KC 46A FTU Phase 3 - Altus AFB, OK
Awarded Award Notice Posted
- Solicitation number
- W912BV18R0062
- Agency
- ENDIST Tulsa US Army Corps of Engineers, Department of Defense
- Awarded
- to SGS LLC
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- W912BV19C0011 Federal contract award
- NAICS code
- 236220 Commercial and Institutional Building Construction
- PSC
- Not on record
- Place of performance
- Altus Air Force Base Altus AFB, Oklahoma 73521, United States
Notice details come from SAM.gov. Updated .
Notice text
5 versions
Update #5 · Latest ·
Awarded Vendors: SGS, LLC. Contract Award Dollar Amount: Base and Options $13,738,955.00. Contract Award Date: 2019-06-17.
Update #4 ·
Amendment 00002 is has now been uploaded to this solicitation. Also, the FBO Vender Guide has been added as a separate attatchment.
The closing date has not been changed, proposals are still du by 2:00pm CT on 13 December 2018.
This amendment is hereby modified, see attached amendment.
The closing date has been extended from 30 November 2018 to 13 December 2018 by 2:00pm CT.
This solicitation number has been changed to W912BV19R0013
1. Action Code: This is a Pre-Solicitation notice.
2. Date: 17 September 2018
3. Contracting Office Address:
USACE
2488 E. 81st Street
Tulsa, Oklahoma 74137-4290
4. Classification Code: Y - Construction of Structures and Facilities
5. Subject Title: KC 46A FTU Phase 3 - Altus AFB, OK.
6. Solicitation Number: W912BV18R0062
7. Contact(s) Points:
Name Sina Sullivan Brian Hutchison
Phone 918-669-7279 918-669-7426
Email Sina.C.Sullivan@usace.army.mil Brian.C.Hutchison@usace.army.mil
8. Important: This notice does not constitute a request for proposal, request for quote, or invitation for bid. The intent of this notice is to provide the pre-solicitation notice required by FAR 5.2 - Synopsis of Proposed Contract Actions in preparation for release of the Request for Proposal (RFP) at a later date.
9. Description: The RFP is for a Single-Phase unrestricted solicitation for the construction of the KC-46 FTU/FTC Simulator Trainer Phase 3 Altus, AFB, Oklahoma. The project is anticipated to be issued on or about the end of October 2018. The Proposal due date is planned, on or about, 30 November 2018. The North American Industry Code Standard (NAICS) is 236220 -- Commercial and Institutional Building Construction, and the size standard is $36,500,000.00. The planned procurement method is contracting by negotiation. The solicitation utilizes source selection procedures, which requires each Offeror to submit both a Price Proposal and a Technical Proposal. The Price Proposal and the Technical Proposal must be submitted as separate files. The non-priced technical proposal includes Specialized Experience, Past Performance, and Organization, Technical Approach, along with Participation of Small Business Concerns. The resulting contract is will be a firm-fixed price (FFP) contract for the work described in the Statement of Work which will be provided with the solicitation.
This project adds to and alters existing Flight Training Center (FTC) to house high bay, Weapons System Trainers (WST), Boom Operator Trainers (BOT), and Part Task Trainers (PTT), using economical construction methods to accomplish the classified training mission of the facility. Work includes an overhead crane, parking and pavements. In addition, local materials and construction techniques shall be used where cost effective. Work also includes all utilities, mechanical systems, communications support and fire detection/suppression systems to provide a complete and useable facility. Facilities will be a permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. This project will comply with DoD antiterrorism/force protection requirements per UFC 4-010-01.
10. Place of Contract Performance: The preponderance of the work to be placed under this contract is expected to be performed at Altus Air Force Base, Oklahoma 73521-0002.
11. Set Aside Status: This procurement has no set aside status.
12. Additional Details: THIS SOLICITATION WILL BE OFFERED IN ELECTRONIC FORMAT ONLY. NO HARD COPIES WILL BE PROVIDED. Offerors can view and/or download the RFP and attachments at https://www.fbo.gov (FBO) when the RFP is posted. Interested parties can register under the Interested Vendors List at FBO. This will be the only method of amendment distribution; therefore, it is the OFFERORS' RESPONSIBILITY TO CHECK THE WEBSITE PERIODICALLY FOR ANY AMENDMENTS TO THE SOLICITATION. Prospective Offerors MUST register themselves on the website. Prospective Offerors must also be registered with the System for Award Management (SAM) at https://www.sam.gov/portal/public/SAM in order to participate in this procurement.
13. "Disclosure of the Magnitude of Construction Projects"
In Accordance with FAR 36-204 and DFARS 236.204, the Construction Cost magnitude for this project is between $10,000,000.00 and $15,000,000.00 which includes all design, non-design, and construction cost for the total contract award. Offerors are under no obligation to approach the maximum cost magnitude given above.
14. Period of Performance (POP): The POP is approximately 540 calendar days.
15. No reimbursement will be made for any costs associated with providing information in response to this synopsis or any follow up information requests.
.
Update #3 ·
This amendment is hereby modified, see attached amendment.
The closing date has been extended from 30 November 2018 to 13 December 2018 by 2:00pm CT.
This solicitation number has been changed to W912BV19R0013
1. Action Code: This is a Pre-Solicitation notice.
2. Date: 17 September 2018
3. Contracting Office Address:
USACE
2488 E. 81st Street
Tulsa, Oklahoma 74137-4290
4. Classification Code: Y - Construction of Structures and Facilities
5. Subject Title: KC 46A FTU Phase 3 - Altus AFB, OK.
6. Solicitation Number: W912BV18R0062
7. Contact(s) Points:
Name Sina Sullivan Brian Hutchison
Phone 918-669-7279 918-669-7426
Email Sina.C.Sullivan@usace.army.mil Brian.C.Hutchison@usace.army.mil
8. Important: This notice does not constitute a request for proposal, request for quote, or invitation for bid. The intent of this notice is to provide the pre-solicitation notice required by FAR 5.2 - Synopsis of Proposed Contract Actions in preparation for release of the Request for Proposal (RFP) at a later date.
9. Description: The RFP is for a Single-Phase unrestricted solicitation for the construction of the KC-46 FTU/FTC Simulator Trainer Phase 3 Altus, AFB, Oklahoma. The project is anticipated to be issued on or about the end of October 2018. The Proposal due date is planned, on or about, 30 November 2018. The North American Industry Code Standard (NAICS) is 236220 -- Commercial and Institutional Building Construction, and the size standard is $36,500,000.00. The planned procurement method is contracting by negotiation. The solicitation utilizes source selection procedures, which requires each Offeror to submit both a Price Proposal and a Technical Proposal. The Price Proposal and the Technical Proposal must be submitted as separate files. The non-priced technical proposal includes Specialized Experience, Past Performance, and Organization, Technical Approach, along with Participation of Small Business Concerns. The resulting contract is will be a firm-fixed price (FFP) contract for the work described in the Statement of Work which will be provided with the solicitation.
This project adds to and alters existing Flight Training Center (FTC) to house high bay, Weapons System Trainers (WST), Boom Operator Trainers (BOT), and Part Task Trainers (PTT), using economical construction methods to accomplish the classified training mission of the facility. Work includes an overhead crane, parking and pavements. In addition, local materials and construction techniques shall be used where cost effective. Work also includes all utilities, mechanical systems, communications support and fire detection/suppression systems to provide a complete and useable facility. Facilities will be a permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. This project will comply with DoD antiterrorism/force protection requirements per UFC 4-010-01.
10. Place of Contract Performance: The preponderance of the work to be placed under this contract is expected to be performed at Altus Air Force Base, Oklahoma 73521-0002.
11. Set Aside Status: This procurement has no set aside status.
12. Additional Details: THIS SOLICITATION WILL BE OFFERED IN ELECTRONIC FORMAT ONLY. NO HARD COPIES WILL BE PROVIDED. Offerors can view and/or download the RFP and attachments at https://www.fbo.gov (FBO) when the RFP is posted. Interested parties can register under the Interested Vendors List at FBO. This will be the only method of amendment distribution; therefore, it is the OFFERORS' RESPONSIBILITY TO CHECK THE WEBSITE PERIODICALLY FOR ANY AMENDMENTS TO THE SOLICITATION. Prospective Offerors MUST register themselves on the website. Prospective Offerors must also be registered with the System for Award Management (SAM) at https://www.sam.gov/portal/public/SAM in order to participate in this procurement.
13. "Disclosure of the Magnitude of Construction Projects"
In Accordance with FAR 36-204 and DFARS 236.204, the Construction Cost magnitude for this project is between $10,000,000.00 and $15,000,000.00 which includes all design, non-design, and construction cost for the total contract award. Offerors are under no obligation to approach the maximum cost magnitude given above.
14. Period of Performance (POP): The POP is approximately 540 calendar days.
15. No reimbursement will be made for any costs associated with providing information in response to this synopsis or any follow up information requests.
.
Update #2 ·
This solicitation number has been changed to W912BV19R0013
1. Action Code: This is a Pre-Solicitation notice.
2. Date: 17 September 2018
3. Contracting Office Address:
USACE
2488 E. 81st Street
Tulsa, Oklahoma 74137-4290
4. Classification Code: Y - Construction of Structures and Facilities
5. Subject Title: KC 46A FTU Phase 3 - Altus AFB, OK.
6. Solicitation Number: W912BV18R0062
7. Contact(s) Points:
Name Sina Sullivan Brian Hutchison
Phone 918-669-7279 918-669-7426
Email Sina.C.Sullivan@usace.army.mil Brian.C.Hutchison@usace.army.mil
8. Important: This notice does not constitute a request for proposal, request for quote, or invitation for bid. The intent of this notice is to provide the pre-solicitation notice required by FAR 5.2 - Synopsis of Proposed Contract Actions in preparation for release of the Request for Proposal (RFP) at a later date.
9. Description: The RFP is for a Single-Phase unrestricted solicitation for the construction of the KC-46 FTU/FTC Simulator Trainer Phase 3 Altus, AFB, Oklahoma. The project is anticipated to be issued on or about the end of October 2018. The Proposal due date is planned, on or about, 30 November 2018. The North American Industry Code Standard (NAICS) is 236220 -- Commercial and Institutional Building Construction, and the size standard is $36,500,000.00. The planned procurement method is contracting by negotiation. The solicitation utilizes source selection procedures, which requires each Offeror to submit both a Price Proposal and a Technical Proposal. The Price Proposal and the Technical Proposal must be submitted as separate files. The non-priced technical proposal includes Specialized Experience, Past Performance, and Organization, Technical Approach, along with Participation of Small Business Concerns. The resulting contract is will be a firm-fixed price (FFP) contract for the work described in the Statement of Work which will be provided with the solicitation.
This project adds to and alters existing Flight Training Center (FTC) to house high bay, Weapons System Trainers (WST), Boom Operator Trainers (BOT), and Part Task Trainers (PTT), using economical construction methods to accomplish the classified training mission of the facility. Work includes an overhead crane, parking and pavements. In addition, local materials and construction techniques shall be used where cost effective. Work also includes all utilities, mechanical systems, communications support and fire detection/suppression systems to provide a complete and useable facility. Facilities will be a permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. This project will comply with DoD antiterrorism/force protection requirements per UFC 4-010-01.
10. Place of Contract Performance: The preponderance of the work to be placed under this contract is expected to be performed at Altus Air Force Base, Oklahoma 73521-0002.
11. Set Aside Status: This procurement has no set aside status.
12. Additional Details: THIS SOLICITATION WILL BE OFFERED IN ELECTRONIC FORMAT ONLY. NO HARD COPIES WILL BE PROVIDED. Offerors can view and/or download the RFP and attachments at https://www.fbo.gov (FBO) when the RFP is posted. Interested parties can register under the Interested Vendors List at FBO. This will be the only method of amendment distribution; therefore, it is the OFFERORS' RESPONSIBILITY TO CHECK THE WEBSITE PERIODICALLY FOR ANY AMENDMENTS TO THE SOLICITATION. Prospective Offerors MUST register themselves on the website. Prospective Offerors must also be registered with the System for Award Management (SAM) at https://www.sam.gov/portal/public/SAM in order to participate in this procurement.
13. "Disclosure of the Magnitude of Construction Projects"
In Accordance with FAR 36-204 and DFARS 236.204, the Construction Cost magnitude for this project is between $10,000,000.00 and $15,000,000.00 which includes all design, non-design, and construction cost for the total contract award. Offerors are under no obligation to approach the maximum cost magnitude given above.
14. Period of Performance (POP): The POP is approximately 540 calendar days.
15. No reimbursement will be made for any costs associated with providing information in response to this synopsis or any follow up information requests.
.
Update #1 ·
1. Action Code: This is a Pre-Solicitation notice.
2. Date: 17 September 2018
3. Contracting Office Address:
USACE
2488 E. 81st Street
Tulsa, Oklahoma 74137-4290
4. Classification Code: Y - Construction of Structures and Facilities
5. Subject Title: KC 46A FTU Phase 3 - Altus AFB, OK.
6. Solicitation Number: W912BV18R0062
7. Contact(s) Points:
Name Sina Sullivan Brian Hutchison
Phone 918-669-7279 918-669-7426
Email Sina.C.Sullivan@usace.army.mil Brian.C.Hutchison@usace.army.mil
8. Important: This notice does not constitute a request for proposal, request for quote, or invitation for bid. The intent of this notice is to provide the pre-solicitation notice required by FAR 5.2 - Synopsis of Proposed Contract Actions in preparation for release of the Request for Proposal (RFP) at a later date.
9. Description: The RFP is for a Single-Phase unrestricted solicitation for the construction of the KC-46 FTU/FTC Simulator Trainer Phase 3 Altus, AFB, Oklahoma. The project is anticipated to be issued on or about the end of October 2018. The Proposal due date is planned, on or about, 30 November 2018. The North American Industry Code Standard (NAICS) is 236220 -- Commercial and Institutional Building Construction, and the size standard is $36,500,000.00. The planned procurement method is contracting by negotiation. The solicitation utilizes source selection procedures, which requires each Offeror to submit both a Price Proposal and a Technical Proposal. The Price Proposal and the Technical Proposal must be submitted as separate files. The non-priced technical proposal includes Specialized Experience, Past Performance, and Organization, Technical Approach, along with Participation of Small Business Concerns. The resulting contract is will be a firm-fixed price (FFP) contract for the work described in the Statement of Work which will be provided with the solicitation.
This project adds to and alters existing Flight Training Center (FTC) to house high bay, Weapons System Trainers (WST), Boom Operator Trainers (BOT), and Part Task Trainers (PTT), using economical construction methods to accomplish the classified training mission of the facility. Work includes an overhead crane, parking and pavements. In addition, local materials and construction techniques shall be used where cost effective. Work also includes all utilities, mechanical systems, communications support and fire detection/suppression systems to provide a complete and useable facility. Facilities will be a permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. This project will comply with DoD antiterrorism/force protection requirements per UFC 4-010-01.
10. Place of Contract Performance: The preponderance of the work to be placed under this contract is expected to be performed at Altus Air Force Base, Oklahoma 73521-0002.
11. Set Aside Status: This procurement has no set aside status.
12. Additional Details: THIS SOLICITATION WILL BE OFFERED IN ELECTRONIC FORMAT ONLY. NO HARD COPIES WILL BE PROVIDED. Offerors can view and/or download the RFP and attachments at https://www.fbo.gov (FBO) when the RFP is posted. Interested parties can register under the Interested Vendors List at FBO. This will be the only method of amendment distribution; therefore, it is the OFFERORS' RESPONSIBILITY TO CHECK THE WEBSITE PERIODICALLY FOR ANY AMENDMENTS TO THE SOLICITATION. Prospective Offerors MUST register themselves on the website. Prospective Offerors must also be registered with the System for Award Management (SAM) at https://www.sam.gov/portal/public/SAM in order to participate in this procurement.
13. "Disclosure of the Magnitude of Construction Projects"
In Accordance with FAR 36-204 and DFARS 236.204, the Construction Cost magnitude for this project is between $10,000,000.00 and $15,000,000.00 which includes all design, non-design, and construction cost for the total contract award. Offerors are under no obligation to approach the maximum cost magnitude given above.
14. Period of Performance (POP): The POP is approximately 540 calendar days.
15. No reimbursement will be made for any costs associated with providing information in response to this synopsis or any follow up information requests.
.
Attachments
| File | Type | Posted |
|---|---|---|
| Amendment_00002.pdf | ||
| fbo_vender_guide.pdf | ||
| KC-46A_Ph_2_-_Flow_Diagram.pdf | ||
| KC-46A_Ph_2_-_Rev_Shop_Drawing.pdf | ||
| KC-46A_Ph_2_-_Rev_Calculations.pdf | ||
| Amendment_00001.pdf | ||
| KC46A_FTC_PH_3_site_visit_sign_in_11.14.18.pdf | ||
| KC-46A_FTC_P3_Solicitation_W912BV19R0013_Appendices.pdf | ||
| Badge_App_04.24.15.pdf | ||
| KC-46A_FTC_P3_Solicitation_W912BV19R0013.pdf |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity