This abstract of offers is for a construction project to implement bank stabilization measures on the Missouri River in Yankton County, South Dakota. The work will consist of placing approximately 1,000 linear feet and 2,500 tons of riprap along the shoreline of Lewis and Clark Lake to address erosion issues. Three offers were received by the deadline of March 30, 2021 from Niewohner Construction, Air Control Inc., and Fenton Construction Inc. The government estimate for the project was between $250,000 and $500,000. The awarded contractor will be notified by the U.S. Army Corps of Engineers Omaha District.

View the file

Other files

File Type Posted
Am0002 W9128F21B0005.pdf PDF
Am0001 W9128F21B0005.pdf PDF
Lesterville Dwgs.pdf PDF
Lestervile specs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABSTRACT OF OFFERS - CONSTRUCTION

1. SOLICITATION NUMBER 2. DATE ISSUED 3. DATE OPENED PAGE OF

PAGES

4. ISSUING OFFICE

5. PROJECT TITLE

6. NUMBER OF AMENDMENTS ISSUED

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL (Type)

SIGNATURE DATE SIGNED

7B. DESCRIPTION OF OFFERED ITEM

7C. EST.

QUANTITY

D.

UNIT

E. UNIT

PRICE

F. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

8. GOVERNMENT ESTIMATE

(Check A, B or C and complete D, E, and F)

A. HIRED LABOR

B. REASONABLE CONTRACT

(Without Profit)

C. REASONABLE CONTRACT

(Including Profit)

9. OFFERS

NO. 1 NO. 2

A. OFFEROR

B. BID SECURITY (Type and amount)

C. AMENDMENTS ACKNOWLEDGED

A. OFFEROR

B. BID SECURITY (Type and amount)

C. AMENDMENTS ACKNOWLEDGED

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is usable

NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)

7A.

ITEM

NO.

US Army Corps of Engineers Omaha District 1616 Capitol Ave Omaha, NE 68102

GP Lesterville Bank Stabilization Missouri River Miles 816.5 Yankton County SD

Place stone

Mobilization & Demobilization of Equipment

Site Access Improvements and Subsequent

All remaining work except for Options listed

Place Stone

Mobilization & Demobilization of Equipment

All remaining work in Option 1

Place Stone

Mobilization & Demobilization of Equipment

All remaining work in Option 2

TOTAL

Ton

Job

Job

Job

Ton

Job

Job

Ton

Job

Job

1,000

69.10

26,610.00

23,500.00

9,080.00

71.40

13,310.00

4,540.00

69.90

13,310.00

4,540.00

50,443.00

26,610.00

23,500.00

9,080.00

54,978.00

13,310.00

4,540.00

69,900.00

13,310.00

4,540.00

270,211.00

94,900.00

15,000.00

30,000.00

40,000.00

100,100.00

15,000.00

30,000.00

130,000.00

15,000.00

40,000.00

510,000.00

130.00

15,000.00

30,000.00

40,000.00

130.00

15,000.00

30,000.00

130.00

15,000.00

40,000.00

344.00

162,398.00

30,214.00

30,372.00

339.00

33,369.00

22,090.00

336.00

45,992.00

23,003.00

251,120.00

162,398.00

30,214.00

30,372.00

261,030.00

33,369.00

22,090.00

336,000.00

45,992.00

23,003.00

1,195,588.00

W9128F21B0005 1 2

David Neal Contracting Officer

Niewohner Construction Air Control Inc

Bid Bond - 20% Bid Bond - 20%

2 2

03/29/2021

03/30/2021

02/12/2021

ABSTRACT OF OFFERS - CONSTRUCTION

CONTINUATION SHEET

1. SOLICITATION NUMBER PAGE OF

PAGES

INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use addit ional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.

4. OFFERS (Continued)2. PROJECT TITLE

NO.: NO.: NO.: NO.:

A. OFFEROR A. OFFEROR A. OFFEROR A. OFFEROR

B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED

A.

ITEM

NO.

B.

ESTIMATED

QUANTITY

C.

UNIT D. UNIT

PRICE

E. ESTIMATED

AMOUNT

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is usable

OPTIONAL FORM 1419A (11-88)

W9128F21B0005

GP Lesterville Bank Stabilization Missouri River Miles 816.5 Yankton County SD

378,630.00

12,000.0012,000.00Job110

5,000.005,000.00Job19

85,000.0085.00Ton1,0008

9,130.009,130.00Job17

5,000.005,000.00Job16

65,450.0085.00Ton7705

78,000.0078,000.00Job14

42,000.0042,000.00Job13

15,000.0015,000.00Job12

730 Ton 85.00 62,050.00

2 2

Fenton Construction Inc.

TOTAL

2021-03-30T14:00:31-0500
NEAL.DAVID.W.1115489000

File details come from the government source that posted it. Updated .