ISD-341872-DH - Renovations of Fermilab’s Dorm 4 in “The Village”

Closed Solicitation Posted

Solicitation number
ISD-341872-DH
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
236118 Residential Remodelers
Place of performance
Batavia, Illinois 60510, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of Energy's Fermi National Accelerator Laboratory (Fermilab) is seeking contractors to perform renovations to Dorm 4 in "The Village" at its facility in Batavia, Illinois. The scope of work includes replacing the drop ceiling, installing new attic hatches, LED lighting, flooring (carpet tiles and vinyl planks), painting, bathroom upgrades, kitchen countertop and fixture replacements, and exterior lighting and door replacements. Proposals will be evaluated on a Lowest Price Technically Acceptable basis, and offerors must provide details on their experience, past projects, safety plans, and key personnel. Proposals are due by November 8, 2024, and a site visit is scheduled for October 4, 2024. Bidders will be required to provide bid, payment, and performance bonds, and the work will be subject to the Davis-Bacon Act.

This is a small business set-aside solicitation under NAICS code 236220 - Commercial and Institutional Building Construction, with a $45 million size standard. No incumbent contractor information is provided. The anticipated award value is not specified, but the project involves renovations to a single dormitory building at Fermilab's campus. Work must be performed at the Batavia, Illinois location.

Notice text

Dorm 4 in the Village needs updating, below are the proposed upgrades.

- Replace the existing decrepit drop ceiling with a drywall ceiling matching the rest of the dorm.
- New Attic Hatches to be installed in the main hallways where the old rusty existing ones are.
- New LED Fixtures to be installed throughout the dorm.
- New (Fermilab supplied) Carpet Tiles will replace throughout where the old existing carpet is located.
- Vinyl Plank Flooring to be installed at the Front Door Entrance, Kitchen, Dining Room, and Bathrooms.
- Interior Walls, Ceilings and Kitchen Cabinets will be painted. (Walls to be Light French Grey, Ceiling to
be White and Cabinets to get painted a Darker Grey).
- Bathrooms to have FRP installed on ceiling and walls to mitigate excess moisture.
- Bathrooms to receive new Toilets, Vanities, Mirrors, Tub/Shower Enclosure, Faucets and LED Fan/Light
Combo.
- Kitchen to receive new Laminate Countertops, new Stainless Steel Kitchen Sink and new double
handle Faucet with side sprayer.
- Exterior Lighting to be updated to LED Fixtures throughout.
- New Exterior Doors to be installed WITHOUT storm doors at the entrance/exit locations. (3) in total.

Files

Show all 16

Similar open opportunities

Opportunity Agency Set-aside Responses due
Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB Batavia, Illinois 60510, United States · NAICS 236210 Fermi National Accelerator Laboratory No set-aside
Wilson Hall Floor 16 Electric and Elevator Machine Rooms Fire Rating and Mechanical Upgrade Illinois 60510, United States · NAICS 236220 Fermi National Accelerator Laboratory Total Small Business
Kautz road substation construcion, UIP subproject 2- KRS Batavia, Illinois 60510, United States · NAICS 237130 Fermi National Accelerator Laboratory No set-aside
PIP-II F-37 building LWC pump room piping system installation Batavia, Illinois 60510, United States · NAICS 23822 Fermi National Accelerator Laboratory No set-aside
Utility excavation and repair services IDIQ Batavia, Illinois 60510, United States · NAICS 238910 Fermi National Accelerator Laboratory Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors