J061--541 Electrical Power Distribution Equipment Testing, Inspection, and Maintenance (VA-27-00000997) - VAMC Cleveland

Closed Pre-Solicitation Posted

Solicitation number
36C25026Q0634
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Department of Veterans Affairs Louis Stokes Celveland VA Medical Center Cleveland, Ohio 44106, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10 is conducting a sources sought market research for on-site electrical power distribution equipment testing, inspection, and maintenance services at Louis Stokes VA Medical Center in Cleveland, Ohio, with responses due by June 17, 2026. This is a market survey only; no solicitation is currently available and the government will not compensate respondents or guarantee future business.

Work encompasses full maintenance including testing, maintenance, and annual preventative maintenance inspections of substations, transformers (liquid-filled and dry-type), circuit breakers (400 amps and above), switchgear, switchboards, motor controls, and related components. Tri-annual work occurs January through May; ground resistance testing and infrared imagery occur annually in July. A four-hour emergency power outage test is scheduled for 2029. Deliverables include written reports within seven days of completion, infrared thermography surveys, transformer oil analysis, relay testing, and ground resistance testing.

Performance occurs at 10701 East Boulevard, Cleveland, Ohio 44106. Work hours are 7:00 a.m. to 11:30 p.m. Monday–Friday or 6:00 a.m. to 6:00 p.m. weekends, excluding federal holidays.

Contractors must hold NETA certification and possess minimum five years of continuous experience in electrical power distribution maintenance. OSHA 10-hour safety training and NFPA 70E qualification are required. All tools and test equipment must maintain current calibration.

The anticipated base contract year runs November 1, 2026 through October 31, 2027, with four additional option years. NAICS 238210 applies (small business size standard $19 million). Responses should be submitted to christopher.callihan@va.gov.

Notice text

Page 3 of 3

This is a Sources Sought (SS) Notice only, not a solicitation announcement and should not be considered as such. There is no solicitation available at this time. The Government will not pay for any information received in response to this SS, nor will the Government compensate any respondent for any cost incurred in developing the information provided to the Government. This SS does not constitute a commitment by the Government. Any information provided in response to this market survey will be used for informational purposes only and will not be released. Vendor participation is not a promise of future business with the Government. The purpose of this Sources Sought is to conduct Market Research to determine an acquisition strategy for the acquisition of Electrical Power Distribution Equipment Testing, Inspection, and Maintenance.

VAMC Cleveland, is seeking sources capable of complete the services described in the Statement of Work below.

Electrical Power Distribution Equipment Testing, Inspection, and Maintenance

STATEMENT OF WORK (SOW)

as of 3/7/2026

1. Contracting Officer s Representative (COR).

Name:

TBD

Section:

Address:

10701 East Blvd, Cleveland, OH 44106

Phone Number:

TBD

Fax Number:

TBD

E-Mail Address:

TBD

2. Contract Title. Electrical Power Distribution Equipment Testing, Inspection, and Maintenance

3. Background.

Louis Stokes VA Medical Center, Cleveland, Ohio located at 10701 East Boulevard, Cleveland, Ohio 44106 is seeking a qualified contractor to provide, labor, materials, equipment, transportation, and supervision necessary to provide on-site full electrical power distribution equipment testing, maintenance, and inspections. Full maintenance includes on-site testing, maintenance and annual preventative maintenance inspections (PMI s).

4. Scope.

The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform maintenance and inspection, testing, and/or calibration of the Electrical Power Distribution Equipment and all of its components at the Cleveland VA Medical Center of facility Electrical Power Distribution Equipment meeting NETA standards.

Electrical Power Distribution Equipment Testing, Inspection, and Maintenance

as defined in this Statement of Work except for those items specified as government furnished property and services. The contractor shall meet the standards in this contract.

In the event faults or repairs identified during maintenance or inspection exceed basic repair, Contractor shall submit cost estimate and Scope of Work to COR for routing to CO for approval and contract modification. No repairs or work outside the scope of this contract shall be performed prior to CO approval and fund allocation. All quotes for repair parts shall be provided at the agreed upon discounted GSA rate. Power distribution equipment maintenance schedule includes tri-annual testing, maintenance and inspection. Tri-annual testing of power distribution equipment outlined in section 5.10 of this SOW.

5. Specific Tasks.

Onsite testing, inspection, minor repair, and housekeeping.

5.1 Substation and Transformer Maintenance completed tri-annually January May (Testing Period may be adjusted to meet medical center needs)

Visually inspect, tighten hardware and torque bolted connections.

Manually operate each switch to check operation of auxiliaries and interlocks. Check contact wipe, clearances and gaps as described in the manufacturer's instruction book.

Clean and lubricate all moving parts with manufacturer's approved lubricants.

Check electrically operable devices by conducting operating tests as described by manufacturer s instructions. Test all control systems equipment for proper operation after maintenance is performed and before placing them back in normal service.

Verify the Kirk Key interlock system.

Test bus for insulation resistance.

The vendor is responsible for a thorough cleaning of all substations which includes all the bus, wiring, inside panels, and any and all supporting parts. All cleaning products must meet substation manufacture factory specifications. Use lint-free rags to clean conductors, contact points between the circuit breakers and main buss bars, buss bars and interior of the electrical equipment. Wipe down all sides and top of cabinet, substation or panel to remove dust/debris. Use a vacuum cleaner to remove large debris; compressed air is not to be used for this purpose. Visually inspect for signs of overheating, misaligned contacts, damaged insulation, or lose lugs. Upon completion the COR will inspect the substation for cleanliness. The vendor is responsible for inspecting the inside of the substation and confirms no foreign objects have been left inside the substation prior to returning to service.

Liquid cooled transformers must have the cooling liquid tested and replaced when tests indicate that the liquid no longer meets manufacturer's specification. The liquid must be re-filled to meet the manufacturer's specifications.

Test insulation resistance of both high and low voltage windings to ground and each other.

Inspect temperature relays, gauges, switches and alarms.

If equipped with fans and pumps, verify proper operation and test.

Verify three (3} phase transformer turns ratio on all taps using a three (3} phase test set.

Power factor test.

Dry type transformers must be thoroughly cleaned exteriorly and inspected for overheating with infra-red thermal detecting equipment.

Test insulation resistance of both high and low voltage windings to ground.

Inspect temperature relays, gauges, switches, and alarms.

Test fans, if equipped, and inspect all vent filters. Ensure proper routing of thermocouple leads.

Verify transformer turns ratio on all taps.

Visually inspect and clean transformer windings.

Check torque on all accessible bolted connections.

Clean cells and bus components.

Test bus for insulation resistance. Visually inspect the main bus.

Test all accessible bolted bus connections for proper torque and integrity.

Test protective relays.

Verify potential and control transformers.

Check the breaker lifting device for proper operation.

Verify the key interlock system.

Energize the control circuits and test the integrity of the breaker close and trip circuits by operating the control switches and relay contacts.

Verify the proper functioning of all indicating devices.

Bolted pressure switches: Clean, lubricate and verify electrical and mechanical operation.

Energize the control circuits and test the integrity of the breaker close and trip circuits by operating the control switches and relay contacts.

Verify the proper functioning of all indicating devices.

Verify the proper operation of the control power transfer equipment.

Functional test all protective relays, where permitted.

Switchgear and Switchboard Assemblies.

Transformers 500 Kilovolt-Amps (kVA) or larger

Switches, Vacuum, Medium-Voltage

Switches, Air, Low-Voltage.

Switches, Air, Medium-Voltage, Metal-Enclosed

Motor Control, Motor Starter, Medium-Voltage

Motor Control, Motor Starters, Low-Voltage.

Metal Enclosed Busways

Switches, Air, Medium-Voltage, Metal-Enclosed

Switches, Vacuum, Medium-Voltage

Transformers, Dry Type, Air-Cooled, Low-voltage, Small.

Transformers, Dry Type, Air-Cooled, Low-voltage, Large.

Transformers, Liquid-Filled.

Circuit Breaker Maintenance 400 amps and above completed tri-annually January May (Testing Period may be adjusted to meet medical center needs)

Clean and lubricate, as necessary.

Operate the breaker racking mechanisms to verify smooth operation.

Operate the breakers to check the operation of auxiliaries and interlocks.

For low voltage breakers, inspect arc chutes, contacts and insulation structures in accordance with the manufacturer's instruction manual. Test each breaker with a portable secondary injection test set or primary injection test set.

For medium voltage breakers, inspect interphase barriers and insulation structure for signs of damage or contamination. Check contacts in accordance with the manufacturer's instruction manual.

Test insulation resistance.

Test contact resistance.

Circuit Breakers, Air, Insulated-Case/ Molded-Case.

Circuit Breakers, Air, Low-Voltage Power.

Circuit Breakers, Vacuum, Medium-Voltage.

5.3 Ground Resistance Testing completed annually July

Test Ground resistance for the main MV room and all 24 substations throughout the facility. Refer to VAH 1028 FY16.

Grounding Systems.

Ground-fault Protection Systems.

5.4 IR Imagery completed annually in July

Infra-Red Scanning/Thermographic Survey shall be performed on electrical equipment.

Use an infra-red scanning camera to detect hot spots in the Electrical Power Distribution System.

Objective of this work is to detect any loose, broken, or corroded connections in the system.

Problem connections shall be replaced with new connectors, and/or tightened with torque wrench to meet the equipment manufacturers specifications.

Infra-Red Report shall be prepared and submitted to COTR within seven (7} days of completion.

Test report shall include nameplate data, test results, general condition and maintenance recommendations, and location.

Color pictures shall be provided of any problem areas

Note that since this work item must be done while the Electrical Power Distribution System is energized, appropriate safety precautions must be taken before, during and after scanning the system.

The report for infrared inspections shall provide complete documentation of thermal patterns detected in the electrical equipment within the Louis Stokes VA Facility. Provide qualitative evaluation to help prioritize repairs.

The infrared inspection report should meet the documentation requirements of the Infra-red inspection Institute Guideline for Infrared Inspection of Electrical and Mechanical Systems. All other published guidelines and standards pertaining to the infrared inspection of electrical and mechanical systems should be referenced and incorporated in the report and inspection.

Electrical equipment (including, but not limited to switchgears, switchboards, distribution panels, motor control centers, and all related components) is inspected, tested, maintained, and/or calibrated every 36 months, and all work must be documented. NOTE: The National Electrical Testing Association (NETA) provides guidance, which is considered best practice for the maintenance of electrical equipment; these practices should be followed to the extent possible.

Identify the hot spots in the electrical equipment by using infra-red thermal detecting equipment. Tighten problem connections to meet equipment manufacturers specifications using a torque wrench or other approved devices.

Repair Priority Ratings

Temperature Severity Ratings are the objective and based on temperatures measured by the thermography. The exception and other reference temperatures are compared to industry standards and guidelines to produce an objective Temperature Severity Rating. The vendor is to use the following temperature criteria to assign Temperature Severity Ratings to the exceptions:

NETA Priority Criteria for Electrical & Mechanical Exceptions

#1 (0 to 18°F} Possible deficiency and warrants investigation

#2 (18 to 36 °F} Indicates probable deficiency, repair as time permits

#3 (36 to 72 °F} Indicates definite discrepancy; repair as soon as possible

#4 (Greater than 72 °F} Indicates major discrepancy; repair immediately

5.5 Medium Voltage Relay Testing completed tri-annually January May

Protective Relays Microprocessor Based.

Calibrate and maintain adjustable protective relays.

Visual inspection.

Clean.

Test.

5.6 Medium Voltage Substation Control Power Batteries completed annually January May

Inspect, clean and check torque on bolted connections.

Check for proper voltage and regulation.

Perform battery impedance and resistance testing.

5.7 Transformer Oil Testing completed annually April June

Collect cooling liquid oil sample for testing:

General quality tests

Dielectric strength

Acid neutralization

Interfacial tension

Visual inspection

Water content

Power factor

Dissolved gas analysis

5.8 Tri-annual 4-Hour Power Outage Test (2029)

The Contractor shall be present for and will participate as a resident expert in the VAMC 4- hour test of the Essential Electrical System (EES) to be conducted on a Saturday or Sunday.

This test shall fulfill the requirements of VHA Directive, Electrical Power Distribution System, NFPA 110 (e.g. Para. 8.4.9.) and The Joint Commission. This test will include opening all utility service connections serving the VAMC for a minimum of 4 hours.

During the test period, verify operation of all EES components including the transfer to emergency power and return to normal service.

The Contractor shall include in their bid proposal all costs associated with the services of the local utility company for the duration of the test. The estimated duration of the Contractor s involvement is between 8 12 hours.

The Contractor shall assist the VAMC staff with troubleshooting and correcting malfunctioning electrical equipment discovered during the test.

Contractor shall make any required adjustments and/or re-calibrations to all equipment which has been otherwise maintained, inspected, and tested under this Scope of Work.

5.9 Maintenance Reports

Contractors shall report deficiencies that are deemed critical or catastrophic immediately to the Contracting Officer Representative for immediate actions.

Work items, definitions, and references shall comply with the latest edition of the NETA Maintenance Testing Specifications (MTS) and with the VHA Directive, Electrical Power Distribution System.

NOTE: settings such as ATS settings, Adjustable Breaker Settings, etc must be provided by the VA. If not available from current coordination studies, then they should have the contractor conduct a study to determine proper settings.

System Function Tests. Provide function tests for all equipment listed in this Scope of Work.

Test Conditions.

5.10 -- Tri-Annual Testing and Inspection

Breaker Testing List

Base Year: November 1, 2026 Through October 31, 2027

Substation

MV Sw

XFMRs

Â

Circuit Breakers

Â

Â

2027/2030

Qty

KVA

Qty

MFG

Ampacity

Qty

Energy Center

Â

Â

Â

Â

Â

Â

Russel Gear

N/A

N/A

Â

Cutler Hammer MDS840

4000

1

BE602

Â

Â

Â

Cutler Hammer MDS632

3200

2

Â

Â

Â

Â

Cutler Hammer MDS620

2000

3

Â

Â

Â

Â

Cutler Hammer MDS616

1600

6

Â

Â

Â

Â

Cutler Hammer MDS608

800

2

Â

Â

Â

Â

Â

Â

Â

EC2

2

1000 Dry

1

Square D RJ1600

1600

1

Â

Â

Â

Â

Square D NE361200 LSG

1200

3

Â

Â

Â

Â

Â

Â

Â

EC1

2

2500 Dry

1

5KV SW/5 KV Starters

Â

Â

Â

Â

Â

Â

Â

Â

Â

EC3A

2

3000 Oil

1

Square D NW40H

4000

1

Â

Â

Â

Â

Â

Â

Â

Tie-GPS-TGPB

Â

Â

Â

Square D NW40H

4000

1

Â

Â

Â

Â

Square D NW32H

3200

2

Â

Â

Â

Â

Â

Â

Â

DPE-5

Â

Â

Â

Square D PJ800

800

1

Â

Â

Â

Â

Square D LJ400

400

1

EDSB3

Â

Â

Â

Square D PJ800

800

2

EDSB4

Â

Â

Â

Square D PJ800

800

1

Â

Â

Â

Â

Square D LJ400

400

1

EC3B

Â

Â

Â

Square D NW20H1

2000

2

Â

Â

Â

Â

Square D NW16H1

1600

1

Â

Â

Â

Â

Square D NW08H1

800

3

Â

Â

Â

Â

Â

Â

Â

GDS3

Â

Â

Â

Eaton SBS 630

3000

4

DPE3

Â

Â

Â

Eaton LT360032

450

2

Â

Â

Â

Â

Â

Â

Â

MV Substation

Â

Â

Â

C/H 150VCP-W 500

1200

33

Â

Â

Â

Â

Â

Â

Â

Research K03

1

1000 Oil

1

GE AK50

1600

2

BF458

Â

Â

Â

GE AK25

600

4

Â

Â

Â

Â

Â

Â

Â

Surgery

4

Dry

2

Schneider

1600

3

Â

Â

Â

Â

Schneider

800

3

Breaker Testing List

Option Year 1: November 1, 2027 Through October 31, 2028

Substation

MV Sw

XFMRs

Â

Circuit Breakers

Â

2028/2031

Qty

KVA

Qty

MFG

Ampacity

D21

Â

Â

Â

Â

Â

Sub A

N/A

1500 Oil

2

GE AK2-75

3000

Â

Â

Â

Â

GE AK2-50

1600

Sub B

N/A

1500 Oil

2

GE AK2-75

3000

Â

Â

Â

Â

GE AK2-50

1600

EDSB-2

N/A

N/A

Â

Square D MH36800

800

Emergency

Â

Â

Â

Square D MH36600

600

Panel

Â

Â

Â

Square D MH36400

400

Â

Â

Â

Â

Square D MH34250

250

Â

Â

Â

Â

Square D MH34225

225

Â

Â

Â

Â

Square D MH34200

200

Â

Â

Â

Â

Square D SE

2500

Â

Â

Â

Â

Siemens MCCB

1200

Penthouse

Â

Â

Â

Â

Â

Sub W

2

1500 Oil

2

GE AKRT-6D-50H

2000

Â

Â

Â

Â

GE AKRT-6D-30H

800

Â

Â

Â

Â

Â

Â

Elevator

N/A

N/A

Â

GE AK2A-50

1600

Â

Â

Â

Â

GE AK2A-25

600

MICU

Â

Â

Â

Â

Â

MSB-N1

2

750 Dry

1

Siemens WLS2A316

1200

Â

Â

Â

Â

Siemens MCCB

800

Â

Â

Â

Â

Siemens MCCB

600

Â

Â

Â

Â

Siemens MCCB

400

Â

Â

Â

Â

Siemens MCCB

300

DPNB1-G

Â

Â

Â

Siemens MCCB

800

Â

Â

Â

Â

Siemens MCCB

600

Â

Â

Â

Â

Siemens MCCB

300

DPNB1

Â

Â

Â

Siemens MCCB

600

DPNB1-CR

Â

Â

Â

Siemens MCCB

600

DPNB2-CR

Â

Â

Â

Siemens MCCB

600

CB-T-UPS

Â

Â

Â

Siemens MCCB

600

7th Floor

Â

Â

Â

Â

Â

EDP

Â

Â

Â

Eaton RD320T36W

2000

Â

Â

Â

Â

Eaton MCCB

800

Â

Â

Â

Â

Eaton MCCB

400

DPHL71EQ

Â

Â

Â

Eaton MCCB

800

Â

Â

Â

Â

Eaton MCCB

250

DPHL72EQ

Â

Â

Â

Square D Power Pact

800

Â

Â

Â

Â

Square D Power Pact

400

DPEG2

Â

Â

Â

Eaton MCCB

1200

Cares Tower

Â

Â

Â

Eaton MCCB

800

Yearly Breaker Testing List

Option Year 2 : November 1, 2028 Through October 31, 2029

Substation

MV Sw

XFMRs

Â

Circuit Breakers

Â

Â

2029/2032

Qty

KVA

Qty

MFG

Ampacity

Qty

Amb Care

Â

Â

Â

Â

Â

Â

Sub H1

2

1500 Dry

1

Cutler Hammer MDS632

3200

1

Â

Â

Â

Â

Cutler Hammer MDS616

1600

1

Â

Â

Â

Â

Cutler Hammer MDS408

800

9

Sub H2

2

1500 Dry

1

Cutler Hammer MDS632

3200

1

Â

Â

Â

Â

Cutler Hammer MDS616

1600

1

Â

Â

Â

Â

Cutler Hammer MDS408

800

8

EGSB1

Â

Â

Â

Cutler Hammer MCCB

1200

1

Â

Â

Â

Â

Cutler Hammer MCCB

1200

1

Â

Â

Â

Â

Cutler Hammer MCCB

800

2

Â

Â

Â

Â

Cutler Hammer MCCB

600

2

Â

Â

Â

Â

Â

Â

Â

Emergency

N/A

750 Dry

1

In Amb Care

Â

Â

Emergency

1

750 Dry

1

In Energy Center

Â

Â

Â

Â

Â

Â

Â

Â

Â

Cares Tower

Â

Â

Â

Â

Â

Â

1st Floor F1, F2

4

1500 Dry

2

Eaton MDS630

3000

3

BF-193

Â

Â

Â

Eaton MCCB

800

5

Â

Â

Â

Â

Eaton MCCB

400

2

Â

Â

Â

Â

Eaton MCCB

150

1

Upstairs F3, F4

4

1000 Dry

2

Eaton MDS620

2000

3

PF-105

Â

Â

Â

Eaton MCCB

800

6

Â

Â

Â

Â

Eaton MCCB

160

2

DPEG2 - Cares PH

Â

Â

Â

Eaton MCCB

1200

1

Â

Â

Â

Eaton MHDL3400F

400

6

Radiology

Â

Â

Â

Â

Â

Â

Left side

2

500 Dry

1

Eaton MDS612

1200

2

2B-502

Â

Â

Â

Eaton MCCB

800

2

Â

Â

Â

Â

Eaton MCCB

400

2

Â

Â

Â

Â

Eaton MCCB

225

7

Right Side

2

1000 Dry

1

Eaton MDS620

2000

1

Â

Â

Â

Â

Eaton MCCB

400

1

Â

Â

Â

Â

Eaton MCCB

800

1

Â

Â

Â

Â

Eaton MCCB

160

3

Pathology

2

1500 Dry

1

GE Wavepro

2500

2

USS-F2

Â

Â

Â

GE MCCB

400

2

Â

Â

Â

Â

GE MCCB

150

2

Â

Â

Â

Â

GE MCCB

125

1

Â

Â

Â

Â

GE MCCB

100

1

Â

Â

Â

Â

Â

Â

Â

Lab Warehouse

2

1500 Dry

1

Eaton MDS625

2500

2

USS-F1

Â

Â

Â

Eaton MCCB

630

2

Â

Â

Â

Â

Eaton MCCB

400

3

Â

Â

Â

Â

Â

Â

Â

Parking Garage

1

Oil

1

Â

Â

Â

Yearly Breaker Refurbishing and Testing Listing

Option Year 3 : November 1, 2029 Through October 31, 2030

Substation

MV Sw

XFMRs

Â

Circuit Breakers

Â

Â

2027/2030

Qty

KVA

Qty

MFG

Ampacity

Qty

Energy Center

Â

Â

Â

Â

Â

Â

Russel Gear

N/A

N/A

Â

Cutler Hammer MDS840

4000

1

BE602

Â

Â

Â

Cutler Hammer MDS632

3200

2

Â

Â

Â

Â

Cutler Hammer MDS620

2000

3

Â

Â

Â

Â

Cutler Hammer MDS616

1600

6

Â

Â

Â

Â

Cutler Hammer MDS608

800

2

Â

Â

Â

Â

Â

Â

Â

EC2

2

1000 Dry

1

Square D RJ1600

1600

1

Â

Â

Â

Â

Square D NE361200 LSG

1200

3

Â

Â

Â

Â

Â

Â

Â

EC1

6-Jun

2500 Dry

1

5KV SW/5 KV Starters

Â

Â

Â

Â

Â

Â

Â

Â

Â

EC3A

2

3000 Oil

1

Square D NW40H

4000

1

Â

Â

Â

Â

Â

Â

Â

Tie-GPS-TGPB

Â

Â

Â

Square D NW40H

4000

1

Â

Â

Â

Â

Square D NW32H

3200

2

Â

Â

Â

Â

Â

Â

Â

DPE-5

Â

Â

Â

Square D PJ800

800

1

Â

Â

Â

Â

Square D LJ400

400

1

EDSB3

Â

Â

Â

Square D PJ800

800

2

EDSB4

Â

Â

Â

Square D PJ800

800

1

Â

Â

Â

Â

Square D LJ400

400

1

EC3B

Â

Â

Â

Square D NW20H1

2000

2

Â

Â

Â

Â

Square D NW16H1

1600

1

Â

Â

Â

Â

Square D NW08H1

800

3

Â

Â

Â

Â

Â

Â

Â

GDS3

Â

Â

Â

Eaton SBS 630

3000

4

DPE3

Â

Â

Â

Eaton LT360032

450

2

Â

Â

Â

Â

Â

Â

Â

MV Substation

Â

Â

Â

C/H 150VCP-W 500

1200

33

Â

Â

Â

Â

Â

Â

Â

Research K03

1

1000 Oil

1

GE AK50

1600

2

BF458

Â

Â

Â

GE AK25

600

4

Â

Â

Â

Â

Â

Â

Â

Surgery

4

Dry

2

Schneider

1600

3

Â

Â

Â

Â

Schneider

800

3

Breaker Testing List

Option Year 4: November 1, 2030 Through October 31, 2031

Substation

MV Sw

XFMRs

Â

Circuit Breakers

Â

2028/2031

Qty

KVA

Qty

MFG

Ampacity

D21

Â

Â

Â

Â

Â

Sub A

N/A

1500 Oil

2

GE AK2-75

3000

Â

Â

Â

Â

GE AK2-50

1600

Sub B

N/A

1500 Oil

2

GE AK2-75

3000

Â

Â

Â

Â

GE AK2-50

1600

EDSB-2

N/A

N/A

Â

Square D MH36800

800

Emergency

Â

Â

Â

Square D MH36600

600

Panel

Â

Â

Â

Square D MH36400

400

Â

Â

Â

Â

Square D MH34250

250

Â

Â

Â

Â

Square D MH34225

225

Â

Â

Â

Â

Square D MH34200

200

Â

Â

Â

Â

Square D SE

2500

Â

Â

Â

Â

Siemens MCCB

1200

Penthouse

Â

Â

Â

Â

Â

Sub W

2

1500 Oil

2

GE AKRT-6D-50H

2000

Â

Â

Â

Â

GE AKRT-6D-30H

800

Â

Â

Â

Â

Â

Â

Elevator

N/A

N/A

Â

GE AK2A-50

1600

Â

Â

Â

Â

GE AK2A-25

600

MICU

Â

Â

Â

Â

Â

MSB-N1

2

750 Dry

1

Siemens WLS2A316

1200

Â

Â

Â

Â

Siemens MCCB

800

Â

Â

Â

Â

Siemens MCCB

600

Â

Â

Â

Â

Siemens MCCB

400

Â

Â

Â

Â

Siemens MCCB

300

DPNB1-G

Â

Â

Â

Siemens MCCB

800

Â

Â

Â

Â

Siemens MCCB

600

Â

Â

Â

Â

Siemens MCCB

300

DPNB1

Â

Â

Â

Siemens MCCB

600

DPNB1-CR

Â

Â

Â

Siemens MCCB

600

DPNB2-CR

Â

Â

Â

Siemens MCCB

600

CB-T-UPS

Â

Â

Â

Siemens MCCB

600

7th Floor

Â

Â

Â

Â

Â

EDP

Â

Â

Â

Eaton RD320T36W

2000

Â

Â

Â

Â

Eaton MCCB

800

Â

Â

Â

Â

Eaton MCCB

400

DPHL71EQ

Â

Â

Â

Eaton MCCB

800

Â

Â

Â

Â

Eaton MCCB

250

DPHL72EQ

Â

Â

Â

Square D Power Pact

800

Â

Â

Â

Â

Square D Power Pact

400

DPEG2

Â

Â

Â

Eaton MCCB

1200

Cares Tower

Â

Â

Â

Eaton MCCB

800

Infra-Red Line Items for Inspection

Infra-Red Line items for inspection ITEM #

EQUIPMENT DESCRIPTION

LOCATION

1

16 Panels

Main Basement, BA-151 Ambulatory Care

2

ATS # 1,2,3,4

Main Basement, BA-151 Ambulatory Care

3

Subs H1 & H2

Main Basement, BA-151 Ambulatory Care

4

MCC1 & MCC2

Main Basement, BA-151 Ambulatory Care

5

6 Surge Arrestors

Main Basement, BA-151 Ambulatory Care

6

VFD 51 Return & Supply Fans

Main Basement, BA-151 Ambulatory Care

7

VFD 52 Return & Supply Fans

Main Basement, BA-151 Ambulatory Care

8

VFD 53 Return & Supply Fan

Main Basement, BA-151 Ambulatory Care

9

5 Cutler Hammer Switchboards

Main Basement, BA-151 Ambulatory Care

10

16 Disconnect Switches

Main Basement, BA-151 Ambulatory Care

11

8 Panels & 1 Disconnect Switch

Main Basement, B-B362 Electrical Room

12

5 Panels

Main Basement, B-C315 Engineering Closet

13

ATS # 16,17,18,19

Main Basement, FES B-E261

14

24 Panels

Main Basement, FES B-E261

15

4 Disconnect Switches

Main Basement, FES B-E261

16

6 Disconnect Switches & 8 VFDs

Main Basement, FES B-E260

17

1 Panel

Main Basement, F12A

18

3 Panels

Main Basement, 1-E500 Generator Room

19

14 Panels & 1 Disconnect

Main Basement, H-01A

20

Subs GPS 1 & GPS 2, 1 Panel

Main Basement, B-E602 Russ Gear Room

21

3 Disconnect Switches & 1 Panel

Main Basement, B-E503 Pipe Tunnel

22

7 Panels & 1 Disconnect Switch

Main Basement, B-E361B Hall by Cares Tower

23

4 Panels

Main Basement, B-A148 Electrical Closet

24

4 Panels & 2 Disconnect Switches

Main Basement, B-C563

25

ATS # 49,50

Main Basement, Unmarked by Room B-B549

26

7 Panels

Main Basement, Unmarked by Room B-B549

27

All Breakers

Main Basement, B-E504 Main Sub

28

Incoming Disconnects & Battery Rack

Main Basement, B-E504 Main Sub

29

ATS # 23,24,25

Main Basement, B-D423

30

3 Panels & 1 Disconnect Switch

Main Basement, B-D423

31

7 Eaton Switchboards

Main Basement, B-D423

32

ATS # 26

Main Basement, B-D424

33

5 Panels

Main Basement, B-D424

34

ATS # 5,8,22

Main Basement, D21

35

10 Panels

Main Basement, D21

36

Sub A & B, Lighting and Power

Main Basement, D21

37

ATS # 65

Main Basement, Energy Center, B-E603

38

Eaton Subs GDS3 & EC3B

Main Basement, Energy Center, B-E603

39

ATS # 15, 51, 52

Main Basement, Energy Center, B-E601

40

9 Panels

Main Basement, Energy Center, B-E601

41

4 Chiller Starter Switches

Main Basement, Energy Center, B-E601

42

Subs 1, EC2, EC3, TGP

Main Basement, Energy Center, B-E601

43

1 Panel

Main Basement, Energy Center, Cat Gen Room

44

8 Panels, 12 Disconnect Switches & 13 VFDs

Main Basement, B-D607 Chiller Plant North

45

7 VFDs

Main Basement, Boiler Room

46

9 Disconnect Switches

Main Basement, B-F411 Water Filtration

47

9 Panels

Main 1st Floor, 129E by Surgery Sub

48

5 Panels & 2 Disconnect Switches

Main 1st Floor, K111-A

49

4 Panels & 1 Disconnect Switch

Main 1st Floor, K122B

50

3 Panels

Main 1st Floor, Kitchen

51

1 Panel

Main 1st Floor, 1-D392

52

1 Panel

Main 1st Floor, 1-E401

53

8 Panels

Main 1st Floor, A-105 Surgery Sub

54

ATS # 11,12,13

Main 1st Floor, A-105 Surgery Sub

55

10 Disconnect Switches

Main 1st Floor, A-107 AC Shop

56

MCC N1 & E1

Main 1st Floor, A-107 AC Shop

57

4 Panels & 1 Disconnect Switch

Main 2nd Floor, 2A-102

58

6 Panels

Main 2nd Floor, 2A-158

59

3 Panels & 1 Disconnect Switch

Main 2nd Floor, 2A-187

60

11 Panels

Main 2nd Floor, 2B-125

61

4 Panels

Main 2nd Floor, 2B-126

62

8 Panels & 2 Disconnect Switches

Main 2nd Floor, 2B-148

63

5 Panels & 2 Disconnect Switches

Main 2nd Floor, 2B-223

64

ATS # 20

Main 2nd Floor, 2B-480 Mech Room East

65

5 Panels, 2 Disconnect Switches & 1 VFD

Main 2nd Floor, 2B-480 Mech Room East

66

4 Panels & 4 Disconnect Switches

Main 2nd Floor, 2B-501 Mechanical Penthouse

67

ATS # 42 & Teledata ATS

Main 2nd Floor, 2B-502 Penthouse

68

Sub Stations F1 & F2

Main 2nd Floor, 2B-502 Penthouse

69

1 Panel, 3 Disconnect Switches & Eaton Panel

Main 2nd Floor, 2B-502 Penthouse

70

9 Panels

Main 2nd Floor, 2C-411

71

1 Panel & Bus Duct

Main 2nd Floor, 2C-412

72

1 Disconnect Switch & 1 VFD

Main 2nd Floor, 2C-2041

73

MCC 22B

Main 2nd Floor, 2C-2041

74

2 Panels

Main 2nd Floor, 2D-177

75

1 Panel

Main 2nd Floor, 2D-188

76

2 Panels

Main 2nd Floor, 2D-190

77

3 Panels

Main 2nd Floor, 2D-191

78

3 Panels

Main 2nd Floor, 2E-320

79

2 Panels & 1 Disconnect Switch

Main 2nd Floor, 2E-347

80

1 Panel

Main 2nd Floor, 2E-361

81

9 Panels

Main 2nd Floor, 2E-315

82

ATS # 21

Main 2nd Floor, 2E-480 Mech Room West

83

3 Panels, 3 Disconnect Switches & 1 VFD

Main 2nd Floor, 2E-480 Mech Room West

84

3 Panels & 2 Disconnect Switches

Main 2nd Floor, k-214A

85

4 Panels & 2 Disconnect Switches

Main 2nd Floor, k-222

86

3 Disconnect Switches

Main 2nd Floor, Rm 2004

87

2 Panels

Main 3rd Floor, 3A-100

88

2 Panels

Main 3rd Floor, 3A-113

89

3 Panels

Main 3rd Floor, 3A-115, Mechanical

90

2 Panels

Main 3rd Floor, 3A-122

91

2 Panels

Main 3rd Floor, 3A-136

92

3 Panels

Main 3rd Floor, 3B-147

93

1 Panel

Main 3rd Floor, 3B-148

94

2 Panels

Main 3rd Floor, 3B-149

95

25 Panels

Main 3rd Floor, 3B-162b Electrical Room

96

3 Disconnect Switches

Main 3rd Floor, 3B-162d Penthouse

97

2 Panels

Main 3rd Floor, 3C-105

98

Bus Duct

Main 3rd Floor, 3C-108

99

MCC 32, AC 25 MCC

Main 3rd Floor, Penthouse

100

1 Panel

Main 4th Floor, 4A-109

101

1 Panel

Main 4th Floor, 4A-109

102

3 Panels

Main 4th Floor, 4A-114

103

1 Panel

Main 4th Floor, 4A-116

104

2 Panels

Main 4th Floor, 4A-125

105

2 Panels

Main 4th Floor, 4A-149

106

1 Panel

Main 4th Floor, 4A-160

107

4 Panels

Main 4th Floor, 4AC-232, By Stair 4 Amb. Care

108

1 Panel

Main 4th Floor, 4B-106

109

6 Panels

Main 4th Floor, 4B-111

110

1 Panel

Main 4th Floor, 4B-112

111

3 Panels

Main 4th Floor, 4B-121

112

1 Panel

Main 4th Floor, 4B-147

113

1 Panel

Main 4th Floor, 4B-155

114

6 Panels

Main 4th Floor, 4C-103

115

Bus Duct

Main 4th Floor, 4C-106

116

4 Panels

Main 5th Floor, 5A-114

117

2 Panels

Main 5th Floor, 5A-125

118

2 Panels

Main 5th Floor, 5A-152

119

3 Panels & 1 Disconnect Switch

Main 5th Floor, 5B-115

120

2 Panels

Main 5th Floor, 5B-125

121

2 Panels

Main 5th Floor, 5B-152

122

3 Panels

Main 5th Floor, 5C-111

123

Bus Duct

Main 5th Floor, 5C-Elevators

124

3 Panels, 10 Disconnect Switches

Main 5th Floor, Penthouse, Stair C,1 or 4

125

6 VFDs, 4 Control Panels

Main 5th Floor, Penthouse, Stair C,1 or 4

126

2 Panels

Main 6th Floor, 6A-105

127

1 Panel

Main 6th Floor, 6A-111

128

2 Panels

Main 6th Floor, 6A-112

129

3 Panels & 10 Disconnect Switches

Main 6th Floor, 6A-126

130

1 Panel

Main 6th Floor, 6A-140

131

2 Panels

Main 6th Floor, 6B-105

