About this opportunity

The U.S. Department of Transportation's Maritime Administration (MARAD) is seeking a contractor to perform comprehensive drydocking and repair services for the FB218 Deck Barge, a 110-foot steel hull vessel located in the James River Reserve Fleet. The solicitation requires a small business to conduct extensive hull repairs, including ultrasonic testing, deck hatch gasket replacement, rub-rail repairs, zinc anode renewal, and complete surface preparation and painting using specific Sherwin Williams marine coatings. Contractors must submit a technical submittal including a project schedule, subcontractor list, technical approach narrative, key personnel resumes, welder qualifications, and a proposed dry-docking plan. The evaluation will be based on technical acceptability, past performance, and pricing, with the award going to the lowest-price technically acceptable offeror. Quotes are due by April 22, 2025, at 2:00 PM EST, with the solicitation posted on March 20, 2025.

The contract is a 100% small business set-aside under NAICS code 336611 with a small business size standard of 1,300 employees. The work will be performed at a contractor's facility within the Hampton Roads area, with an initial 60-day period of performance (later extended to 90 days) from June 5, 2025, to September 2, 2025. The project involves significant steel replacement, including approximately 200 pounds of underwater plate, 1800 pounds of main deck plate, and 1000 pounds of void frame steel, along with 48 sacrificial anodes. The contractor will be responsible for comprehensive surface preparation, including abrasive blasting and multi-layer painting with specific color requirements: dark red below the waterline, black on the freeboard, and deck gray on the main deck. The place of performance is specified as Fort Eustis, Newport News, VA 23604, with the work to be conducted according to strict regulatory requirements, including National Fire Protection Association standards and Department of Labor safety regulations.

Notice text

6 versions

Update #6 · Latest ·

MARAD intends to award a firm-fixed price purchase order for the drydock and repair of FS218 in accordance with the attached Statement of Work.

Amendment 0001 is issued. Please see attached documents. References not available will be discussed at the site visit.

References:

  1. Joint Surface Preparation Standard NACE No. 1/SSPC-SP 5 White Metal Blast Cleaning Joint Surface (not available)
  2. Preparation Standard NACE No. 5/SSPC-SP 12 Surface Preparation and Cleaning of Steel and Other Hard Materials by High- and Ultrahigh-Pressure Water Jetting Prior to Recoating (not available)
  3. SSPC TR 2/NACE TR6G198-2023 (not available)
  4. Joint Surface Preparation Standard NACE No. 2/SSPC-SP 10 Near-White Metal Blast Cleaning (not available)
  5. Sherwin Williams Seaguard 5000 HS Epoxy Application Bulletin (attached)
  6. Sherwin Williams MIL-DTL-24441/19C Type III F159 Epoxy Polyamide Zinc Rich Primer (attached)
  7. Sherwin Williams Seaguard Ablative Antifouling Coating (attached)

Amendment 0002 is issued. Please see attached document. References not available will be discussed at the site visit.

Amendment 0003 is issued to answer bidder questions, extend dry dock period of performance to 90 days and add a TAR clause. Please see attached documents.

Amendment 0004 is issued to answer a bidder question.

Amendment 0005 is issued to answer a bidder question. The question and answer period closed as of 4/9/2025.

Update #5 ·

MARAD intends to award a firm-fixed price purchase order for the drydock and repair of FS218 in accordance with the attached Statement of Work.

Amendment 0001 is issued. Please see attached documents. References not available will be discussed at the site visit.

References:

  1. Joint Surface Preparation Standard NACE No. 1/SSPC-SP 5 White Metal Blast Cleaning Joint Surface (not available)
  2. Preparation Standard NACE No. 5/SSPC-SP 12 Surface Preparation and Cleaning of Steel and Other Hard Materials by High- and Ultrahigh-Pressure Water Jetting Prior to Recoating (not available)
  3. SSPC TR 2/NACE TR6G198-2023 (not available)
  4. Joint Surface Preparation Standard NACE No. 2/SSPC-SP 10 Near-White Metal Blast Cleaning (not available)
  5. Sherwin Williams Seaguard 5000 HS Epoxy Application Bulletin (attached)
  6. Sherwin Williams MIL-DTL-24441/19C Type III F159 Epoxy Polyamide Zinc Rich Primer (attached)
  7. Sherwin Williams Seaguard Ablative Antifouling Coating (attached)

Amendment 0002 is issued. Please see attached document. References not available will be discussed at the site visit.

Amendment 0003 is issued to answer bidder questions, extend dry dock period of performance to 90 days and add a TAR clause. Please see attached documents.

Amendment 0004 is issued to answer a bidder question.

Update #4 ·

MARAD intends to award a firm-fixed price purchase order for the drydock and repair of FS218 in accordance with the attached Statement of Work.

Amendment 0001 is issued. Please see attached documents. References not available will be discussed at the site visit.

References:

  1. Joint Surface Preparation Standard NACE No. 1/SSPC-SP 5 White Metal Blast Cleaning Joint Surface (not available)
  2. Preparation Standard NACE No. 5/SSPC-SP 12 Surface Preparation and Cleaning of Steel and Other Hard Materials by High- and Ultrahigh-Pressure Water Jetting Prior to Recoating (not available)
  3. SSPC TR 2/NACE TR6G198-2023 (not available)
  4. Joint Surface Preparation Standard NACE No. 2/SSPC-SP 10 Near-White Metal Blast Cleaning (not available)
  5. Sherwin Williams Seaguard 5000 HS Epoxy Application Bulletin (attached)
  6. Sherwin Williams MIL-DTL-24441/19C Type III F159 Epoxy Polyamide Zinc Rich Primer (attached)
  7. Sherwin Williams Seaguard Ablative Antifouling Coating (attached)

Amendment 0002 is issued. Please see attached document. References not available will be discussed at the site visit.

Amendment 0003 is issued to answer bidder questions, extend dry dock period of performance to 90 days and add a TAR clause. Please see attached documents.

Update #3 ·

MARAD intends to award a firm-fixed price purchase order for the drydock and repair of FS218 in accordance with the attached Statement of Work.

Amendment 0001 is issued. Please see attached documents. References not available will be discussed at the site visit.

References:

  1. Joint Surface Preparation Standard NACE No. 1/SSPC-SP 5 White Metal Blast Cleaning Joint Surface (not available)
  2. Preparation Standard NACE No. 5/SSPC-SP 12 Surface Preparation and Cleaning of Steel and Other Hard Materials by High- and Ultrahigh-Pressure Water Jetting Prior to Recoating (not available)
  3. SSPC TR 2/NACE TR6G198-2023 (not available)
  4. Joint Surface Preparation Standard NACE No. 2/SSPC-SP 10 Near-White Metal Blast Cleaning (not available)
  5. Sherwin Williams Seaguard 5000 HS Epoxy Application Bulletin (attached)
  6. Sherwin Williams MIL-DTL-24441/19C Type III F159 Epoxy Polyamide Zinc Rich Primer (attached)
  7. Sherwin Williams Seaguard Ablative Antifouling Coating (attached)

Amendment 0002 is issued. Please see attached document. References not available will be discussed at the site visit.

Update #2 ·

MARAD intends to award a firm-fixed price purchase order for the drydock and repair of FS218 in accordance with the attached Statement of Work.

Amendment 0001 is issued. Please see attached documents. References not available will be discussed at the site visit.

References:

  1. Joint Surface Preparation Standard NACE No. 1/SSPC-SP 5 White Metal Blast Cleaning Joint Surface (not available)
  2. Preparation Standard NACE No. 5/SSPC-SP 12 Surface Preparation and Cleaning of Steel and Other Hard Materials by High- and Ultrahigh-Pressure Water Jetting Prior to Recoating (not available)
  3. SSPC TR 2/NACE TR6G198-2023 (not available)
  4. Joint Surface Preparation Standard NACE No. 2/SSPC-SP 10 Near-White Metal Blast Cleaning (not available)
  5. Sherwin Williams Seaguard 5000 HS Epoxy Application Bulletin (attached)
  6. Sherwin Williams MIL-DTL-24441/19C Type III F159 Epoxy Polyamide Zinc Rich Primer (attached)
  7. Sherwin Williams Seaguard Ablative Antifouling Coating (attached)
Update #1 ·

MARAD intends to award a firm-fixed price purchase order for the drydock and repair of FS218 in accordance with the attached Statement of Work.

Files

Show all 16

Similar open opportunities

Opportunity Agency Set-aside Responses due
USCGC hammer (wlic 75302) USCG 68A barge (68014) drydock repairs FY2027 Jacksonville, Florida 32226, United States · NAICS 336611 — Total Small Business
Misty Barge Dry Dock Services Wrangell, Alaska 99929, United States · NAICS 336611 Forest Service Total Small Business
Drydock repairs for the CGC anvil NAICS 336611 — Total Small Business
CGC barbara mabrity NAICS 336611 — Total Small Business
CGC manta DD FY27 Corpus Christi, Texas, United States · NAICS 336611 — Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors