This abstract of offers is for a construction project to implement bank stabilization measures on the Missouri River in Yankton County, South Dakota. The work will consist of placing approximately 1,000 linear feet and 2,500 tons of riprap along the shoreline of Lewis and Clark Lake to address erosion issues. Three offers were received by the deadline of March 30, 2021 from Niewohner Construction, Air Control Inc., and Fenton Construction Inc. The government estimate for the project was between $250,000 and $500,000. The awarded contractor will be notified by the U.S. Army Corps of Engineers Omaha District.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Am0002 W9128F21B0005.pdf | ||
| Am0001 W9128F21B0005.pdf | ||
| Lesterville Dwgs.pdf | ||
| Lestervile specs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABSTRACT OF OFFERS - CONSTRUCTION
1. SOLICITATION NUMBER 2. DATE ISSUED 3. DATE OPENED PAGE OF
PAGES
4. ISSUING OFFICE
5. PROJECT TITLE
6. NUMBER OF AMENDMENTS ISSUED
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
NAME AND TITLE OF CERTIFYING OFFICIAL (Type)
SIGNATURE DATE SIGNED
7B. DESCRIPTION OF OFFERED ITEM
7C. EST.
QUANTITY
D.
UNIT
E. UNIT
PRICE
F. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
8. GOVERNMENT ESTIMATE
(Check A, B or C and complete D, E, and F)
A. HIRED LABOR
B. REASONABLE CONTRACT
(Without Profit)
C. REASONABLE CONTRACT
(Including Profit)
9. OFFERS
NO. 1 NO. 2
A. OFFEROR
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
A. OFFEROR
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)
7A.
ITEM
NO.
US Army Corps of Engineers Omaha District 1616 Capitol Ave Omaha, NE 68102
GP Lesterville Bank Stabilization Missouri River Miles 816.5 Yankton County SD
Place stone
Mobilization & Demobilization of Equipment
Site Access Improvements and Subsequent
All remaining work except for Options listed
Place Stone
Mobilization & Demobilization of Equipment
All remaining work in Option 1
Place Stone
Mobilization & Demobilization of Equipment
All remaining work in Option 2
TOTAL
Ton
Job
Job
Job
Ton
Job
Job
Ton
Job
Job
1,000
69.10
26,610.00
23,500.00
9,080.00
71.40
13,310.00
4,540.00
69.90
13,310.00
4,540.00
50,443.00
26,610.00
23,500.00
9,080.00
54,978.00
13,310.00
4,540.00
69,900.00
13,310.00
4,540.00
270,211.00
94,900.00
15,000.00
30,000.00
40,000.00
100,100.00
15,000.00
30,000.00
130,000.00
15,000.00
40,000.00
510,000.00
130.00
15,000.00
30,000.00
40,000.00
130.00
15,000.00
30,000.00
130.00
15,000.00
40,000.00
344.00
162,398.00
30,214.00
30,372.00
339.00
33,369.00
22,090.00
336.00
45,992.00
23,003.00
251,120.00
162,398.00
30,214.00
30,372.00
261,030.00
33,369.00
22,090.00
336,000.00
45,992.00
23,003.00
1,195,588.00
W9128F21B0005 1 2
David Neal Contracting Officer
Niewohner Construction Air Control Inc
Bid Bond - 20% Bid Bond - 20%
2 2
03/29/2021
03/30/2021
02/12/2021
ABSTRACT OF OFFERS - CONSTRUCTION
CONTINUATION SHEET
1. SOLICITATION NUMBER PAGE OF
PAGES
INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use addit ional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.
4. OFFERS (Continued)2. PROJECT TITLE
NO.: NO.: NO.: NO.:
A. OFFEROR A. OFFEROR A. OFFEROR A. OFFEROR
B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)
3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED
A.
ITEM
NO.
B.
ESTIMATED
QUANTITY
C.
UNIT D. UNIT
PRICE
E. ESTIMATED
AMOUNT
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
OPTIONAL FORM 1419A (11-88)
W9128F21B0005
GP Lesterville Bank Stabilization Missouri River Miles 816.5 Yankton County SD
378,630.00
12,000.0012,000.00Job110
5,000.005,000.00Job19
85,000.0085.00Ton1,0008
9,130.009,130.00Job17
5,000.005,000.00Job16
65,450.0085.00Ton7705
78,000.0078,000.00Job14
42,000.0042,000.00Job13
15,000.0015,000.00Job12
730 Ton 85.00 62,050.00
2 2
Fenton Construction Inc.
TOTAL
| 2021-03-30T14:00:31-0500 | |
| NEAL.DAVID.W.1115489000 |
File details come from the government source that posted it. Updated .