J045--Repair Boilers #2 and #3 White City SORCC

Closed Solicitation Posted

Solicitation number
36C26025Q0851
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
White City Sorcc 8495 Crater Lake Hwy

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of Veterans Affairs Veterans Health Administration, Veterans Integrated Service Network 20, is soliciting comprehensive repair services for Boilers #2 and #3 at the White City Southern Oregon Rehabilitation Center and Clinics (SORCC) facility. The scope of work includes removing and reinstalling burners, replacing damaged or stripped studs, repairing refractory materials, and ensuring burner functionality on both natural gas and #2 fuel oil, along with providing a full report of findings and recommendations. Critical contract requirements mandate that all welding be performed by or supervised by a Licensed Boiler Maker and all electrical work be completed by a Licensed Electrician, with documentation of licensing and factory training required prior to work commencement. The applicable NAICS code is 238220 (Plumbing, Heating, and Air-Conditioning Contractors) with PSC code J045. The solicitation response deadline is October 28, 2025, at 12:00 PM Pacific Time, with a mandatory site visit held on October 24, 2025, at 10:00 AM at Building 229, where potential bidders should request Trevor or Stephen for facility access.

This solicitation carries no set-aside designation and is unrestricted. The estimated performance period is 30–45 days, with final timeline specifications to be provided upon formal solicitation issuance. Work will be performed on a Superior Model 7-X-1250 Boiler (#2 Boiler) manufactured in 2019 and two Webster Cyclonetic burners, located at the White City SORCC facility at 8495 Crater Lake Highway, White City, Oregon 97503. Contractor compensation will be subject to Department of Labor wage determinations for Jackson County, Oregon, requiring minimum hourly rates of at least $17.75 per hour plus fringe benefits of $5.55 per hour for health and welfare, in addition to paid leave provisions. No incumbent contractor or specific award value has been identified in the available solicitation documents.

Notice text

2 versions

Update #2 · Latest ·

SITE VISIT: 10/24/2025 @ 10AM Pacific, White City SORCC Bldg. 229 - ask for Trevor or Stephen

Project Summary: The consultant shall supply all labor, material and equipment to: Remove Burner from Burner Mounting Ring, Remove Burner Blast Tube from Burner, Remove Windbox Cover from right hand side of Blast Tube, Replace any Broken Stripped or damaged studs, Replace Windbox cover with new Fender and Lock Washers and install Brass Nuts, Remove Burner Mounting Ring from Boiler, Replace broken and stripped studs on the mounting ring of the Morrison Tube for #2 Boiler. Re-install Burner Mounting Ring with new finder washers and lock washers and install new brass nuts. Repair refractory damaged in Burner Mounting ring removal. Re-install Burner Mounting Ring with new Gaskets, replace Refractory seal for Burner Mounting ring. Re-install Burner Blast Tube with new gaskets, reattach burner and re-install all piping and electrical connections removed during disassembly. Ensure Burner fires on both Natural Gas and #2 Fuel Oil. Provide any refractory curing requirements. Additional Studs to be Replaced on #3 Boiler windbox access cover while onsite. Work to be performed at the Southern Oregon Rehabilitation Center and Clinics White City Oregon VAMC Boiler Plant. The work shall be documented in a full report of findings and recommendations. All Welding must be performed by or Supervised by a Licensed Boiler Maker. All Electrical work to be performed by a Licensed Electrician. Copies of licensing and factory training will be required prior to starting work. Work will be done on the Equipment listed below. #2 Boiler Superior Model 7-X-1250 National Board # 19030 Year Built 2019 #2 Burner Webster Cyclonetic Model # JBEX5C-75-K-(****).M.(**)-MA-NFPS-85 Serial # 130478A-01 #3 Burner Webster Cyclonetic Model # JBEX5C-75-K-(****).M.(**)-MA-NFPS-85 Serial # 130478A-02 The period of performance is estimated at 30-45 days, but a final period of performance will be provided in a solicitation if one is issued.

Update #1 ·

Project Summary: The consultant shall supply all labor, material and equipment to: Remove Burner from Burner Mounting Ring, Remove Burner Blast Tube from Burner, Remove Windbox Cover from right hand side of Blast Tube, Replace any Broken Stripped or damaged studs, Replace Windbox cover with new Fender and Lock Washers and install Brass Nuts, Remove Burner Mounting Ring from Boiler, Replace broken and stripped studs on the mounting ring of the Morrison Tube for #2 Boiler. Re-install Burner Mounting Ring with new finder washers and lock washers and install new brass nuts. Repair refractory damaged in Burner Mounting ring removal. Re-install Burner Mounting Ring with new Gaskets, replace Refractory seal for Burner Mounting ring. Re-install Burner Blast Tube with new gaskets, reattach burner and re-install all piping and electrical connections removed during disassembly. Ensure Burner fires on both Natural Gas and #2 Fuel Oil. Provide any refractory curing requirements. Additional Studs to be Replaced on #3 Boiler windbox access cover while onsite. Work to be performed at the Southern Oregon Rehabilitation Center and Clinics White City Oregon VAMC Boiler Plant. The work shall be documented in a full report of findings and recommendations. All Welding must be performed by or Supervised by a Licensed Boiler Maker. All Electrical work to be performed by a Licensed Electrician. Copies of licensing and factory training will be required prior to starting work. Work will be done on the Equipment listed below. #2 Boiler Superior Model 7-X-1250 National Board # 19030 Year Built 2019 #2 Burner Webster Cyclonetic Model # JBEX5C-75-K-(****).M.(**)-MA-NFPS-85 Serial # 130478A-01 #3 Burner Webster Cyclonetic Model # JBEX5C-75-K-(****).M.(**)-MA-NFPS-85 Serial # 130478A-02 The period of performance is estimated at 30-45 days, but a final period of performance will be provided in a solicitation if one is issued.

Files

File Type Posted
Attachment 1 - Boiler Site Walk sign in 10.24.25.pdf PDF
36C26025Q0851 0002.docx DOCX document
36C26025Q0851 0001.docx DOCX document
36C26025Q0851_3.docx DOCX document
WD 2015-5571 7.8.25.pdf PDF

Notice history

Notice Type Posted
This notice Latest solicitation Solicitation
J045--Repair Boilers #2 and #3 Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
White City, Oregon, Boiler Inspection Services Solicitation Base Year + Four Option Years (offers are now due on 11/13/2026) White City, Oregon 97503, United States · NAICS 561210 Veterans Integrated Service Network 20 Service-Disabled Veteran-Owned Small Business
Boiler Plant O2 Sensor Replacement White City, Oregon 97503, United States · NAICS 334513 Veterans Integrated Service Network 20 Total Small Business
J041--White City B249 SE HVAC Repair Department of Veterans Affairs Va Sorcc White City, Oregon 97503, United States · NAICS 238220 Veterans Integrated Service Network 20 Service-Disabled Veteran-Owned Small Business
Z1DA--550-20-121 Demo Old Boiler Plant B100 (CON) NAICS 236220 Veterans Integrated Service Network 12 No set-aside
16292 Steam Boiler Replacement Hill AFB, Utah 84056, United States · NAICS 238220 Air Force Sustainment Center Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors