Amendment_00002.pdf
PDF 10 MB Posted
- Attached to
- KC 46A FTU Phase 3 - Altus AFB, OK Federal contract opportunity
- Solicitation number
- W912BV18R0062
About this file
Amendment 00002
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| fbo_vender_guide.pdf | ||
| Amendment_00001.pdf | ||
| KC-46A_Ph_2_-_Flow_Diagram.pdf | ||
| KC-46A_Ph_2_-_Rev_Shop_Drawing.pdf | ||
| KC-46A_Ph_2_-_Rev_Calculations.pdf | ||
| KC46A_FTC_PH_3_site_visit_sign_in_11.14.18.pdf | ||
| KC-46A_FTC_P3_Solicitation_W912BV19R0013.pdf | ||
| KC-46A_FTC_P3_Solicitation_W912BV19R0013_Appendices.pdf | ||
| Badge_App_04.24.15.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The revised/new sections/appendices/pages listed below are hereby added to or revised and made a part of the solicitation. Revised or added/deleted information can be located in the specifications by searching for an asterisk and amendment number (i.e., *AM2).
This amendment does not extend the solicitation closing date; proposals are still due by 2:00pm CT on 13 December 2018.
Note: The FBO Vender Guide has been uploaded as a separate attachment to the solicitation.
All other terms and conditions remain in effect and unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BV19R0013
X 9B. DATED (SEE ITEM 11)
31-Oct-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
00002
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
30-Nov-2018
CODE
CONTRACTING DIV
US ARMY CORPS OF ENGINEERS, TULSA DISTRICT
2488 E. 81ST STREET
TULSA OK 74137-4290
W912BV 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912BV19R0013
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 21 00 - INSTRUCTIONS, CONDITIONS & NOTICES TO OFFERORS
The following have been added by full text:
AMENDMENT 00002
AMENDMENT 00002
W912BV18R0062
KC‐46A FTC SIMULATOR FACILITY PHASE 3
ALTUS AFB, OK
The revised/new sections/appendices/pages listed below are hereby added to or revised and made a part of the solicitation. Revised or added/deleted information can be located in the specifications by searching for an asterisk and amendment number (i.e., *AM2).
TABLE OF CONTENTS
CHANGES TO PAGE 4 OF TOC
SPECIFICATIONS
00 22 11 PROPOSAL SUBMISSION REQUIREMENTS, EVALUATION CRITERIA AND
BASIS OF AWARD (CHANGED PAGES 2 ‐ 3)
APPENDICES
APPENDIX F KC‐46A FTC PHASE 1 & 2 FIRE PROTECTION DESIGN (ADDED IN ITʹS
ENTIRETY)
‐‐ End CONTINUATION SHEET ‐‐
KC-46A FTU FTC Simulator Facility Phase 3 AGGN213000 Altus AFB, OK
31 00 00 EARTHWORK
31 05 19 GEOTEXTILE
31 11 00 CLEARING AND GRUBBING
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID
PAVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 11 23 GRADED-CRUSHED AGGREGATE BASE COURSES
32 12 13 BITUMINOUS TACK AND PRIME COATS
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE
FACILITIES
32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS
32 17 23 PAVEMENT MARKINGS
32 92 19 SEEDING
32 92 23 SODDING
32 93 00 EXTERIOR PLANTS
DIVISION 33 - UTILITIES
33 30 00 SANITARY SEWERS
33 40 00 STORM DRAINAGE UTILITIES
33 70 02.00 10 ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 22 13.14 BRIDGE CRANES, OVERHEAD ELECTRIC, TOP RUNNING
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 4
APPENDICES
APPENDIX A
APPENDIX B
APPENDIX C
APPENDIX D
APPENDIX E
APPENDIX F
DRAWINGS
EXTERIOR FINISHES
FURNITURE, FIXTURES AND EQUIPMENT
MISSION SUPPORT EQUIPMENT
DRAFT FORM DD 1354
KC-46A FTC PHASE 1 & 2 FIRE
PROTECTION DESIGN
DIVISION 27 - COMMUNICATIONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 20 01.00 10 28 31 76
ELECTRONIC SECURITY SYSTEM
INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
*AM2
SECTION 00 21 00 - INSTRUCTIONS, CONDITIONS & NOTICES TO OFFERORS
AMENDMENT 00002
5.0 VOLUME 1 – FACTOR 1 – EXPERIENCE
5.1 VOLUME 1 – TAB B: SUBFACTOR 1 - SPECIALIZED EXPERIENCE PRIME
5.1.1 Submission Requirements:
5.1.1.1 The prime contractor shall demonstrate recent, relevant experience on similar projects using the Company – Specialized Experience form – (Attachment 1) at the end of the section.
Offerors may identify state and local government and private contracts that are similar to the Government’s requirements as outlined in that outlined in the Summary of Work Section 01 11 0.0 If the Offeror is a joint venture or teaming arrangement, each firm shall provide information, demonstrating experience relevant to their role on this project. Offeror shall provide a copy of the joint venture agreement or letters of commitment for all teaming contractors, agreements and letters of commitment will not count towards the page limitations. Submit projects that are currently well underway (designed and at least 50% construction progress completed) or completed and turned over no longer than five (5) years preceding the date of this solicitation.* If any firm has multiple functions or divisions, limit the project examples to those performed by the division or unit submitting the offer or by the team member. Prime contractor must submit at least one project involving construction of a facility in preparation for the installation of aircraft simulators, aircraft trainers, or other similar training equipment, with a value of $10 million or greater. The prime contractor shall submit at least three (3) projects but no more than five (5) projects. Each project submitted shall be limited to two (2) page per project.
00 22 11
ATTACHMENT 1
SECTION 00 22 11
COMPANY SPECIALIZED EXPERIENCE – CONSTRUCTION
Provide the following information to show examples of projects your company constructed within the last five (5) years indicating experience with projects of similar type and scope. Use one form per project. *
1. Type of Facility Represented
2. Your Firm’s Name
3. Name of Project and Contract Number
4. Location of Project
5. Project Contract Type
6. Owner
General Scope of Construction Project (address how this relates to this solicitation)
Your Role:
(Prime, Joint Venture, or Subcontractor) and Work Your Company Self-Performed (also include any proposed team members that were directly involved in this project, including work performed, roles and responsibilities):
Provide a list of the management team and their responsibility at a minimum include Project Manager, Quality Control Representative, and Construction Superintendent.
7. Construction Cost (For prime Total Contract and Subcontracted amounts, for sub total contract and your subcontract mounts)
8. Extent and Type of Work You Subcontracted Out
9. Dates Construction: Began Completed
10. Your Performance Evaluation by Owner, if known
11. Were You Terminated or Assessed Liquidated damages?
(If either is “Yes”, attach an Explanation)
12. Owner’s Point of Contact for Reference (Name and Company)
13. Current Telephone Number of Reference POC
Section 00 22 11
NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ‐0)
CONTRACT INFORMATION (Contractor to complete Blocks 1‐4)
APPENDICES
APPENDIX A - DRAWINGS
APPENDIX B - EXTERIOR FINISHES
APPENDIX C - FURNITURE, FIXTURES AND EQUIPMENT (FF&E)
APPENDIX D - MISSION SUPPORT EQUIPMENT (MSE)
APPENDIX E - DRAFT FORM DD 1354
APPENDIX F - KC-46A FTC PHASE 1 & 2 FIRE PROTECTION DESIGN*AM2 *
APPENDIX F
KC-46A FTU FTC Simulator Facility Phase 1 and 2
Fire Protection Design
Draft form to be provided under separate cover
*AM2 ADDED APPENDIX F IN IT'S ENTIRETY ON THE FOLLOWING PAGES*
Paradigm Building Science & Engineering, PLLC PO Box 204; Choctaw, OK 73020
405-306-1400
November 19, 2018 Mr. Eric Baze Advanced Fire Protection 1631 SE 15th Street
OKC, OK 73129
RE: AAFB KC-46A Simulator Facility Phase 2 Fire Protection System Re-Submittal Review
Mr. Baze, Attached is the material submittal(s) that we have reviewed for the above referenced project. As the FPE Reviewer specific to listed items below, we have reviewed the submittals with the approved construction documents for conformity and intent. This review is only for general conformance with the design concept of the project and general compliance with the information given in the contract documents. This review neither determines accuracy of quantities or dimensions nor substantiates installation instruction or performance of equipment or systems designed by the contractor. The contractor is responsible for complying with the contract documents, including dimensions, quantities for confirmation between trades, designs by the contractors, construction means, methods, techniques, sequences and safety. Our recommendations are as follows:
Submittal Item Location or Intended
Use
Specification Section or Construction Detail
Submittal Status
Submittal Documents Received:
A. Flow Diagram – Fire Sprinkler Submittal B. Hydraulic Calculations – Fire Sprinkler Submittal C. Shop Drawings – Fire Sprinkler Submittal
Fire Sprinkler 211313
A. Flow Diagram Reviewed, no exceptions B. Hyd. Calcs.
Reviewed, no exceptions C. Shop Drawings Reviewed, no exceptions
If you have any questions, please feel free to contact us.
Sincerely, Lance D. LaRue P.E., FPE
Hydraulic Overview Job Number: OC1242
Report Description: Ordinary Group II
Node Flow(gpm) Hose Flow(gpm) Static(psi) Residual(psi)Name
1 1105.02 250.00 120.000 96.000Water Supply
Identifier Pressure(psi) K-Factor(K) Flow(gpm)
Job
System
Supplies Check Point Gauges
OC1242 VUOCHLIN VEUNG
ALTUS KC-46A SIMULATOR FACILITY PHASE 2
ALTUS AIR FORCE BASE
OKLAHOMA
4058356904
Altus KC46A - 1st Floor - FS101.cad
ALTUS AIR FORCE FIRE MARSHAL
KC-46A PHASE 2/1ST FLOOR
Job Name:
Address 1
Address 2
Design Engineer
Phone FAX
State Certification/License Number
AHJ
Job Site/Building
Most Demanding Sprinkler Data
Coverage Per Sprinkler
Total Demand
Area of Application
Hose Streams
Number Of Sprinklers Calculated
Pressure Result
Job Number
1098.06 @ 85.080
Water Supply at Node 1 (1105.02, 250.00, 120.000, 96.000)
0.200gpm/ft²
8 K-Factor 23.50 at 8.630
118.50ft²
2500.00ft² (Actual 2532.15ft²)
Density
+11.199 (11.6%)
Address 3
System Pressure Demand System Flow Demand
85.080 848.06
250.00
© M.E.P.CAD, Inc. 11/2/2018 Page 1AutoSPRINK 2018 v14.1.4.0 12:14:11PM
- 1A
Hydraulic Summary
Job Number: OC1242
Node Flow(gpm)
Total Hose Streams
250.00
Safety MarginRequiredAvailable
Node
Hose Flow Static Residual Flow Total Demand
(gpm) (psi) (psi) (gpm) (psi) (gpm) (psi) (psi)@@Name
1 96.279 85.080 11.1991105.02250.00 96.000120.000 1098.06Water Supply
Design EngineerJob Number
Total Water Required (Including Hose Allowance)
1098.06
Maximum Pressure Unbalance In Loops
0.000
Additional Hose Supplies
250.00
Hose Allowance At Source
Supplies
5233.88gal
Ordinary Group II
0.200gpm/ft²
118.50ft²
2500.00ft² (Actual 2532.15ft²)
Occupancy
Area of Application
Coverage Per SprinklerNumber Of Sprinklers Calculated
Density
Job Suffix
AutoPeak Results: Pressure For Remote Area(s) Adjacent To Most Remote Area
Volume capacity of Dry PipesVolume capacity of Wet Pipes
4.92 between nodes 1 and 2 Maximum Velocity Under Ground
21.37 between nodes 3001 and 3002 Maximum Velocity Above Ground
8 K-Factor 23.50 at 8.630 Most Demanding Sprinkler Data
System
KC-46A PHASE 2/1ST FLOOROKLAHOMA
Job Site/Building
ALTUS AIR FORCE FIRE MARSHALALTUS AIR FORCE BASE
AHJ
790ALTUS KC-46A SIMULATOR FACILITY PHASE 2
Job
State Certification/License NumberJob Name:
VUOCHLIN VEUNGOC1242
Contractor
Contractor Number
OC1242
Name of Contractor:
SGS, LLC
Address 1
4400 SW 15TH STREET
Address 2
OKLAHOMA CITY, OK 73108
Contact Name Contact Title
ExtensionPhone
FAX
Web-SiteAddress 3
Address 1
Address 2
Drawing Name
Altus KC46A - 1st Floor - FS101.cad
System Flow Demand
848.06
Remote Area(s)
Address 3
11/2/2018© M.E.P.CAD, Inc. Page 2AutoSPRINK 2018 v14.1.4.0 12:14:17PM
Hydraulic Graph
Job Number: OC1242
96.000 @ 1105.02
Residual: Pressure
120.000
Static: Pressure
Water Supply at Node 1
Hydraulic Graph
Water Supply at Node 1
85.080 @ 848.06
85.080 @ 1098.06
Available Pressure at Time of Test
96.279 @ 1098.06
System Demand
System Demand (Including Hose Allowance at Source)
© M.E.P.CAD, Inc. 11/2/2018 Page 3AutoSPRINK 2018 v14.1.4.0 12:14:21PM
Device (gpm)
Actual Flow Minimum Flow
(gpm) (K)
K-Factor
(psi)
Pressure
Summary Of Outflowing Devices Report Description: Ordinary Group II
Job Number: OC1242
Sprinkler 301 30.98 23.70 8 15.000
Sprinkler 302 30.44 23.70 8 14.480
Sprinkler 303 29.05 23.70 8 13.183
Sprinkler 304 29.57 23.70 8 13.660
Sprinkler 305 30.33 23.70 8 14.374
Sprinkler 306 28.94 23.70 8 13.084
Sprinkler 307 25.40 21.17 8 10.079
Sprinkler 308 22.11 21.17 8 7.639
Sprinkler 309 23.96 23.50 8 8.968
Sprinkler 310 23.50 23.50 8 8.630
Sprinkler 311 26.33 23.50 8 10.833
Sprinkler 312 24.98 23.50 8 9.750
Sprinkler 313 25.18 23.50 8 9.911
Sprinkler 314 26.42 23.50 8 10.909
Sprinkler 315 25.22 23.50 8 9.938
Sprinkler 316 25.43 23.50 8 10.101
Sprinkler 317 26.70 23.50 8 11.143
Sprinkler 318 25.71 23.50 8 10.331
Sprinkler 319 25.92 23.50 8 10.500
Sprinkler 320 27.26 23.50 8 11.615
Sprinkler 321 26.75 23.50 8 11.183
Sprinkler 322 26.54 23.50 8 11.003
Sprinkler 323 32.59 23.50 8 16.598
Sprinkler 324 28.85 23.70 8 13.008
Sprinkler 325 27.48 23.70 8 11.795
Sprinkler 326 28.92 23.70 8 13.064
Sprinkler 327 27.53 23.70 8 11.846
Sprinkler 328 27.77 21.17 8 12.053
Sprinkler 329 29.17 21.17 8 13.293
Sprinkler 330 30.23 22.82 8 14.277
Sprinkler 331 28.79 22.82 8 12.951
Most Demanding Sprinkler Data
© M.E.P.CAD, Inc. 11/2/2018 Page 6AutoSPRINK 2018 v14.1.4.0 12:14:25PM
FittingsNode Elevation(Foot) Pressure(psi) Discharge(gpm)
Node Analysis Report Description: Ordinary Group II
Job Number: OC1242
1 -1'-0 S 85.080 848.06
301 35'-5 Spr(-15.000) 15.000 30.98
302 35'-5¼ Spr(-14.480) 14.480 30.44
303 38'-6¼ Spr(-13.183) 13.183 29.05
304 38'-6 Spr(-13.660) 13.660 29.57
305 35'-5¾ Spr(-14.374) 14.374 30.33
306 38'-6½ Spr(-13.084) 13.084 28.94
307 11'-10 Spr(-10.079) 10.079 25.40
308 11'-9 Spr(-7.639) 7.639 22.11
309 9'-6¼ Spr(-8.968) 8.968 23.96
310 9'-6¼ Spr(-8.630) 8.630 23.50
311 9'-6¼ Spr(-10.833) 10.833 26.33
312 9'-6¼ Spr(-9.750) 9.750 24.98
313 9'-6¼ Spr(-9.911) 9.911 25.18
314 9'-6¼ Spr(-10.909) 10.909 26.42
315 9'-6¼ Spr(-9.938) 9.938 25.22
316 9'-6¼ Spr(-10.101) 10.101 25.43
317 9'-6¼ Spr(-11.143) 11.143 26.70
318 9'-6¼ Spr(-10.331) 10.331 25.71
319 9'-6¼ Spr(-10.500) 10.500 25.92
320 9'-6¼ Spr(-11.615) 11.615 27.26
321 9'-6¼ Spr(-11.183) 11.183 26.75
322 9'-6¼ Spr(-11.003) 11.003 26.54
323 9'-6¼ Spr(-16.598) 16.598 32.59
324 35'-7¾ Spr(-13.008) 13.008 28.85
325 38'-8½ Spr(-11.795) 11.795 27.48
326 35'-8 Spr(-13.064) 13.064 28.92
327 38'-9 Spr(-11.846) 11.846 27.53
328 38'-9¼ Spr(-12.053) 12.053 27.77
329 35'-8¼ Spr(-13.293) 13.293 29.17
330 35'-8½ Spr(-14.277) 14.277 30.23
331 38'-9½ Spr(-12.951) 12.951 28.79
2 0'-10½ 81.610
3001 2'-0 PO(20'-0) 79.627
3002 31'-3 24.146
3003 32'-2 fT(25'-0) 16.999
3004 35'-5 PO(10'-0) 15.126
3005 38'-6 PO(10'-0) 13.775
3006 51'-0 PO(10'-0) 8.340
3007 10'-2 PO(15'-0) 13.138
3008 10'-2 PO(5'-0) 10.439
3009 10'-2 PO(5'-0) 10.363
3010 10'-2 PO(5'-0) 10.774
3011 10'-2 PO(8'-0) 13.131
3012 10'-2 PO(5'-0) 13.136
3013 10'-2 PO(5'-0) 11.918
3014 10'-2 PO(5'-0) 11.723
3015 10'-2 PO(8'-0) 13.206
3016 51'-0 PO(10'-0) 8.337
3017 10'-2 PO(5'-0) 13.229
3018 10'-2 PO(5'-0) 11.951
3019 10'-2 PO(5'-0) 12.149
3020 10'-2 PO(8'-0) 13.460
3021 10'-2 PO(5'-0) 13.514
3022 51'-0 PO(10'-0) 8.336
3023 10'-2 PO(5'-0) 12.428
3024 10'-2 PO(5'-0) 12.633
3025 10'-2 PO(8'-0) 13.992
3026 10'-2 PO(5'-0) 14.090
3027 10'-2 PO(5'-0) 13.243
3028 10'-2 PO(5'-0) 13.461
3029 10'-2 PO(8'-0) 14.901
© M.E.P.CAD, Inc. 11/2/2018 Page 7AutoSPRINK 2018 v14.1.4.0 12:14:29PM
Report Description: Ordinary Group II
Job Number: OC1242
3030 10'-2 PO(15'-0) 17.315
3031 51'-0 PO(10'-0) 8.336
3032 10'-2 PO(5'-0) 20.151
3033 10'-2 22.280
3034 31'-6½ 16.008
3035 32'-2 fT(25'-0) 16.048
3036 35'-8½ PO(10'-0), 2Z 14.399
3037 38'-9½ PO(10'-0) 13.061
3042 51'-0 PO(10'-0) 7.785
3043 51'-0 PO(10'-0) 7.787
3048 51'-0 PO(10'-0) 7.788
3055 51'-0 PO(10'-0) 7.789
© M.E.P.CAD, Inc. 11/2/2018 Page 8AutoSPRINK 2018 v14.1.4.0 12:14:29PM
Pipe Type Diameter Flow Velocity Friction Loss Length Pressure
Downstream Elevation Discharge K-Factor Pt Pn Fittings Eq. Length Summary
Upstream Total Length
HWC
Hydraulic Analysis Job Number: OC1242
Report Description: Ordinary Group II
• • • • • Route 1 • • • • •
Pf
Pe
Pv
DR 1.0490 23.50 8.72 0.175389 2'-5¾ 2.014
310 9'-6¼ 23.50 8 8.630 9'-0 -0.281
3009 10'-2 10.363 11'-5¾
Sprinkler, 2E(2'-0), PO(5'-0)
Pf
Pe
Pv
BL 1.6100 23.50 3.70 0.021774 3'-5¾ 0.076
3009 10'-2 10.363
3008 10'-2 10.439 3'-5¾
Pf
Pe
Pv
BL 1.6100 45.61 7.19 0.074253 4'-6¼ 0.335
3008 10'-2 22.11 10.439
3010 10'-2 10.774 4'-6¼
Flow (q) from Route 3
Pf
Pe
Pv
BL 1.6100 69.57 10.96 0.162140 6'-6½ 2.358
3010 10'-2 23.96 10.774 8'-0
3011 10'-2 13.131 14'-6½
Flow (q) from Route 2
PO(8'-0)
Pf
Pe
Pv
CM 3.0680 57.51 2.50 0.004934 1'-0 0.005
3011 10'-2 13.131 0.000
3012 10'-2 13.136 1'-0
Pf
Pe
Pv
CM 3.0680 83.84 3.64 0.009910 7'-0 0.069
3012 10'-2 26.33 13.136 -0.000
3015 10'-2 13.206 7'-0
Flow (q) from Route 10
Pf
Pe
Pv
CM 3.0680 134.01 5.82 0.023596 1'-0 0.024
3015 10'-2 50.16 13.206 0.000
3017 10'-2 13.229 1'-0
Flow (q) from Route 4
Pf
Pe
Pv
CM 3.0680 160.43 6.96 0.032919 7'-0 0.230
3017 10'-2 26.42 13.229 -0.000
3020 10'-2 13.460 7'-0
Flow (q) from Route 11
Pf
Pe
Pv
CM 3.0680 211.07 9.16 0.054685 1'-0 0.055
3020 10'-2 50.64 13.460 0.000
3021 10'-2 13.514 1'-0
Flow (q) from Route 6
Pf
Pe
Pv
CM 3.0680 237.78 10.32 0.068169 7'-0 0.477
3021 10'-2 26.70 13.514 -0.000
3025 10'-2 13.992 7'-0
Flow (q) from Route 13
Pf
Pe
Pv
CM 3.0680 289.41 12.56 0.098057 1'-0 0.098
3025 10'-2 51.64 13.992 0.000
3026 10'-2 14.090 1'-0
Flow (q) from Route 8
Pf
Pe
Pv
CM 3.0680 316.68 13.74 0.115828 7'-0 0.811
3026 10'-2 27.26 14.090 -0.000
3029 10'-2 14.901 7'-0
Flow (q) from Route 15
Pf
Pe
Pv
CM 3.0680 369.97 16.06 0.154444 0'-7¾ 2.416
3029 10'-2 53.29 14.901 15'-0 -0.002
3030 10'-2 17.315 15'-7¾
Flow (q) from Route 12
PO(15'-0)
Pf
Pe
Pv
CM 3.0680 407.43 17.68 0.184611 0'-4¼ 2.835
3030 10'-2 37.46 17.315 15'-0 0.002
3032 10'-2 20.151 15'-4¼
PO(15'-0), Flow (q) from Route
Pf
Pe
Pv
CM 3.0680 440.02 19.10 0.212857 5'-0 2.129
3032 10'-2 32.59 20.151 5'-0 0.000
3033 10'-2 22.280 10'-0
Flow (q) from Route 25 fE(5'-0)
Pf
Pe
Pv
CM 4.0260 440.02 11.09 0.056668 39'-3 2.994
3033 10'-2 22.280 13'-7 -9.266
3034 31'-6½ 16.008 52'-10
2fE(6'-9½)
Pf
Pe
Pv
BL 6.0650 440.02 4.89 0.007704 5'-5½ 0.312
3034 31'-6½ 16.008 35'-0 -0.271
3035 32'-2 16.048 40'-5½ fE(10'-0), fT(25'-0)
Pf
Pe
Pv
FM 6.0650 594.90 6.61 0.013458 70'-6¾ 0.950
3035 32'-2 154.88 16.048 0.001
3003 32'-2 16.999 70'-6¾
Flow (q) from Route 16
Pf
Pe
Pv
BL 6.0650 848.06 9.42 0.025933 220'-3¼ 6.750
3003 32'-2 253.16 16.999 40'-0 0.397
3002 31'-3 24.146 260'-3¼
Flow (q) from Route 19
4fE(10'-0)
Pf
Pe
Pv
MS 4.0260 848.06 21.37 0.190770 126'-4¾ 42.799
3002 31'-3 24.146 97'-11½ 12.682
3001 2'-0 79.627 224'-4¼
2fT(16'-0), 5fE(6'-9½), CV(10'-0)
, GV(2'-0), PO(20'-0)
Pf
Pe
Pv
MS 6.0650 848.06 9.42 0.025933 4'-7¾ 1.495
3001 2'-0 79.627 53'-0 0.488
2 0'-10½ 81.610 57'-7¾
2LtE(9'-0), sCV(32'-0), GV(3'-0)
© M.E.P.CAD, Inc. 11/2/2018 Page 9AutoSPRINK 2018 v14.1.4.0 12:14:33PM
Upstream Total Length
HWC
Hydraulic Analysis Job Number: OC1242
Report Description: Ordinary Group II
Pf
Pe
Pv
UG 8.3900 848.06 4.92 0.004015 471'-9½ 2.657
2 0'-10½ 81.610 190'-0 0.813
1 -1'-0 85.080 661'-9½
5E(30'-6½), GV(6'-9½), 2EE(15'-
3¼), S
1098.06
250.00 Hose Allowance At Source
• • • • • Route 2 • • • • •
Pf
Pe
Pv
DR 1.0490 23.96 8.89 0.181737 2'-5¾ 2.087
309 9'-6¼ 23.96 8 8.968 9'-0 -0.281
3010 10'-2 10.774 11'-5¾
Sprinkler, 2E(2'-0), PO(5'-0)
• • • • • Route 3 • • • • •
Pf
Pe
Pv
AO 1.0490 22.11 8.21 0.156673 6'-5¾ 2.113
308 11'-9 22.11 8 7.639 7'-0 0.687
3008 10'-2 10.439 13'-5¾
Sprinkler, E(2'-0), PO(5'-0)
• • • • • Route 4 • • • • •
Pf
Pe
Pv
DR 1.0490 24.98 9.27 0.196345 2'-5¾ 2.254
312 9'-6¼ 24.98 8 9.750 9'-0 -0.281
3014 10'-2 11.723 11'-5¾
Sprinkler, 2E(2'-0), PO(5'-0)
Pf
Pe
Pv
BL 1.6100 24.98 3.94 0.024376 8'-0 0.195
3014 10'-2 11.723
3013 10'-2 11.918 8'-0
Pf
Pe
Pv
BL 1.6100 50.16 7.91 0.088542 6'-6½ 1.288
3013 10'-2 25.18 11.918 8'-0
3015 10'-2 13.206 14'-6½
Flow (q) from Route 5
PO(8'-0)
• • • • • Route 5 • • • • •
Pf
Pe
Pv
DR 1.0490 25.18 9.35 0.199336 2'-5¾ 2.289
313 9'-6¼ 25.18 8 9.911 9'-0 -0.281
3013 10'-2 11.918 11'-5¾
Sprinkler, 2E(2'-0), PO(5'-0)
• • • • • Route 6 • • • • •
Pf
Pe
Pv
DR 1.0490 25.22 9.36 0.199837 2'-5¾ 2.294
315 9'-6¼ 25.22 8 9.938 9'-0 -0.281
3018 10'-2 11.951 11'-5¾
Sprinkler, 2E(2'-0), PO(5'-0)
Pf
Pe
Pv
BL 1.6100 25.22 3.97 0.024809 8'-0 0.198
3018 10'-2 11.951
3019 10'-2 12.149 8'-0
Pf
Pe
Pv
BL 1.6100 50.64 7.98 0.090116 6'-6½ 1.310
3019 10'-2 25.43 12.149 8'-0
3020 10'-2 13.460 14'-6½
Flow (q) from Route 7
PO(8'-0)
• • • • • Route 7 • • • • •
Pf
Pe
Pv
DR 1.0490 25.43 9.44 0.202878 2'-5¾ 2.329
316 9'-6¼ 25.43 8 10.101 9'-0 -0.281
3019 10'-2 12.149 11'-5¾
Sprinkler, 2E(2'-0), PO(5'-0)
• • • • • Route 8 • • • • •
Pf
Pe
Pv
DR 1.0490 25.71 9.55 0.207136 2'-5¾ 2.378
318 9'-6¼ 25.71 8 10.331 9'-0 -0.281
3023 10'-2 12.428 11'-5¾
Sprinkler, 2E(2'-0), PO(5'-0)
Pf
Pe
Pv
BL 1.6100 25.71 4.05 0.025715 8'-0 0.206
3023 10'-2 12.428
3024 10'-2 12.633 8'-0
Pf
Pe
Pv
BL 1.6100 51.64 8.14 0.093406 6'-6½ 1.358
3024 10'-2 25.92 12.633 8'-0
3025 10'-2 13.992 14'-6½
Flow (q) from Route 9
PO(8'-0)
• • • • • Route 9 • • • • •
Pf
Pe
Pv
DR 1.0490 25.92 9.62 0.210280 2'-5¾ 2.414
319 9'-6¼ 25.92 8 10.500 9'-0 -0.281
3024 10'-2 12.633 11'-5¾
Sprinkler, 2E(2'-0), PO(5'-0)
• • • • • Route 10 • • • • •
Pf
Pe
Pv
DR 1.0490 26.33 9.77 0.216443 2'-11¼ 2.584
311 9'-6¼ 26.33 8 10.833 9'-0 -0.281
3012 10'-2 13.136 11'-11¼
Sprinkler, 2E(2'-0), PO(5'-0)
• • • • • Route 11 • • • • •
Pf
Pe
Pv
DR 1.0490 26.42 9.81 0.217850 2'-11¼ 2.601
314 9'-6¼ 26.42 8 10.909 9'-0 -0.281
3017 10'-2 13.229 11'-11¼
Sprinkler, 2E(2'-0), PO(5'-0)
• • • • • Route 12 • • • • •
© M.E.P.CAD, Inc. 11/2/2018 Page 10AutoSPRINK 2018 v14.1.4.0 12:14:33PM
Upstream Total Length
HWC
Hydraulic Analysis Job Number: OC1242
Report Description: Ordinary Group II
Pf
Pe
Pv
DR 1.0490 26.54 9.85 0.219574 2'-5¾ 2.521
322 9'-6¼ 26.54 8 11.003 9'-0 -0.281
3027 10'-2 13.243 11'-5¾
Sprinkler, 2E(2'-0), PO(5'-0)
Pf
Pe
Pv
BL 1.6100 26.54 4.18 0.027259 8'-0 0.218
3027 10'-2 13.243
3028 10'-2 13.461 8'-0
Pf
Pe
Pv
BL 1.6100 53.29 8.40 0.099011 6'-6½ 1.440
3028 10'-2 26.75 13.461 8'-0
3029 10'-2 14.901 14'-6½
Flow (q) from Route 14
PO(8'-0)
• • • • • Route 13 • • • • •
Pf
Pe
Pv
DR 1.0490 26.70 9.91 0.222162 2'-11¼ 2.653
317 9'-6¼ 26.70 8 11.143 9'-0 -0.281
3021 10'-2 13.514 11'-11¼
Sprinkler, 2E(2'-0), PO(5'-0)
• • • • • Route 14 • • • • •
Pf
Pe
Pv
DR 1.0490 26.75 9.93 0.222893 2'-5¾ 2.559
321 9'-6¼ 26.75 8 11.183 9'-0 -0.281
3028 10'-2 13.461 11'-5¾
Sprinkler, 2E(2'-0), PO(5'-0)
• • • • • Route 15 • • • • •
Pf
Pe
Pv
DR 1.0490 27.26 10.12 0.230845 2'-11¼ 2.756
320 9'-6¼ 27.26 8 11.615 9'-0 -0.281
3026 10'-2 14.090 11'-11¼
Sprinkler, 2E(2'-0), PO(5'-0)
• • • • • Route 16 • • • • •
Pf
Pe
Pv
BL 2.0670 27.48 2.63 0.008610 7'-0 0.060
325 38'-8½ 27.48 8 11.795 -0.010
327 38'-9 11.846 7'-0
Sprinkler
Pf
Pe
Pv
BL 2.0670 55.01 5.26 0.031099 7'-0 0.218
327 38'-9 27.53 8 11.846 -0.010
328 38'-9¼ 12.053 7'-0
Sprinkler
Pf
Pe
Pv
BL 2.0670 82.78 7.92 0.066243 5'-4¼ 1.017
328 38'-9¼ 27.77 8 12.053 10'-0 -0.010
3037 38'-9½ 13.061 15'-4¼
Sprinkler, PO(10'-0)
Pf
Pe
Pv
BL 6.0650 37.72 0.42 0.000082 12'-8½ 0.001
3037 38'-9½ 13.061 1.337
3036 35'-8½ 14.399 12'-8½
2Z
Pf
Pe
Pv
BL 6.0650 154.88 1.72 0.001116 34'-10¼ 0.117
3036 35'-8½ 86.94 + 30.23 14.399 70'-0 1.532
3035 32'-2 16.048 104'-10¼
Flow (q) from Route 18 and 23
2fE(10'-0), 2fT(25'-0)
• • • • • Route 17 • • • • •
Pf
Pe
Pv
AO 1.0490 25.40 9.43 0.202474 4'-6½ 2.338
307 11'-10 25.40 8 10.079 7'-0 0.720
3007 10'-2 13.138 11'-6½
Sprinkler, E(2'-0), PO(5'-0)
Pf
Pe
Pv
FM 1.6100 37.46 5.90 0.051580 57'-0¾ 4.181
3007 10'-2 12.06 13.138 24'-0 -0.004
3030 10'-2 17.315 81'-0¾
Flow (q) from Route 29
2T(8'-0), 4LtE(2'-0)
• • • • • Route 18 • • • • •
Pf
Pe
Pv
BL 2.0670 28.85 2.76 0.009426 7'-0 0.066
324 35'-7¾ 28.85 8 13.008 -0.010
326 35'-8 13.064 7'-0
Sprinkler
Pf
Pe
Pv
BL 2.0670 57.77 5.52 0.034047 7'-0 0.238
326 35'-8 28.92 8 13.064 -0.010
329 35'-8¼ 13.293 7'-0
Sprinkler
Pf
Pe
Pv
BL 2.0670 86.94 8.31 0.072522 5'-4¼ 1.113
329 35'-8¼ 29.17 8 13.293 10'-0 -0.007
3036 35'-8½ 14.399 15'-4¼
Sprinkler, PO(10'-0), 2Z
• • • • • Route 19 • • • • •
Pf
Pe
Pv
BL 2.0670 28.94 2.77 0.009477 9'-0 0.085
306 38'-6½ 28.94 8 13.084 0.013
303 38'-6¼ 13.183 9'-0
Sprinkler
Pf
Pe
Pv
BL 2.0670 57.98 5.54 0.034282 7'-0 0.583
303 38'-6¼ 29.05 8 13.183 10'-0 0.010
3005 38'-6 13.775 17'-0
Sprinkler, PO(10'-0)
Pf
Pe
Pv
BL 6.0650 161.41 1.79 0.001205 12'-8½ 0.015
3005 38'-6 73.85 + 29.57 13.775 1.336
3004 35'-5 15.126 12'-8½
Flow (q) from Route 20 and 21
Pf
Pe
Pv
BL 6.0650 253.16 2.81 0.002770 111'-10½ 0.462
3004 35'-5 60.77 + 30.98 15.126 55'-0 1.411
3003 32'-2 16.999 166'-10½
Flow (q) from Route 22 and 24
3fE(10'-0), fT(25'-0)
• • • • • Route 20 • • • • •
© M.E.P.CAD, Inc. 11/2/2018 Page 11AutoSPRINK 2018 v14.1.4.0 12:14:33PM
Upstream Total Length
HWC
Hydraulic Analysis Job Number: OC1242
Report Description: Ordinary Group II
Pf
Pe
Pv
BL 2.0670 28.79 2.75 0.009387 1'-7¾ 0.109
331 38'-9½ 28.79 8 12.951 10'-0 0.000
3037 38'-9½ 13.061 11'-7¾
Sprinkler, PO(10'-0)
Pf
Pe
Pv
BL 6.0650 73.85 0.82 0.000284 25'-11¼ 0.020
3037 38'-9½ 37.72 13.061 45'-0 -5.295
3042 51'-0 7.785 70'-11¼
Flow (q) from Route 16 fT(25'-0), 2fE(10'-0)
Pf
Pe
Pv
CM 6.0650 55.10 0.61 0.000165 13'-0 0.002
3042 51'-0 7.785
3043 51'-0 7.787 13'-0
Pf
Pe
Pv
CM 6.0650 36.90 0.41 0.000079 13'-0 0.001
3043 51'-0 7.787
3048 51'-0 7.788 13'-0
Pf
Pe
Pv
CM 6.0650 18.69 0.21 0.000022 13'-0 0.000
3048 51'-0 7.788
3055 51'-0 7.789 13'-0
Pf
Pe
Pv
RN 2.0670 18.69 1.79 0.004222 92'-8 0.547
3055 51'-0 7.789 37'-0
3031 51'-0 8.336 129'-8
PO(10'-0)
2fT(8'-6), PO(10'-0)
Pf
Pe
Pv
CM 6.0650 18.69 0.21 0.000022 13'-0 0.000
3031 51'-0 8.336
3022 51'-0 8.336 13'-0
Pf
Pe
Pv
CM 6.0650 36.90 0.41 0.000079 13'-0 0.001
3022 51'-0 18.21 8.336
3016 51'-0 8.337 13'-0
Flow (q) from Route 26
Pf
Pe
Pv
CM 6.0650 55.10 0.61 0.000165 13'-0 0.002
3016 51'-0 18.19 8.337
3006 51'-0 8.340 13'-0
Flow (q) from Route 27
Pf
Pe
Pv
CM 6.0650 73.85 0.82 0.000284 25'-0 0.016
3006 51'-0 18.76 8.340 30'-0 5.420
3005 38'-6 13.775 55'-0
Flow (q) from Route 28
3fE(10'-0)
• • • • • Route 21 • • • • •
Pf
Pe
Pv
BL 2.0670 29.57 2.83 0.009862 2'-0 0.118
304 38'-6 29.57 8 13.660 10'-0 -0.003
3005 38'-6 13.775 12'-0
Sprinkler, PO(10'-0)
• • • • • Route 22 • • • • •
Pf
Pe
Pv
BL 2.0670 30.33 2.90 0.010337 9'-0 0.093
305 35'-5¾ 30.33 8 14.374 0.014
302 35'-5¼ 14.480 9'-0
Sprinkler
Pf
Pe
Pv
BL 2.0670 60.77 5.81 0.037394 7'-0 0.636
302 35'-5¼ 30.44 8 14.480 10'-0 0.011
3004 35'-5 15.126 17'-0
Sprinkler, PO(10'-0)
• • • • • Route 23 • • • • •
Pf
Pe
Pv
BL 2.0670 30.23 2.89 0.010273 1'-7¾ 0.120
330 35'-8½ 30.23 8 14.277 10'-0 0.003
3036 35'-8½ 14.399 11'-7¾
Sprinkler, PO(10'-0), 2Z
• • • • • Route 24 • • • • •
Pf
Pe
Pv
BL 2.0670 30.98 2.96 0.010754 2'-0 0.129
301 35'-5 30.98 8 15.000 10'-0 -0.003
3004 35'-5 15.126 12'-0
Sprinkler, PO(10'-0)
• • • • • Route 25 • • • • •
Pf
Pe
Pv
DR 1.0490 32.59 12.10 0.321173 2'-11¼ 3.835
323 9'-6¼ 32.59 8 16.598 9'-0 -0.281
3032 10'-2 20.151 11'-11¼
Sprinkler, 2E(2'-0), PO(5'-0)
• • • • • Route 26 • • • • •
Pf
Pe
Pv
RN 2.0670 18.21 1.74 0.004024 99'-2¼ 0.548
3048 51'-0 7.788 37'-0 0.000
3022 51'-0 8.336 136'-2¼
PO(10'-0)
2fT(8'-6), PO(10'-0)
• • • • • Route 27 • • • • •
Pf
Pe
Pv
RN 2.0670 18.19 1.74 0.004016 99'-11¾ 0.550
3043 51'-0 7.787 37'-0 -0.000
3016 51'-0 8.337 136'-11¾
PO(10'-0)
2fT(8'-6), PO(10'-0)
• • • • • Route 28 • • • • •
Pf
Pe
Pv
RN 2.0670 18.76 1.79 0.004249 93'-5½ 0.554
3042 51'-0 7.785 37'-0
3006 51'-0 8.340 130'-5½
PO(10'-0)
2fT(8'-6), PO(10'-0)
• • • • • Route 29 • • • • •
© M.E.P.CAD, Inc. 11/2/2018 Page 12AutoSPRINK 2018 v14.1.4.0 12:14:33PM
Upstream Total Length
HWC
Hydraulic Analysis Job Number: OC1242
Report Description: Ordinary Group II
Pf
Pe
Pv
CM 3.0680 12.06 0.52 0.000274 2'-0¼ 0.005
3011 10'-2 57.51 13.131 15'-0 0.002
3007 10'-2 13.138 17'-0¼
Flow (q) from Route 1
PO(15'-0)
1.51
Pipe Type Legend
AO Arm-Over
BL Branch Line
CM Cross Main
DN Drain
DR Drop
DY Dynamic
FM Feed Main
FR Feed Riser
MS Miscellaneous
OR Outrigger
RN Riser Nipple
SP Sprig
ST Stand Pipe
UG Underground
Units Legend
Diameter Inch
Elevation Foot
Flow gpm
Discharge gpm
Velocity fps
Pressure psi
Length Foot
Friction Loss psi/Foot
HWC Hazen-Williams Constant
Pt Total pressure at a point in a pipe
Pn Normal pressure at a point in a pipe
Pf Pressure loss due to friction between points
Pe Pressure due to elevation difference between indicated points
Pv Velocity pressure at a point in a pipe
Fittings Legend
ALV Alarm Valve
AngV Angle Valve b Bushing
BalV Ball Valve
BFP Backflow Preventer
BV Butterfly Valve
C Cross Flow Turn 90° cplg Coupling
Cr Cross Run
CV Check Valve
DelV Deluge Valve
DPV Dry Pipe Valve
E 90° Elbow
EE 45° Elbow
Ee1 11¼° Elbow
Ee2 22½° Elbow f Flow Device fd Flex Drop
FDC Fire Department Connection fE 90° FireLock(TM) Elbow fEE 45° FireLock(TM) Elbow flg Flange
FN Floating Node fT FireLock(TM) Tee g Gauge
GloV Globe Valve
GV Gate Valve
Ho Hose
Hose Hose
HV Hose Valve
Hyd Hydrant
LtE Long Turn Elbow mecT Mechanical Tee
Noz Nozzle
P1 Pump In
P2 Pump Out
PIV Post Indicating Valve
PO Pipe Outlet
PrV Pressure Relief Valve
PRV Pressure Reducing Valve red Reducer/Adapter
S Supply sCV Swing Check Valve
SFx Seismic Flex
Spr Sprinkler
St Strainer
T Tee Flow Turn 90°
Tr Tee Run
U Union
WirF Wirsbo
WMV Water Meter Valve
Z Cap
4.87
)( 150
1.33
1.16
0.713
Equivalent Pipe Lengths of Valves and Fittings (C=120 only)
Actual Inside Diameter
Schedule 40 Steel Pipe Inside Diameter = Factor
C Value Multiplier
Value Of C
Multiplying Factor
© M.E.P.CAD, Inc. 11/2/2018 Page 13AutoSPRINK 2018 v14.1.4.0 12:14:33PM
Report Description: Light Hazard
Node Flow(gpm) Hose Flow(gpm) Static(psi) Residual(psi)Name
1 1105.02 250.00 120.000 96.000Water Supply
Identifier Pressure(psi) K-Factor(K) Flow(gpm)
Job
System
Supplies Check Point Gauges
OC1242 VUOCHLIN VEUNG
ALTUS KC-46A SIMULATOR FACILITY PHASE 2
ALTUS AIR FORCE BASE
OKLAHOMA
4058356904
Altus KC46A - 1st Floor - FS101.cad
ALTUS AIR FORCE FIRE MARSHAL
KC-46A PHASE 2/1ST FLOOR
Job Name:
Address 1
Address 2
Design Engineer
Phone FAX
State Certification/License Number
AHJ
Job Site/Building
Most Demanding Sprinkler Data
Coverage Per Sprinkler
Total Demand
Area of Application
Hose Streams
Number Of Sprinklers Calculated
Pressure Result
Job Number
527.32 @ 97.359
Water Supply at Node 1 (1105.02, 250.00, 120.000, 96.000)
0.100gpm/ft²
5.6 K-Factor 22.50 at 16.143
225.00ft²
1500.00ft² (Actual 1537.59ft²)
Density
+16.534 (14.5%)
Address 3
System Pressure Demand System Flow Demand
97.359 277.32
250.00
© M.E.P.CAD, Inc. 11/2/2018 Page 1AutoSPRINK 2018 v14.1.4.0 12:15:30PM
- 1B
Job Number: OC1242
Node Flow(gpm)
Total Hose Streams
250.00
Safety MarginRequiredAvailable
Node
Hose Flow Static Residual Flow Total Demand
(gpm) (psi) (psi) (gpm) (psi) (gpm) (psi) (psi)@@Name
1 113.893 97.359 16.5341105.02250.00 96.000120.000 527.32Water Supply
Design EngineerJob Number
Total Water Required (Including Hose Allowance)
527.32
Maximum Pressure Unbalance In Loops
0.000
Additional Hose Supplies
250.00
Hose Allowance At Source
Supplies
5233.88gal
Light Hazard
0.100gpm/ft²
225.00ft²
1500.00ft² (Actual 1537.59ft²)
Occupancy
Area of Application
Coverage Per SprinklerNumber Of Sprinklers Calculated
Density
Job Suffix
AutoPeak Results: Pressure For Remote Area(s) Adjacent To Most Remote Area
Volume capacity of Dry PipesVolume capacity of Wet Pipes
1.61 between nodes 1 and 2 Maximum Velocity Under Ground
18.58 between nodes 1001 and 1003 Maximum Velocity Above Ground
5.6 K-Factor 22.50 at 16.143
Most Demanding Sprinkler Data
System
KC-46A PHASE 2/1ST FLOOROKLAHOMA
Job Site/Building
ALTUS AIR FORCE FIRE MARSHALALTUS AIR FORCE BASE
AHJ
790ALTUS KC-46A SIMULATOR FACILITY PHASE 2
Job
State Certification/License NumberJob Name:
VUOCHLIN VEUNGOC1242
Contractor
Contractor Number
OC1242
Name of Contractor:
SGS, LLC
Address 1
4400 SW 15TH STREET
Address 2
OKLAHOMA CITY, OK 73108
Contact Name Contact Title
ExtensionPhone
FAX
Web-SiteAddress 3
Address 1
Address 2
Drawing Name
Altus KC46A - 1st Floor - FS101.cad
System Flow Demand
277.32
Remote Area(s)
Address 3
11/2/2018© M.E.P.CAD, Inc. Page 2AutoSPRINK 2018 v14.1.4.0 12:15:36PM
Job Number: OC1242
96.000 @ 1105.02
Residual: Pressure
120.000
Static: Pressure
Water Supply at Node 1
Hydraulic Graph
Water Supply at Node 1
97.359 @ 277.32
97.359 @ 527.32
Available Pressure at Time of Test
113.893 @ 527.32
System Demand
System Demand (Including Hose Allowance at Source)
© M.E.P.CAD, Inc. 11/2/2018 Page 3AutoSPRINK 2018 v14.1.4.0 12:15:40PM
(gpm) (K)
K-Factor
(psi)
Pressure
Summary Of Outflowing Devices Report Description: Light Hazard
Job Number: OC1242
Sprinkler 101 23.96 22.50 5.6 18.301
Sprinkler 102 23.59 22.50 5.6 17.747
Sprinkler 103 23.57 22.50 5.6 17.713
Sprinkler 104 23.21 22.50 5.6 17.176
Sprinkler 105 23.26 22.50 5.6 17.254
Sprinkler 106 22.88 22.50 5.6 16.698
Sprinkler 107 23.12 22.50 5.6 17.042
Sprinkler 108 22.74 22.50 5.6 16.491
Sprinkler 109 23.03 22.50 5.6 16.906
Sprinkler 110 22.65 22.50 5.6 16.360
Sprinkler 111 22.82 22.50 5.6 16.605
Sprinkler 112 22.50 22.50 5.6 16.143
Most Demanding Sprinkler Data
© M.E.P.CAD, Inc. 11/2/2018 Page 6AutoSPRINK 2018 v14.1.4.0 12:15:44PM
Report Description: Light Hazard
Job Number: OC1242
1 -1'-0 S 97.359 277.32
101 9'-6¼ Spr(-18.301) 18.301 23.96
102 9'-6¼ Spr(-17.747) 17.747 23.59
103 9'-6¼ Spr(-17.713) 17.713 23.57
104 9'-6¼ Spr(-17.176) 17.176 23.21
105 9'-6¼ Spr(-17.254) 17.254 23.26
106 9'-6¼ Spr(-16.698) 16.698 22.88
107 9'-6¼ Spr(-17.042) 17.042 23.12
108 9'-6¼ Spr(-16.491) 16.491 22.74
109 9'-6¼ Spr(-16.906) 16.906 23.03
110 9'-6¼ Spr(-16.360) 16.360 22.65
111 9'-6¼ Spr(-16.605) 16.605 22.82
112 9'-6¼ Spr(-16.143) 16.143 22.50
2 0'-10½ 96.210
1001 6'-1¾ 92.877
1002 2'-0 PO(20'-0) 95.520
1003 10'-0 25.406
1004 10'-0 PO(6'-0) 21.891
1005 10'-0 PO(5'-0) 20.149
1006 10'-0 PO(5'-0) 19.538
1007 10'-0 PO(6'-0) 21.230
1008 10'-0 PO(5'-0) 19.500
1009 10'-0 PO(5'-0) 18.907
1010 10'-0 PO(6'-0) 20.642
1011 10'-0 PO(5'-0) 18.993
1012 10'-0 PO(5'-0) 18.378
1013 10'-0 PO(5'-0) 18.758
1014 10'-0 PO(6'-0) 20.389
1015 10'-0 PO(5'-0) 18.151
1016 10'-0 PO(6'-0) 20.227
1017 10'-0 PO(5'-0) 18.609
1018 10'-0 PO(5'-0) 18.006
1019 10'-0 PO(6'-0) 20.184
1020 10'-0 PO(5'-0) 18.277
1021 10'-0 PO(5'-0) 17.766
© M.E.P.CAD, Inc. 11/2/2018 Page 7AutoSPRINK 2018 v14.1.4.0 12:15:47PM
Upstream Total Length
HWC
Hydraulic Analysis Job Number: OC1242
Report Description: Light Hazard
• • • • • Route 1 • • • • •
Pf
Pe
Pv
DR 1.0490 22.50 8.35 0.161813 2'-3¾ 1.831
112 9'-6¼ 22.50 5.6 16.143 9'-0 -0.208
1021 10'-0 17.766 11'-3¾
Sprinkler, 2E(2'-0), PO(5'-0)
Pf
Pe
Pv
CM 1.3800 22.50 4.83 0.042558 12'-0 0.511
1021 10'-0 17.766
1020 10'-0 18.277 12'-0
Pf
Pe
Pv
CM 1.3800 45.32 9.72 0.155445 6'-3¼ 1.907
1020 10'-0 22.82 18.277 6'-0
1019 10'-0 20.184 12'-3¼
Flow (q) from Route 4
PO(6'-0)
Pf
Pe
Pv
CM 3.0680 45.32 1.97 0.003175 13'-6¾ 0.043
1019 10'-0 20.184
1016 10'-0 20.227 13'-6¾
Pf
Pe
Pv
CM 3.0680 91.00 3.95 0.011531 14'-0 0.161
1016 10'-0 45.68 20.227
1014 10'-0 20.389 14'-0
Flow (q) from Route 2
Pf
Pe
Pv
CM 3.0680 136.86 5.94 0.024533 10'-4 0.254
1014 10'-0 45.86 20.389
1010 10'-0 20.642 10'-4
Flow (q) from Route 3
Pf
Pe
Pv
CM 3.0680 183.00 7.94 0.041995 14'-0 0.588
1010 10'-0 46.14 20.642
1007 10'-0 21.230 14'-0
Flow (q) from Route 5
Pf
Pe
Pv
CM 3.0680 229.80 9.97 0.063997 10'-3¾ 0.660
1007 10'-0 46.80 21.230
1004 10'-0 21.891 10'-3¾
Flow (q) from Route 8
Pf
Pe
Pv
CM 3.0680 277.32 12.04 0.090614 28'-9½ 3.515
1004 10'-0 47.53 21.891 10'-0
1003 10'-0 25.406 38'-9½
Flow (q) from Route 10
2LtE(5'-0)
Pf
Pe
Pv
FR 2.4690 277.32 18.58 0.260978 236'-1½ 65.799
1003 10'-0 25.406 16'-0 1.673
1001 6'-1¾ 92.877 252'-1½
4LtE(4'-0)
Pf
Pe
Pv
MS 4.0260 277.32 6.99 0.024124 2'-11¾ 0.844
1001 6'-1¾ 92.877 32'-0 1.799
1002 2'-0 95.520 34'-11¾
CV(10'-0), GV(2'-0), PO(20'-0)
Pf
Pe
Pv
MS 6.0650 277.32 3.08 0.003279 8'-7¾ 0.202
1002 2'-0 95.520 53'-0 0.488
2 0'-10½ 96.210 61'-7¾
2LtE(9'-0), sCV(32'-0), GV(3'-0)
Pf
Pe
Pv
UG 8.3900 277.32 1.61 0.000508 471'-9½ 0.336
2 0'-10½ 96.210 190'-0 0.813
1 -1'-0 97.359 661'-9½
5E(30'-6½), GV(6'-9½), 2EE(15'-
3¼), S
527.32
250.00 Hose Allowance At Source
• • • • • Route 2 • • • • •
Pf
Pe
Pv
DR 1.0490 22.65 8.41 0.163824 2'-3¾ 1.853
110 9'-6¼ 22.65 5.6 16.360 9'-0 -0.208
1018 10'-0 18.006 11'-3¾
Sprinkler, 2E(2'-0), PO(5'-0)
Pf
Pe
Pv
CM 1.3800 22.65 4.86 0.043087 14'-0 0.603
1018 10'-0 18.006
1017 10'-0 18.609 14'-0
Pf
Pe
Pv
CM 1.3800 45.68 9.80 0.157714 4'-3 1.618
1017 10'-0 23.03 18.609 6'-0
1016 10'-0 20.227 10'-3
Flow (q) from Route 6
PO(6'-0)
• • • • • Route 3 • • • • •
Pf
Pe
Pv
DR 1.0490 22.74 8.44 0.165039 2'-3¾ 1.867
108 9'-6¼ 22.74 5.6 16.491 9'-0 -0.208
1015 10'-0 18.151 11'-3¾
Sprinkler, 2E(2'-0), PO(5'-0)
Pf
Pe
Pv
CM 1.3800 22.74 4.88 0.043406 14'-0 0.608
1015 10'-0 18.151
1013 10'-0 18.758 14'-0
Pf
Pe
Pv
CM 1.3800 45.86 9.84 0.158883 4'-3 1.630
1013 10'-0 23.12 18.758 6'-0
1014 10'-0 20.389 10'-3
Flow (q) from Route 7
PO(6'-0)
• • • • • Route 4 • • • • •
Pf
Pe
Pv
DR 1.0490 22.82 8.47 0.166095 2'-3¾ 1.879
111 9'-6¼ 22.82 5.6 16.605 9'-0 -0.208
1020 10'-0 18.277 11'-3¾
Sprinkler, 2E(2'-0), PO(5'-0)
© M.E.P.CAD, Inc. 11/2/2018 Page 8AutoSPRINK 2018 v14.1.4.0 12:15:51PM
Upstream Total Length
HWC
Hydraulic Analysis Job Number: OC1242
Report Description: Light Hazard
• • • • • Route 5 • • • • •
Pf
Pe
Pv
DR 1.0490 22.88 8.49 0.166947 2'-3¾ 1.889
106 9'-6¼ 22.88 5.6 16.698 9'-0 -0.208
1012 10'-0 18.378 11'-3¾
Sprinkler, 2E(2'-0), PO(5'-0)
Pf
Pe
Pv
CM 1.3800 22.88 4.91 0.043908 14'-0 0.615
1012 10'-0 18.378
1011 10'-0 18.993 14'-0
Pf
Pe
Pv
CM 1.3800 46.14 9.90 0.160717 4'-3 1.649
1011 10'-0 23.26 18.993 6'-0
1010 10'-0 20.642 10'-3
Flow (q) from Route 9
PO(6'-0)
• • • • • Route 6 • • • • •
Pf
Pe
Pv
DR 1.0490 23.03 8.55 0.168876 2'-3¾ 1.910
109 9'-6¼ 23.03 5.6 16.906 9'-0 -0.208
1017 10'-0 18.609 11'-3¾
Sprinkler, 2E(2'-0), PO(5'-0)
• • • • • Route 7 • • • • •
Pf
Pe
Pv
DR 1.0490 23.12 8.58 0.170126 2'-3¾ 1.925
107 9'-6¼ 23.12 5.6 17.042 9'-0 -0.208
1013 10'-0 18.758 11'-3¾
Sprinkler, 2E(2'-0), PO(5'-0)
• • • • • Route 8 • • • • •
Pf
Pe
Pv
DR 1.0490 23.21 8.62 0.171364 2'-3¾ 1.939
104 9'-6¼ 23.21 5.6 17.176 9'-0 -0.208
1009 10'-0 18.907 11'-3¾
Sprinkler, 2E(2'-0), PO(5'-0)
Pf
Pe
Pv
CM 1.3800 23.21 4.98 0.045070 14'-0 0.631
1009 10'-0 18.907
1006 10'-0 19.538 14'-0
Pf
Pe
Pv
CM 1.3800 46.80 10.04 0.164965 4'-3 1.693
1006 10'-0 23.59 19.538 6'-0
1007 10'-0 21.230 10'-3
Flow (q) from Route 11
PO(6'-0)
• • • • • Route 9 • • • • •
Pf
Pe
Pv
DR 1.0490 23.26 8.64 0.172088 2'-3¾ 1.947
105 9'-6¼ 23.26 5.6 17.254 9'-0 -0.208
1011 10'-0 18.993 11'-3¾
Sprinkler, 2E(2'-0), PO(5'-0)
• • • • • Route 10 • • • • •
Pf
Pe
Pv
DR 1.0490 23.57 8.75 0.176318 2'-3¾ 1.995
103 9'-6¼ 23.57 5.6 17.713 9'-0 -0.208
1008 10'-0 19.500 11'-3¾
Sprinkler, 2E(2'-0), PO(5'-0)
Pf
Pe
Pv
CM 1.3800 23.57 5.06 0.046373 14'-0 0.649
1008 10'-0 19.500
1005 10'-0 20.149 14'-0
Pf
Pe
Pv
CM 1.3800 47.53 10.19 0.169728 4'-3 1.741
1005 10'-0 23.96 20.149 6'-0
1004 10'-0 21.891 10'-3
Flow (q) from Route 12
PO(6'-0)
• • • • • Route 11 • • • • •
Pf
Pe
Pv
DR 1.0490 23.59 8.76 0.176631 2'-3¾ 1.998
102 9'-6¼ 23.59 5.6 17.747 9'-0 -0.208
1006 10'-0 19.538 11'-3¾
Sprinkler, 2E(2'-0), PO(5'-0)
• • • • • Route 12 • • • • •
Pf
Pe
Pv
DR 1.0490 23.96 8.89 0.181725 2'-3¾ 2.056
101 9'-6¼ 23.96 5.6 18.301 9'-0 -0.208
1005 10'-0 20.149 11'-3¾
Sprinkler, 2E(2'-0), PO(5'-0)
1.51
4.87
)( 150
1.33
1.16
0.713
Equivalent Pipe Lengths of Valves and Fittings (C=120 only)
Actual Inside Diameter
Schedule 40 Steel Pipe Inside Diameter = Factor
C Value Multiplier
Value Of C
Multiplying Factor
© M.E.P.CAD, Inc. 11/2/2018 Page 9AutoSPRINK 2018 v14.1.4.0 12:15:51PM
Upstream Total Length
HWC
Hydraulic Analysis Job Number: OC1242
Report Description: Light Hazard
Pipe Type Legend
AO Arm-Over
BL Branch Line
CM Cross Main
DN Drain
DR Drop
DY Dynamic
FM Feed Main
FR Feed Riser
MS Miscellaneous
OR Outrigger
RN Riser Nipple
SP Sprig
ST Stand Pipe
UG Underground
Units Legend
Diameter Inch
Elevation Foot
Flow gpm
Discharge gpm
Velocity fps
Pressure psi
Length Foot
Friction Loss psi/Foot
HWC Hazen-Williams Constant
Pt Total pressure at a point in a pipe
Pn Normal pressure at a point in a pipe
Pf Pressure loss due to friction between points
Pe Pressure due to elevation difference between indicated points
Pv Velocity pressure at a point in a pipe
Fittings Legend
ALV Alarm Valve
AngV Angle Valve b Bushing
BalV Ball Valve
BFP Backflow Preventer
BV Butterfly Valve
C Cross Flow Turn 90° cplg Coupling
Cr Cross Run
CV Check Valve
DelV Deluge Valve
DPV Dry Pipe Valve
E 90° Elbow
EE 45° Elbow
Ee1 11¼° Elbow
Ee2 22½° Elbow f Flow Device fd Flex Drop
FDC Fire Department Connection fE 90° FireLock(TM) Elbow fEE 45° FireLock(TM) Elbow flg Flange
FN Floating Node fT FireLock(TM) Tee g Gauge
GloV Globe Valve
GV Gate Valve
Ho Hose
Hose Hose
HV Hose Valve
Hyd Hydrant
LtE Long Turn Elbow mecT Mechanical Tee
Noz Nozzle
P1 Pump In
P2 Pump Out
PIV Post Indicating Valve
PO Pipe Outlet
PrV Pressure Relief Valve
PRV Pressure Reducing Valve red Reducer/Adapter
S Supply sCV Swing Check Valve
SFx Seismic Flex
Spr Sprinkler
St Strainer
T Tee Flow Turn 90°
Tr Tee Run
U Union
WirF Wirsbo
WMV Water Meter Valve
Z Cap
© M.E.P.CAD, Inc. 11/2/2018 Page 10AutoSPRINK 2018 v14.1.4.0 12:15:51PM
Node Flow(gpm) Hose Flow(gpm) Static(psi) Residual(psi)Name
1 1105.02 250.00 120.000 96.000Water Supply
Identifier Pressure(psi) K-Factor(K) Flow(gpm)
Job
System
Supplies Check Point Gauges
OC1242 VUOCHLIN VEUNG
ALTUS KC-46A SIMULATOR FACILITY PHASE 2
ALTUS AIR FORCE BASE
OKLAHOMA
4058356904
Altus KC46A - 1st Floor - FS101.cad
ALTUS AIR FORCE FIRE MARSHAL
KC-46A PHASE 2/1ST FLOOR
Job Name:
Address 1
Address 2
Design Engineer
Phone FAX
State Certification/License Number
AHJ
Job Site/Building
Most Demanding Sprinkler Data
Coverage Per Sprinkler
Total Demand
Area of Application
Hose Streams
Number Of Sprinklers Calculated
Pressure Result
Job Number
508.56 @ 85.923
Water Supply at Node 1 (1105.02, 250.00, 120.000, 96.000)
0.100gpm/ft²
5.6 K-Factor 17.23 at 9.470
196.00ft²
1500.00ft² (Actual 1537.87ft²)
Density
+28.366 (24.8%)
Address 3
System Pressure Demand System Flow Demand
85.923 258.56
250.00
© M.E.P.CAD, Inc. 11/2/2018 Page 1AutoSPRINK 2018 v14.1.4.0 12:16:17PM
- 1C
Job Number: OC1242
Node Flow(gpm)
Total Hose Streams
250.00
Safety MarginRequiredAvailable
Node
Hose Flow Static Residual Flow Total Demand
(gpm) (psi) (psi) (gpm) (psi) (gpm) (psi) (psi)@@Name
1 114.289 85.923 28.3661105.02250.00 96.000120.000 508.56Water Supply
Design EngineerJob Number
Total Water Required (Including Hose Allowance)
508.56
Maximum Pressure Unbalance In Loops
0.000
Additional Hose Supplies
250.00
Hose Allowance At Source
Supplies
5233.88gal
Light Hazard
0.100gpm/ft²
196.00ft²
1500.00ft² (Actual 1537.87ft²)
Occupancy
Area of Application
Coverage Per SprinklerNumber Of Sprinklers Calculated
Density
Job Suffix
AutoPeak Results: Pressure For Remote Area(s) Adjacent To Most Remote Area
Volume capacity of Dry PipesVolume capacity of Wet Pipes
1.50 between nodes 1 and 2 Maximum Velocity Under Ground
17.33 between nodes 1001 and 1003 Maximum Velocity Above Ground
5.6 K-Factor 17.23 at 9.470
Most Demanding Sprinkler Data
System
KC-46A PHASE 2/1ST FLOOROKLAHOMA
Job Site/Building
ALTUS AIR FORCE FIRE MARSHALALTUS AIR FORCE BASE
AHJ
790ALTUS KC-46A SIMULATOR FACILITY PHASE 2
Job
State Certification/License NumberJob Name:
VUOCHLIN VEUNGOC1242
Contractor
Contractor Number
OC1242
Name of Contractor:
SGS, LLC
Address 1
4400 SW 15TH STREET
Address 2
OKLAHOMA CITY, OK 73108
Contact Name Contact Title
ExtensionPhone
FAX
Web-SiteAddress 3
Address 1
Address 2
Drawing Name
Altus KC46A - 1st Floor - FS101.cad
System Flow Demand
258.56
Remote Area(s)
Address 3
11/2/2018© M.E.P.CAD, Inc. Page 2AutoSPRINK 2018 v14.1.4.0 12:16:23PM
Job Number: OC1242
96.000 @ 1105.02
Residual: Pressure
120.000
Static: Pressure
Water Supply at Node 1
Hydraulic Graph
Water Supply at Node 1
85.923 @ 258.56
85.923 @ 508.56
Available Pressure at Time of Test
114.289 @ 508.56
System Demand
System Demand (Including Hose Allowance at Source)
© M.E.P.CAD, Inc. 11/2/2018 Page 3AutoSPRINK 2018 v14.1.4.0 12:16:27PM
(gpm) (K)
K-Factor
(psi)
Pressure
Summary Of Outflowing Devices Report Description: Light Hazard
Job Number: OC1242
Sprinkler 113 18.02 14.82 5.6 10.360
Sprinkler 114 17.78 17.23 5.6 10.086
Sprinkler 115 18.75 14.82 5.6 11.206
Sprinkler 116 17.38 17.23 5.6 9.630
Sprinkler 117 17.23 17.23 5.6 9.470
Sprinkler 118 18.23 14.82 5.6 10.597
Sprinkler 119 17.28 14.82 5.6 9.526
Sprinkler 120 18.37 14.82 5.6 10.763
Sprinkler 121 17.09 14.82 5.6 9.318
Sprinkler 122 16.63 15.01 5.6 8.814
Sprinkler 123 16.33 15.01 5.6 8.506
Sprinkler 124 16.14 14.82 5.6 8.311
Sprinkler 125 18.26 14.82 5.6 10.637
Sprinkler 126 15.66 15.01 5.6 7.821
Sprinkler 127 15.38 15.01 5.6 7.546
Most Demanding Sprinkler Data
© M.E.P.CAD, Inc. 11/2/2018 Page 6AutoSPRINK 2018 v14.1.4.0 12:16:31PM
Report Description: Light Hazard
Job Number: OC1242
1 -1'-0 S 85.923 258.56
113 9'-6¼ Spr(-10.360) 10.360 18.02
114 9'-6¼ Spr(-10.086) 10.086 17.78
115 8'-6¼ Spr(-11.206) 11.206 18.75
116 9'-6¼ Spr(-9.630) 9.630 17.38
117 9'-6¼ Spr(-9.470) 9.470 17.23
118 9'-6¼ Spr(-10.597) 10.597 18.23
119 9'-6¼ Spr(-9.526) 9.526 17.28
120 8'-6¼ Spr(-10.763) 10.763 18.37
121 9'-6¼ Spr(-9.318) 9.318 17.09
122 9'-6¼ Spr(-8.814) 8.814 16.63
123 9'-6¼ Spr(-8.506) 8.506 16.33
124 9'-6¼ Spr(-8.311) 8.311 16.14
125 8'-6¼ Spr(-10.637) 10.637 18.26
126 9'-6¼ Spr(-7.821) 7.821 15.66
127 9'-6¼ Spr(-7.546) 7.546 15.38
2 0'-10½ 84.815
1001 6'-1¾ 81.610
1002 2'-0 PO(20'-0) 84.150
1003 10'-0 22.138
1022 10'-0 PO(6'-0) 12.347
1023 10'-0 PO(5'-0) 11.054
1024 10'-0 PO(5'-0) 11.358
1025 10'-0 PO(6'-0) 11.856
1026 10'-0 PO(5'-0) 12.003
1027 10'-0 PO(5'-0) 10.355
1028 10'-0 PO(5'-0) 10.532
1029 10'-0 PO(5'-0) 11.751
1030 10'-0 PO(5'-0) 11.507
1031 10'-0 PO(6'-0) 11.465
1032 10'-0 PO(5'-0) 10.418
1033 10'-0 PO(5'-0) 9.652
1034 10'-0 PO(5'-0) 10.187
1035 10'-0 PO(6'-0) 11.422
1036 10'-0 PO(5'-0) 9.311
1037 10'-0 PO(5'-0) 11.366
1038 10'-0 PO(5'-0) 9.091
1039 10'-0 PO(6'-0) 11.355
1040 10'-0 PO(5'-0) 8.550
1041 10'-0 PO(5'-0) 8.244
© M.E.P.CAD, Inc. 11/2/2018 Page 7AutoSPRINK 2018 v14.1.4.0 12:16:35PM
Upstream Total Length
HWC
Hydraulic Analysis Job Number: OC1242
Report Description: Light Hazard
• • • • • Route 1 • • • • •
Pf
Pe
Pv
DR 1.0490 17.23 6.40 0.098798 2'-0¾ 1.092
117 9'-6¼ 17.23 5.6 9.470 9'-0 -0.208
1027 10'-0 10.355 11'-0¾
Sprinkler, 2E(2'-0), PO(5'-0)
Pf
Pe
Pv
CM 1.3800 17.23 3.70 0.025984 6'-10 0.178
1027 10'-0 10.355
1028 10'-0 10.532 6'-10
Pf
Pe
Pv
CM 1.3800 34.61 7.42 0.094406 8'-0¼ 1.324
1028 10'-0 17.38 10.532 6'-0
1025 10'-0 11.856 14'-0¼
Flow (q) from Route 2
PO(6'-0)
Pf
Pe
Pv
CM 3.0680 204.00 8.85 0.051344 2'-10¼ 0.147
1025 10'-0 169.39 11.856
1026 10'-0 12.003 2'-10¼
Flow (q) from Route 3
Pf
Pe
Pv
CM 3.0680 222.75 9.67 0.060412 5'-8¼ 0.344
1026 10'-0 18.75 12.003
1022 10'-0 12.347 5'-8¼
Flow (q) from Route 15
Pf
Pe
Pv
CM 3.0680 258.56 11.22 0.079597 113'-0¼ 9.792
1022 10'-0 35.81 12.347 10'-0
1003 10'-0 22.138 123'-0¼
Flow (q) from Route 4
2LtE(5'-0)
Pf
Pe
Pv
FR 2.4690 258.56 17.33 0.229248 236'-1½ 57.799
1003 10'-0 22.138 16'-0 1.673
1001 6'-1¾ 81.610 252'-1½
4LtE(4'-0)
Pf
Pe
Pv
MS 4.0260 258.56 6.52 0.021191 2'-11¾ 0.741
1001 6'-1¾ 81.610 32'-0 1.799
1002 2'-0 84.150 34'-11¾
CV(10'-0), GV(2'-0), PO(20'-0)
Pf
Pe
Pv
MS 6.0650 258.56 2.87 0.002881 8'-7¾ 0.178
1002 2'-0 84.150 53'-0 0.488
2 0'-10½ 84.815 61'-7¾
2LtE(9'-0), sCV(32'-0), GV(3'-0)
Pf
Pe
Pv
UG 8.3900 258.56 1.50 0.000446 471'-9½ 0.295
2 0'-10½ 84.815 190'-0 0.813
1 -1'-0 85.923 661'-9½
5E(30'-6½), GV(6'-9½), 2EE(15'-
3¼), S
508.56
250.00 Hose Allowance At Source
• • • • • Route 2 • • • • •
Pf
Pe
Pv
DR 1.0490 17.38 6.45 0.100345 2'-0¾ 1.109
116 9'-6¼ 17.38 5.6 9.630 9'-0 -0.208
1028 10'-0 10.532 11'-0¾
Sprinkler, 2E(2'-0), PO(5'-0)
• • • • • Route 3 • • • • •
Pf
Pe
Pv
DR 1.0490 15.38 5.71 0.080079 2'-3¾ 0.906
127 9'-6¼ 15.38 5.6 7.546 9'-0 -0.208
1041 10'-0 8.244 11'-3¾
Sprinkler, 2E(2'-0), PO(5'-0)
Pf
Pe
Pv
CM 1.3800 15.38 3.30 0.021061 14'-6 0.305
1041 10'-0 8.244
1040 10'-0 8.550 14'-6
Pf
Pe
Pv
CM 1.3800 31.04 6.66 0.077199 7'-0 0.541
1040 10'-0 15.66 8.550
1038 10'-0 9.091 7'-0
Flow (q) from Route 5
Pf
Pe
Pv
CM 1.3800 47.19 10.12 0.167506 7'-6¼ 2.265
1038 10'-0 16.14 9.091 6'-0
1039 10'-0 11.355 13'-6¼
Flow (q) from Route 6
PO(6'-0)
Pf
Pe
Pv
CM 3.0680 47.19 2.05 0.003422 3'-1 0.011
1039 10'-0 11.355
1037 10'-0 11.366 3'-1
Pf
Pe
Pv
CM 3.0680 65.45 2.84 0.006268 8'-11 0.056
1037 10'-0 18.26 11.366
1035 10'-0 11.422 8'-11
Flow (q) from Route 13
Pf
Pe
Pv
CM 3.0680 98.41 4.27 0.013329 3'-3½ 0.044
1035 10'-0 32.96 11.422
1031 10'-0 11.465 3'-3½
Flow (q) from Route 7
Pf
Pe
Pv
CM 3.0680 132.79 5.76 0.023201 1'-9¾ 0.042
1031 10'-0 34.38 11.465
1030 10'-0 11.507 1'-9¾
Flow (q) from Route 9
Pf
Pe
Pv
CM 3.0680 151.16 6.56 0.029487 8'-3 0.243
1030 10'-0 18.37 11.507
1029 10'-0 11.751 8'-3
Flow (q) from Route 14
© M.E.P.CAD, Inc. 11/2/2018 Page 8AutoSPRINK 2018 v14.1.4.0 12:16:40PM
Upstream Total Length
HWC
Hydraulic Analysis Job Number: OC1242
Report Description: Light Hazard
Pf
Pe
Pv
CM 3.0680 169.39 7.35 0.036401 2'-10¾ 0.105
1029 10'-0 18.23 11.751
1025 10'-0 11.856 2'-10¾
Flow (q) from Route 12
• • • • • Route 4 • • • • •
Pf
Pe
Pv
DR 1.0490 17.78 6.60 0.104727 2'-2¾ 1.176
114 9'-6¼ 17.78 5.6 10.086 9'-0 -0.208
1023 10'-0 11.054 11'-2¾
Sprinkler, 2E(2'-0), PO(5'-0)
Pf
Pe
Pv
CM 1.3800 17.78 3.81 0.027544 11'-0¼ 0.303
1023 10'-0 11.054
1024 10'-0 11.358 11'-0¼
Pf
Pe
Pv
CM 1.3800 35.81 7.68 0.100538…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.