132

2 Panels

Main 6th Floor, 6B-117

133

1 Panel

Main 6th Floor, 6B-124

134

2 Panels

Main 6th Floor, 6B-130

135

1 Panels

Main 6th Floor, 6B-144

136

2 Panels

Main 6th Floor, 6C-100

137

1 Panels

Main 6th Floor, 6C-101

138

Bus Duct

Main 6th Floor, 6C-Elevators

139

10 Panels, 3 Disconnects & 5 VFDs

Main 7th Floor Penthouse

140

ATS # 43,44,45,46

Main 7th Floor Penthouse

141

MCC 71

Main 7th Floor Penthouse

142

2 Panels

Main 7th Floor Penthouse, AC-29

143

1 Panel & MCC 74

Main 7th Floor, 7B-100 Exhaust Fan Room

144

GE Sub Station

Main 7th Floor, 7C-107 Mechanical Roof

145

ATS # 14 & HVAC ATS

Main 7th Floor, 7C-102 Elevator Penthouse

146

Panels, MCC

Main 7th Floor, 7C-102 Elevator Penthouse

147

2 Panels

Cares A Floor, AF-193

148

6 Panels

Cares A Floor, AF-ELC1

149

7 Panels & Bus Duct

Cares A Floor, AF-ELC2

150

1 Panel

Cares A Floor, AF-LVC2

151

1 Disconnect Switch & 2 VFDs

Cares Basement, BF 192

152

Sub F1 & F2

Cares Basement, BF 193

153

3 Panels

Cares Basement, BF 193

154

7 Panels & Bus Duct

Cares Basement, BF-ELC1

155

10 Panels & Bus Duct

Cares Basement, BF-ELC2

156

1 Panel

Cares Basement, BF-LVC2

164

3 Disconnect Switches

Cares 1st Floor, FUT Card Elevator Eq. Room

165

5 Panels & Bus Duct

Cares 2nd Floor, 2F-ELC1

166

6 Panels & Bus Duct

Cares 2nd Floor, 2F-ELC2

167

1 Panel

Cares 2nd Floor, 2F-LVC2

168

ATS # 39,40,47

Cares 2nd Floor, 2F-501A Electrical Penthouse

169

11 Panels & 1 Disconnect Switch

Cares 2nd Floor, 2F-501A Electrical Penthouse

170

Lab Warehouse Sub

Cares 2nd Floor, 2F-501A Electrical Penthouse

171

2 Disconnect Switches

Cares 2nd Floor, 2F-501B Mechanical Penthouse

172

9 Disconnect Switches & 2 VFDs

Cares 2nd Floor, 2F-501C Mechanical Penthouse

173

ATS # 48

Cares 2nd Floor, 2F-501D Electrical Penthouse

174

3 Panels & 2 Disconnect Switches

Cares 2nd Floor, 2F-501D Electrical Penthouse

175

Pathology Sub

Cares 2nd Floor, 2F-501D Electrical Penthouse

176

8 Panels & Bus Duct

Cares 3rd Floor, 3F-ELC1

177

7 Panels & Bus Duct

Cares 3rd Floor, 3F-ELC2

178

1 Panel

Cares 3rd Floor, 3F-LVC2

179

6 Panels & Bus Duct

Cares 4th Floor, 4F-ELC1

180

7 Panels & Bus Duct

Cares 4th Floor, 4F-ELC2

181

1 Panel

Cares 4th Floor, 4F-LVC2

182

6 Panels & Bus Duct

Cares 5th Floor, 5F-ELC1

183

7 Panels & Bus Duct

Cares 5th Floor, 5F-ELC2

184

1 Panel

Cares 5th Floor, 5F-LVC2

185

Panels & Bus Duct

Cares 6th Floor, 6F-ELC1

186

Panels & Bus Duct

Cares 6th Floor, 6F-ELC2

187

1 Panel

Cares 6th Floor, 6F-LVC2

188

2 Disconnect Switches

Cares Penthouse, PF-102 Elevator Controls

189

14 Disconnect Switches & 15 VFDs

Cares Penthouse, PF-104

190

2 Panels

Cares Penthouse, PF-105

191

Sub F3 & F4

Cares Penthouse, PF-105

192

ATS # 37,38

Cares Penthouse, PF-105

193

8 Disconnect Switches

Cares Penthouse, PF-106

194

5 Panels

Sinai Skills Center, Room 116

195

2 Panels

Sinai Skills Center, 2nd Floor Restrooms

196

6 Panels

Parking Garages, 1C-703

197

3 Panels & 2 Disconnect Switches

Parking Garages, 1G 703 Electrical Eq. Room

198

2 Disconnect Switches

Parking Garages, 1G 702 Elevator Eq. Room

199

1 Panel, 4 Disconnect Switches

Parking Garages, 2C-703

200

4 Disconnect Switches

Parking Garages, 3C-703

201

3 Disconnect Switches

Parking Garages, 4C-703

202

Square D Switchgear

Parking Garages, 006 Main Electric Room

203

4 Panels & 1 Disconnect Switch

Parking Garages, 006 Main Electric Room

204

G/ATS 1

Parking Garages, 006 Main Electric Room

205

Eaton Switchgear & 2 Panels

Parking Garages, 006A Electric Room

206

7 Disconnect Switches

Parking Garages, 005A Elevator Mechanical

6. Deliverables:

Written Report

A complete written report of the work performed shall be provided to the VA within 7 days of completion.

Information shown in the report shall be as follows:

Company s name, addresses, telephone, & FAX numbers.

Name and signature of contractors who perform the maintenance and testing.

VA Work Contract Number, name and number of VA Contracting Officer.

Date and Time of work.

Copies of contractors valid licenses, professional and training certificates.

Descriptions and model number of specialized tools and equipment used, such as torque wrench or infra-red scanning camera.

Location, Type, Name, serial number, and nameplate information of electrical equipment to be maintained and tested.

Descriptions of work items.

Test data.

Reference materials such as equipment manufacturer s specifications, coordination study, etc.

Remarks on conditions of electrical equipment. List all deficiencies, if any.

Recommended corrective actions, if any.

Submit four (4) hard copies of the complete written report and emailed report to VA Contracting Officer Representative (COR) within seven (7) calendar days of visit.

All reference materials shall be included in the electronic version of the report, either through scanning or other means of electronic text import methods.

6.2 Awarded contractor shall submit a site-specific safety plan (SSSP) outlining how inspections and testing will safely be conducted. This safety plan will be submitted to VA safety department for approval. COR will provide SSSP packet to contractor for completion.

Contractor shall meet all timeline requirements outlined in this SOW.

SOW Task#

Deliverable Title

Format

Number

Calendar Days After Start

1

Site Specific Safety Plan

Word - PDF

100 %

>30 days

2

MV Substation Inspection Report

Email Word - Excel

100 %

>30 days

3

MV Control Power Batteries Report

Email Word Excel

100 %

>30 days

4

MV Substation Control Power Relay Testing Report

Email Word Excel

100 %

>30 days

5

Substation Transformer Testing Report

Email Word Excel

100 %

>30 days

6

Transformer Oil Sample Report

Email Word - Excel

100 %

>30 days

7

Circuit Breaker Testing Report

Email Word Excel

100 %

>30 days

8

Ground Resistance Testing Report

Email PDF - Excel

100 %

14 Days

9

IR Imagery Report

Email PDF Excel

100 %

14 Days

10

4 Hour Blackout Support

Email PDF Excel

100 %

14 Days

11

All items completed during scheduled timeframe

Email PDF Excel

95%

14 Days

7. Performance Monitoring

Prior to bidding, it shall be the responsibility of the bidder to visit Cleveland VAMC and inspect the equipment listed within this SOW and the facility to establish to their satisfaction the condition of the Electrical Power Distribution equipment to be maintained and any other conditions affecting the work to be performed. This equipment is offered in an "as-is" condition. No claim shall be allowed for correction of deficiencies claimed to exist prior to award of contract.

Quarterly meetings will be conducted with CO, COR, and contractor leadership.

Contractors shall be experienced Electrical Contractors, having properly trained and licensed permanent staff required to perform the proposed work. Electrical Contracting (i.e. the construction, repair, testing and maintenance of industrial and commercial electrical distribution systems) shall be the primary interest/specialty of the Contractor s business.

Contractors shall be certified by the International Electrical Testing Association (NETA) or equivalent certifying organization as Certified Technicians with each having completed the Occupational Safety & Health Administration (OSHA) approved 10-hour construction safety training.

Contractors shall have technical training and demonstrable track records of working experience in maintenance, inspection, and testing of the Electrical Power Distribution Systems and related components in healthcare, industrial, educational, and commercial facilities for a minimum of five (5) continuous years. Electrical components on which the Contractors have experience shall include, but not be limited to, switchboards & switchgear (low and medium voltage); low voltage controls; emergency and standby generators; automatic transfer switches, wiring, transformers, meters, and other electrical appurtenances.

Contractors shall have safety trainings either on-the-job or class-room type - in electrical safety outlined in the OSHA Standard 29 Code of Federal Regulations (CFR) 1910 Subpart S Electrical, and the NFPA 70E Standard for Electrical Safety in the Workplace. Training certification shall be provided indicating each technician is a Qualified Person as defined by NFPA 70E. Training certifications shall be submitted to the VA Contracting Officer prior to work. If no training certifications are available, the contractor Employer shall certify that he/she has met this requirement in writing, and submit it to the VA Contracting Officer prior to work.

Contractors shall have ready access to the latest versions of the following references:

NFPA 70, National Electrical Code.

NFPA 70B, Recommended Practice for Electrical Equipment Maintenance.

NFPA 70E, Standard for Electrical Safety for the Workplace.

NFPA 110, Standard for Emergency and Standby Power System.

OSHA Standard 29 CFR 1910, Subparts I & S.

International Electrical Testing Association, Inc. (NETA) Maintenance and Testing Specifications.

Operating/Maintenance manuals, and specifications of the electrical equipment to be maintained and tested. These documents may be obtained from the VHA Medical Center, or the equipment manufacturers.

VHA Directive [2006-056][1028], Electrical Power Distribution System

Contractors shall have and provide all necessary tools, equipment, and Personal Protective Equipment (PPE) to perform the work safely, effectively, and timely. Tools, equipment, and PPE shall comply with the requirements of OSHA Standard 29 CFR 1910, Subpart I, and NFPA 70E. Prior to initiating work, Contractor shall provide documentation that all instruments, test equipment, tools and PPE have current calibration. Dated calibration labels shall be visible on all instruments, test equipment, tools and PPE as appropriate.

Quality Control : The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this SOW. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor s quality control program is the means by which he assures himself that his work complies with the requirement of the contract. After acceptance of the quality control plan the contractor shall receive the contracting officer s acceptance in writing of any proposed change to his QC system.

Quality Assurance: The government shall evaluate the contractor s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).

Hours of Operation: The contractor is responsible for conducting business, between the hours of 7 a.m. to 11:30 p.m. Monday thru Friday or Saturday and Sunday 6 a.m. 6 p.m. when maintenance requires electrical power interruption, except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this SOW when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor should keep in mind that the stability and continuity of the workforce are essential.

Work is not to be performed during federal holidays without prior approval of the COR.

New Year s Day

Labor Day

Martin Luther King Jr. s Birthday

Columbus Day

President s Day

Veteran s Day

Memorial Day

Thanksgiving Day

Independence Day

Christmas Day

Juneteenth

The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between 8:00 a.m. to 4:30 p.m., Monday through Friday except Federal holidays or when the government facility is closed for administrative reasons.

Check In Requirements:

The Contractor Service Personnel and/or representative must report to the Electric Shop Supervisor within the engineering department or designated point of contact (POC) to sign with department staff before work begins. Upon completion of work, the Contractor Service Personnel and/or representative must report to the appropriate department to sign out.

Parking: Onsite parking is not available, and all contractor personnel will be required to obtain street side parking.

Security Requirements: The C&A requirements do not apply, and a Security Accreditation Package is not required.

Dedicated personnel will be assigned solely to observe, interact, assist, and assure protection of VA sensitive information.

Contractor employees providing services at VA facilities may undergo a security clearance in the form of a basic background investigation.Â

11. General Security: Contractors, contractor personnel, subcontractors, and subcontractor personnel shall be subject to the same Federal laws, regulations, standards, and VA Directives and Handbooks as VA and VA personnel regarding information and information system security.

VA Information Custodial Language:

Information made available to the contractor or subcontractor by VA for the performance or administration of this contract or information developed by the contractor/subcontractor in performance or administration of the contract shall be used only for those purposes and shall not be used in any other way without the prior written agreement of the VA. This clause expressly limits the contractor/subcontractor's rights to use data as described in Rights in Data - General, FAR 52.227-14(d) (1).

The contractor/subcontractor must store, transport, or transmit VA sensitive information in an encrypted form, using VA-approved encryption tools that are, at a minimum, FIPS 140-2 validated.

Government-Furnished Equipment (GFE)/Government-Furnished Information (GFI).

No GFE will be issued to complete the requirements of this contract.

Other Pertinent Information or Special Considerations.

Prior to bidding, it shall be the responsibility of the bidder to visit the job site and inspect facility equipment listed in this SOW to establish to their satisfaction the condition of the equipment to be maintained and any other conditions affecting the work to be performed. This equipment is offered in an "as-is" condition. No claim shall be allowed for correction of deficiencies claimed to exist prior to award of contract.

Contractor shall be currently engaged in maintenance, repair, inspection, and testing of electrical power distribution equipment. Contractor shall have a minimum of five (5) years within the last seven (7) years of successful experience maintaining power distribution equipment identical or similar to the equipment listed in this Contract SOW.

Offerors shall submit references for the five (5) years of experience including names, addresses, and telephone numbers of specific companies and key personnel to contact.

The Contractor shall provide a Contract Manager who shall be responsible for the performance of the work. The name of the Contract manager and an alternate shall be designated in writing to the CO/COR prior to the Contract start date. Changes to personnel shall be submitted to the Government within five (5) work days of the changes.

The Contract Manager or alternate shall have full authority to act on all Contract matters relating to the daily operation of the Contract. The Contract Manager or alternate shall be available to speak/meet with the CO or COR within 24 hours of request during normal operating hours, and or within the next business day after Friday or a Federal holiday.

Identification of Possible Follow-on Work. Any additional repair or replacement work required outside this contract will require contractor to submit a quote to COR and receive an approved PO before beginning work.

Identification of Potential Conflicts of Interest (COI).

None

Identification of Non-Disclosure Requirements.

Not Applicable

Packaging, Packing and Shipping Instructions.

None

Inspection and Acceptance Criteria.

Contractor will be responsible for meeting timelines listed in this SOW to include monthly inspection, inspection reports, and response to service call.

15. Risk Control

Work performed within the medical center may present health risks including exposure to illness and infection control. Contractor will take action to recognize and follow warning information throughout the facility.

16. Place of Performance.

Work will be performed at

Louis Stokes VA Medical Center

10701 East Blvd

Cleveland, Ohio

44106

17. Period of Performance.

Base Year: November 1, 2026 through October 31, 2027

Option Year One: November 1, 2027 through October 31, 2028

Option Year Two: November 1, 2028 through October 31, 2029

Option Year Three: November 1, 2029 through October 31, 2030

Option Year Four: November 1, 2030 through October 31, 2031

18. Point of Contact

TBD

The NAICS code for this procurement is 238210 Electrical Contractors and Other Wiring Installation Contractors and the small business size standard is $19,000,000.00.

Responses to this notice shall be e-mailed to Christopher A. Callihan at christopher.callihan@va.gov. Telephone responses will not be accepted. Responses must be received in writing no later than 3:00 p.m., Wednesday, June 17, 2026. This notice is to assist the VA in determining sources only. A solicitation is not currently available.

THE VA IS NOT SEEKING PRICING OR OFFERS OF ANY KIND. There is no guarantee, expressed or implicit, that the market research for this acquisition will result in a particular set-aside or sole source award, or any other guarantee of award strategy. All information is to be provided on a voluntary basis at no charge to the Government.

Files

File Type Posted
36C25026Q0634.docx DOCX document

Similar open opportunities

Opportunity Agency Set-aside Responses due
J059--FY27 Electrical Test and Calibrations Department of Veterans Affairs Syracuse VA Medical Center Syracuse NY 13210 · NAICS 238210 Veterans Integrated Service Network 2 No set-aside
J061--triennial electrical maintenance - amendment 4 POP: 12/01/2026 - 11/30/2027 plus 4 option years Slvhcs New Orleans, Louisiana 70119, United States · NAICS 238210 Veterans Integrated Service Network 16 Service-Disabled Veteran-Owned Small Business
J059--Tri-Annual PM & Testing of Switch Gears - Base Year NAICS 238210 Veterans Integrated Service Network 22 No set-aside
J061--electrical testing (pre-solicitation) Department of Veterans Affairs Hampton VA Medical Center Hampton, Virginia 23667, United States · NAICS 238210 Veterans Integrated Service Network 6 Total Small Business
36-Month Electrical Distribution Testing Georgia 30033, United States · NAICS 221122 Veterans Integrated Service Network 7 Service-Disabled Veteran-Owned Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors