and (5) the character of equipment and facilities needed preliminary to and during work performance. The Contractor also acknowledges that it has satisfied itself as to the character, quality, and quantity of surface and subsurface materials or obstacles to be encountered insofar as this information is reasonably ascertainable from an inspection of the site, including all exploratory work done by the Government, as well as from the drawings and specifications made a part of this contract. Any failure of the Contractor to take the actions described and acknowledged in this paragraph will not relieve the Contractor from responsibility for estimating properly the difficulty and cost of successfully performing the work, or for proceeding to successfully perform the work without additional expense to the Government.
(b) The Government assumes no responsibility for any conclusions or interpretations made by the Contractor based on the information made available by the Government. Nor does the Government assume responsibility for any understanding reached or representation made concerning conditions which can affect the work by any of its officers or agents before the execution of this contract unless that understanding or representation is expressly stated in this contract.
4. WORK SCHEDULE
Working hours for the Contractor will normally be between the hours of 7:00 a.m.
and 4:00 p.m. excluding Saturdays, Sundays, and Federal Holidays. On rare occasions, circumstances may require work to be completed in other than the aforementioned time frames and must be approved by the Requirements and Optimization section (R&O) or the contracting officer in writing prior to the deviance.
5. WORK AREA ACCESS
5.1. This worksite is located inside a restricted area at CMSFS, and all contractors must have proper authorization. The Contractor’s company shall ensure contractors have been authorized to enter the restricted area and must provide their own escorts, if necessary. 21 CES can provide recommendations for approved escorts. Escorts may only supervise 10 visitors at any one time, and visitors must always remain within sight of the escort. Upon acceptance of this contract, the Contractor shall complete and submit a CMSFS Visitor Request to 21 CES. Visitor Request template to be provided after award. All Visitor Requests shall be submitted no later than 15 business days prior to the first day of work. The
Contractor shall coordinate Visitor Request processing with R&O at 719-474-2775.
Any contractor who fails to pass a background check will not be permitted to work on the installation.
5.2. The Contractor shall inform CMCC at the start and end of every shift at 719-474-
3575/3558.
5.3. The Contractor shall notify OMCS personnel prior to the disconnect of any control panel in the complex at 719-474-2156/3000
5.4. After award, if the Contractor requires a vehicle to be driven into the restricted area, a Vehicle Authorization Request (VAR) may be issued if deemed necessary.
All VAR requests shall be submitted no later than 15 business days prior to the vehicle needing to be driven into the restricted area. The Contractor shall coordinate VAR processing with the R&O Team at 719-474-2775.
5.5. If the Contractor requires a camera or computer in the restricted area upon award and deemed necessary, additional information will be required, a Laptop/Computer/Electronic request. All requests shall be submitted no later than 15 business days prior to the first day of work. The Contractor shall coordinate processing with the R&O Team at 719-474-2775.
6. SAFETY
All Contractor operations shall be conducted and performed in accordance with Department of Labor, OSHA requirements found in 29 CFR 1910 (1910.146 and 1910.147) and 29 CFR 1926, and Air Force Occupational Safety & Health (AFOSH) AFOSH standards including 91-205 and DAFMAN 91-203 AIR FORCE OCCUPATIONAL SAFETY, FIRE, AND HEALTH STANDARDS. The Contractor shall also ensure that all work is performed in accordance with project identified national standards, military manuals, instructions, pamphlets, standards, and handbooks.
7. PROTECTION OF GOVERNMENT PROPERTY
The Contractor shall use reasonable care to avoid damaging existing buildings, equipment, and vegetation on the Government installation. If the Contractor fails to use reasonable care and causes damage to any of this property, the Contractor shall replace or repair the damage at no expense to the Government. If the Contractor fails or refuses to make such repair or replacement, the Contractor shall be liable for the cost.
8. SITE MAINTENANCE AND CLEANUP
8.1. The Contractor shall protect the work area, and if necessary adjacent areas, from dust, dirt, or other materials. Work areas shall be maintained in a neat, clean, and safe condition and shall, at a minimum, be cleaned at the end of each shift. All passageways in/or adjacent to the site shall always remain free of project generated trash and debris.
8.2. For project to be accepted the Contractor shall collect all trash, debris, refuse, garbage, etc., that is generated from this project and place it in appropriate containers with lids or approved covers on a periodic basis or as directed. The aforementioned materials shall be hauled from the site by appropriate means on a daily basis, unless otherwise approved. Disposal shall be outside the limits of government property. Disposal shall be by approved methods and shall conform to all local, state, and federal guidelines, criteria, and regulations. Upon completion of the work, the Contractor shall leave the work site and storage area(s) in a clean, neat, and workmanlike condition satisfactory to 21 CES.
9. DELIVERABLES
9.1. At the completion of the contract, the Contractor shall provide all applicable documents for operations and maintenance of the new system. Additionally, the Contractor shall provide a separate detailed report for condition and maintenance actions required. This report becomes property of the US Government and shall not be shared with third parties except with written permission from the 21 CES.
9.2. At the completion of the contract, the Contractor shall provide all reports/results for any tests performed related to this project. This report becomes property of the US Government and shall not be shared with third parties without written permission from 21 CES.
10. INSPECTION AND ACCEPTANCE
10.1. Inspection. All work shall be subject to inspection and testing by the
Government, to the extent practicable at all times and places during the term of the contract. The technical inspection will be performed by 21st Civil Engineer Squadron (21 CES).
10.2. At Final Acceptance. Final acceptance of all work required under this contract shall be made in writing by the Contracting Officer, based on the recommendation of 21 CES. Acceptance shall be contingent upon the contractor successfully demonstrating the following:
a.) Repaired Inverters: The three (3) repaired inverters shall be demonstrated to power on and provide a stable, uninterrupted power output, consistent with manufacturer's specifications.
b.) The seven (7) reprogrammed inverters shall be successfully tested by simulating a main power loss. A successful test is defined as the inverter automatically transferring to battery backup power and maintaining the load.
END OF STATEMENT OF WORK
END OF STATEMENT OF WORK