About this opportunity

This solicitation from the U.S. Army Corps of Engineers, Omaha District, seeks to stabilize approximately 1,000 linear feet of riverbank along the Missouri River in Yankton County, South Dakota through the placement of approximately 2,500 tons of riprap. The work will be awarded on a firm-fixed price basis to the responsible offeror providing the most advantageous offer evaluated based on price alone. An organized site visit for interested parties was held on February 24, 2021. Electronic offers were due by March 29, 2021 and were to be publicly opened via conference call.

The requirement is set aside for total small business and falls under NAICS code 237990 (Other Heavy and Civil Engineering Construction, PSC code C213 (Bank Stabilization). The government estimate for the work was between $250,000 and $500,000 to be performed in Lesterville, South Dakota. Three offers were received by the amended deadline of March 30, 2021 from Niewohner Construction, Air Control Inc., and Fenton Construction Inc. The awarded contractor will be notified by the U.S. Army Corps of Engineers Omaha District.

Notice text

2 versions

Update #2 · Latest ·

This project is for the implementation of bank stabilization measures in Yankton County, SD on Lewis and Clark Lake. The work location is on Lewis and Clark Lake approximately 10 miles upstream from Yankton SD. The work will consist of bank and slope protection of approximately 1,000 linear feet and 2,500 tons of rip rap on Lewis and Clark Lake on the site herein referred to as the “Lesterville" in Yankton County, South Dakota. The work will consist of placing riprap along the shoreline of the reservoir. Access to the site is a challenge due to a lack of well-maintained roads and steep drop off from the high bank.

Estimated Magnitude of Construction is between $250,000 and $500,000.

The government will post all solicitation documents to Beta SAM.gov

An Organized site visit has been scheduled for Wednesday, 24 February 2021 at 09:00 am. Participants interested in seeing the site need to make reservation with Michael Nuss telephone (402) 667-2560 or by e-mail at Michael.Y.Nuss@usace.army.mil

Participants will meet at --

Gavins Point Admin Building

55245 Nebraska Hwy 121

Crofton, NE 68730.

(Once all the participants arrive, they will carrivan to the site.)

Update 30 Mar 21

Bid Abstract added to attachment/links section
 

Update #1 ·

This project is for the implementation of bank stabilization measures in Yankton County, SD on Lewis and Clark Lake. The work location is on Lewis and Clark Lake approximately 10 miles upstream from Yankton SD. The work will consist of bank and slope protection of approximately 1,000 linear feet and 2,500 tons of rip rap on Lewis and Clark Lake on the site herein referred to as the “Lesterville" in Yankton County, South Dakota. The work will consist of placing riprap along the shoreline of the reservoir. Access to the site is a challenge due to a lack of well-maintained roads and steep drop off from the high bank.

Estimated Magnitude of Construction is between $250,000 and $500,000.

The government will post all solicitation documents to Beta SAM.gov

An Organized site visit has been scheduled for Wednesday, 24 February 2021 at 09:00 am. Participants interested in seeing the site need to make reservation with Michael Nuss telephone (402) 667-2560 or by e-mail at Michael.Y.Nuss@usace.army.mil

Participants will meet at --

Gavins Point Admin Building

55245 Nebraska Hwy 121

Crofton, NE 68730.

(Once all the participants arrive, they will carrivan to the site.)
 

Files

File Type Posted
Bid Abstract_21B0005.pdf PDF
Am0002 W9128F21B0005.pdf PDF
Am0001 W9128F21B0005.pdf PDF
Lesterville Dwgs.pdf PDF
Lestervile specs.pdf PDF

Notice history

Notice Type Posted
Lesterville Bank Stabilization Missouri River Mile 816. 5 Yankton County, SD Award Award Notice
This notice Latest solicitation Solicitation
Lesterville Bank Stabilization Missouri River Mile 816. 5 Yankton County, SD Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Lower brule north shoreline stabilization and ecosystem restoration, element 2 Big Bend, Lower Brule, South Dakota 57548 · NAICS 237990 ENDIST Omaha Total Small Business
Mill Creek Section 205 Flood Risk Management Improvements Mill Creek Flood Control ChannelWalla Walla, WA 99362Walla Walla County 99362 · NAICS 237990 ENDIST Walla Walla No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors