ISD-341872-DH - Renovations of Fermilab’s Dorm 4 in “The Village”
Closed Solicitation Posted
- Solicitation number
- ISD-341872-DH
- Agency
-
Fermi National Accelerator Laboratory
Office of Science, Department of Energy
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236118 Residential Remodelers
- PSC
- 5680 Miscellaneous Construction Materials
- Place of performance
- Batavia, Illinois 60510, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of Energy's Fermi National Accelerator Laboratory (Fermilab) is seeking contractors to perform renovations to Dorm 4 in "The Village" at its facility in Batavia, Illinois. The scope of work includes replacing the drop ceiling, installing new attic hatches, LED lighting, flooring (carpet tiles and vinyl planks), painting, bathroom upgrades, kitchen countertop and fixture replacements, and exterior lighting and door replacements. Proposals will be evaluated on a Lowest Price Technically Acceptable basis, and offerors must provide details on their experience, past projects, safety plans, and key personnel. Proposals are due by November 8, 2024, and a site visit is scheduled for October 4, 2024. Bidders will be required to provide bid, payment, and performance bonds, and the work will be subject to the Davis-Bacon Act.
This is a small business set-aside solicitation under NAICS code 236220 - Commercial and Institutional Building Construction, with a $45 million size standard. No incumbent contractor information is provided. The anticipated award value is not specified, but the project involves renovations to a single dormitory building at Fermilab's campus. Work must be performed at the Batavia, Illinois location.
Notice text
Dorm 4 in the Village needs updating, below are the proposed upgrades.
- Replace the existing decrepit drop ceiling with a drywall ceiling matching the rest of the dorm.
- New Attic Hatches to be installed in the main hallways where the old rusty existing ones are.
- New LED Fixtures to be installed throughout the dorm.
- New (Fermilab supplied) Carpet Tiles will replace throughout where the old existing carpet is located.
- Vinyl Plank Flooring to be installed at the Front Door Entrance, Kitchen, Dining Room, and Bathrooms.
- Interior Walls, Ceilings and Kitchen Cabinets will be painted. (Walls to be Light French Grey, Ceiling to
be White and Cabinets to get painted a Darker Grey).
- Bathrooms to have FRP installed on ceiling and walls to mitigate excess moisture.
- Bathrooms to receive new Toilets, Vanities, Mirrors, Tub/Shower Enclosure, Faucets and LED Fan/Light
Combo.
- Kitchen to receive new Laminate Countertops, new Stainless Steel Kitchen Sink and new double
handle Faucet with side sprayer.
- Exterior Lighting to be updated to LED Fixtures throughout.
- New Exterior Doors to be installed WITHOUT storm doors at the entrance/exit locations. (3) in total.
Files
Show all 16
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB | Fermi National Accelerator Laboratory | No set-aside | |
| Wilson Hall Floor 16 Electric and Elevator Machine Rooms Fire Rating and Mechanical Upgrade | Fermi National Accelerator Laboratory | Total Small Business | |
| Kautz road substation construcion, UIP subproject 2- KRS | Fermi National Accelerator Laboratory | No set-aside | |
| PIP-II F-37 building LWC pump room piping system installation | Fermi National Accelerator Laboratory | No set-aside | |
| Utility excavation and repair services IDIQ | Fermi National Accelerator Laboratory | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity