Lesterville Bank Stabilization Missouri River Mile 816. 5 Yankton County, SD

Closed Pre-Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest solicitation from .

Solicitation number
W9128F21B0005
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Yankton SD 57040 USA

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Corps of Engineers Omaha District intends to issue an invitation for bid for bank stabilization measures along the Missouri River in Yankton County, South Dakota. The solicitation will implement approximately 1,000 linear feet of bank and slope protection with 2,500 tons of riprap along Lewis and Clark Lake. The work location is approximately 10 miles upstream from Yankton, SD and will consist of placing riprap along the shoreline. The IFB is expected to issue on February 12, 2021 and close on March 15, 2021.

This total small business set-aside opportunity has an estimated magnitude of construction between $250,000 and $500,000. Access to the site presents challenges due to lack of maintained roads and steep drop offs. The government will post all solicitation documents to Beta SAM.gov.

Notice text

On or about 12 February 2021, U.S. Army Corps of Engineers (USACE) – Omaha District, intends to issue an invitation for bid (IFB) for Lesterville Bank Stabilization Missouri River Miles 816.5 in Yankton County, SD. The solicitation will close on or about 15 March 2021.

This project is for the implementation of bank stabilization measures in Yankton County, SD on Lewis and Clark Lake. The work location is on Lewis and Clark Lake approximately 10 miles upstream from Yankton SD. The work will consist of bank and slope protection of approximately 1,000 linear feet and 2,500 tons of rip rap on Lewis and Clark Lake on the site herein referred to as the “Lesterville" in Yankton County, South Dakota. The work will consist of placing riprap along the shoreline of the reservoir. Access to the site is a challenge due to a lack of well-maintained roads and steep drop offs from the high bank.

Estimated Magnitude of Construction is between $250,000 and $500,000.

The government will post all solicitation documents to Beta SAM.gov (beta.sam.gov).

Notice history

Notice Type Posted
Lesterville Bank Stabilization Missouri River Mile 816. 5 Yankton County, SD Award Award Notice
Lesterville Bank Stabilization Missouri River Mile 816. 5 Yankton County, SD Latest solicitation Solicitation
This notice Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Lower brule north shoreline stabilization and ecosystem restoration, element 2 Big Bend, Lower Brule, South Dakota 57548 · NAICS 237990 ENDIST Omaha Total Small Business
Mill Creek Section 205 Flood Risk Management Improvements Mill Creek Flood Control ChannelWalla Walla, WA 99362Walla Walla County 99362 · NAICS 237990 ENDIST Walla Walla No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors