Iron fire baldwin/gerber fence contract
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 140L1725Q0063
- Agency
- Colorado Region Bureau of Land Management, Department of the Interior
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238990 All Other Specialty Trade Contractors
- Points of contact
-
- Chau Nguyen cnguyen@blm.gov (303) 239-3678
Notice details come from SAM.gov. Updated .
About this opportunity
The Bureau of Land Management Colorado Region is seeking fence replacement services for the Iron Fire Baldwin/Gerber project, which involves removing 2 miles of burnt, non-functional fencing and reconstructing it with woven wire and barbed wire approximately 19 miles northwest of Craig, Colorado. The project requires specific materials including 12-gauge barbed and barbless wire, 5-foot steel T-posts spaced at 15-foot intervals, 32-inch woven field fence, treated wood posts for line and H-brace applications, and installation of two 12-foot wire gates. Contractors must demonstrate technical capability through detailed execution plans, past government experience with similar fencing projects, and provide references for evaluation. The government will evaluate quotes based on technical capability, past performance, and price, with technical and past performance weighted significantly more important than price using a grading scale of Exceeds, Meets, or Does Not Meet. Amendment 001 extended the original due date, with offers now due September 18, 2025, at 5:00 PM Mountain Time, and the period of performance extending from September 23, 2025, to July 1, 2026.
This procurement is designated as a Total Small Business Set-Aside under NAICS code 238990 (All Other Specialty Trade Contractors) with a size standard of $19 million, and no incumbent contractors are identified in the solicitation documents. The rough order of magnitude for the contract value ranges between $25,000 and $100,000, with additional requirements including Davis-Bacon prevailing wages for Moffat County and 100% payment bonding of the awarded amount. The work must be performed during restricted hours from 7:00 AM to 4:00 PM with no weekend or holiday work allowed, and contractors must comply with fire danger season regulations during performance. Key deliverables include removing existing damaged fencing, installing approximately 2 miles of new agricultural fencing suitable for cattle and sheep, and ensuring proper drainage specifications are met in flood-prone areas. The contracting office is located at the BLM Colorado State Office in Denver, with Chau Nguyen serving as the Contracting Officer and Martin Martinez as the Contracting Officer's Representative.
Notice text
2 versions
Update #2 · Latest ·
BLM-CO IRON FIRE BALDWIN/GERBER FENCE REPLACEMENT- Amendment 001 to answer questions that were asked.
Basic Contracting Requirements:
1. Active Registration: www.sam.gov/SAM
2. Invoicing and Payment: www.ipp.gov - 14-day prompt pay after delivery. We can accept and pay progress payments
3. FAR Part 13 - Simplified Acquisition Procedures
4. FAR Part 36 - Construction
5. Davis Bacon Wages for Moffat County
6. Payment Bonding Required- 100% of Awarded Amount
7. Total Small Business Set-Aside for NAICS 238990 - Size Std - $19M
8. Award will be made to the responsible firm whose quote is most advantageous and Best Value to the Government using Price and Other Factors. Vendors are required to submit the following information or will be rated non-responsive:
1. Technical approach to performing the work
a. Provide technical narrative of execution plan in the quote package
b. Identify planned equipment and construction schedule
2. Past Government Experience
a. Describe past experience with government agencies and fencing projects of similar size and scope; please provide references.
3. Past Performance
a. The Government may, at its discretion, base past performance on past knowledge and previous experience with the contractor, supply or service being provided, customer survey or other reasonable basis.
4. Price
a. Please provide the total price for the project.
Technical and Past Performance are significantly more important than price. However, price will be a factor. The Government will evaluate quotes submitted in response to this solicitation in accordance with the factors listed below:
1. Technical Capability/Requirements (Graded as: Exceeds, Meets, Does Not Meet)
a. Technical Capability will be assessed based on the proposer's demonstrated experience providing services of similar size and scope. The tailored technical response must include how and when the contractor will provide the necessary labor, supervision, quality control, tools, equipment, and supplies. A generic or boilerplate technical response with no specific details will be graded as "does not meet". A proposal that demonstrates the aforementioned capabilities will be graded as Meets or Exceeds. The contractor must demonstrate qualifications and experience of the specific key personnel (supervisor and/or foreman) to provide these services.
b. Past Experience that shows more relevancy, recency will be graded higher on the scale.
2. Past Performance
(Graded on a confidence scale: Confidence, Neutral Confidence, No Confidence)
Government shall utilize information obtained from the Past Performance Information Retrieval System (CPARS), Federal Awardee Performance and Integrity Information System (FAPIIS) when evaluating the offeror's past performance. If sufficient past performance information is not available, vendor may be asked to provide contact information for past performance references.
3. Price
Prices will be revealed to the Technical Evaluation Board after other factors are graded.
The Government reserves the right to hold discussions.
(b) For the purpose of initial evaluation of quotations, the following procedures will be utilized in resolving arithmetic discrepancies found on the face of the schedule as submitted by quoters:
(i) In case of discrepancy between unit price and extended price, the unit price will govern;
(ii) Obviously misplaced decimal points will be corrected;
(iii) Apparent errors in extension of unit prices will be corrected; and
(iv) Apparent errors in addition of lump-sum and extended prices will be corrected.
(c) The Government reserves the right to award without discussions as well as the right to hold discussions. If discussions are held, they will be held with all quoters if the Government makes a major change in specifications or terms and conditions. Discussions may be conducted with the firm submitting the lowest priced quotation if price only is discussed.
Rough Order of Magnitude:
Between $25,000 and $100,000
Instructions to Offerors:
- Check your SAM registration, this must be current at the time you make your offer.
- Please email or call with any questions you have, prior to the closing date, with enough time to research an answer.
- Email your signed quote package to: kspetter@blm.gov, with " 140L1725Q0063 Baldwin/Gerber Fence Replacement" in the subject line, no later than the closing date. Include your UEI number on your quote.
- You may put your prices on the SF-18 form itself.
- Include enough description/information in order to determine technical acceptability.
- Offers are due September 17, 2025 not later than 17:00 hrs (5:00 PM) Mountain Time (MT).
Attachments:
Attachment 1 A04 Iron Fire BaldwinGerber Fence_SOW
Attachment 2 A06 Baldwin Gerber Fence Spec
Attachment 3 A06 Baldwin Gerber Fence Site
Attachment 4 A06 Baldwin Gerber Fence Transport
Attachment 5 B03 Wage Determination
Update #1 ·
BLM-CO IRON FIRE BALDWIN/GERBER FENCE REPLACEMENT
Basic Contracting Requirements:
1. Active Registration: www.sam.gov/SAM
2. Invoicing and Payment: www.ipp.gov - 14-day prompt pay after delivery. We can accept and pay progress payments
3. FAR Part 13 - Simplified Acquisition Procedures
4. FAR Part 36 - Construction
5. Davis Bacon Wages for Moffat County
6. Payment Bonding Required- 100% of Awarded Amount
7. Total Small Business Set-Aside for NAICS 238990 - Size Std - $19M
8. Award will be made to the responsible firm whose quote is most advantageous and Best Value to the Government using Price and Other Factors. Vendors are required to submit the following information or will be rated non-responsive:
1. Technical approach to performing the work
a. Provide technical narrative of execution plan in the quote package
b. Identify planned equipment and construction schedule
2. Past Government Experience
a. Describe past experience with government agencies and fencing projects of similar size and scope; please provide references.
3. Past Performance
a. The Government may, at its discretion, base past performance on past knowledge and previous experience with the contractor, supply or service being provided, customer survey or other reasonable basis.
4. Price
a. Please provide the total price for the project.
Technical and Past Performance are significantly more important than price. However, price will be a factor. The Government will evaluate quotes submitted in response to this solicitation in accordance with the factors listed below:
1. Technical Capability/Requirements (Graded as: Exceeds, Meets, Does Not Meet)
a. Technical Capability will be assessed based on the proposer's demonstrated experience providing services of similar size and scope. The tailored technical response must include how and when the contractor will provide the necessary labor, supervision, quality control, tools, equipment, and supplies. A generic or boilerplate technical response with no specific details will be graded as "does not meet". A proposal that demonstrates the aforementioned capabilities will be graded as Meets or Exceeds. The contractor must demonstrate qualifications and experience of the specific key personnel (supervisor and/or foreman) to provide these services.
b. Past Experience that shows more relevancy, recency will be graded higher on the scale.
2. Past Performance
(Graded on a confidence scale: Confidence, Neutral Confidence, No Confidence)
Government shall utilize information obtained from the Past Performance Information Retrieval System (CPARS), Federal Awardee Performance and Integrity Information System (FAPIIS) when evaluating the offeror's past performance. If sufficient past performance information is not available, vendor may be asked to provide contact information for past performance references.
3. Price
Prices will be revealed to the Technical Evaluation Board after other factors are graded.
The Government reserves the right to hold discussions.
(b) For the purpose of initial evaluation of quotations, the following procedures will be utilized in resolving arithmetic discrepancies found on the face of the schedule as submitted by quoters:
(i) In case of discrepancy between unit price and extended price, the unit price will govern;
(ii) Obviously misplaced decimal points will be corrected;
(iii) Apparent errors in extension of unit prices will be corrected; and
(iv) Apparent errors in addition of lump-sum and extended prices will be corrected.
(c) The Government reserves the right to award without discussions as well as the right to hold discussions. If discussions are held, they will be held with all quoters if the Government makes a major change in specifications or terms and conditions. Discussions may be conducted with the firm submitting the lowest priced quotation if price only is discussed.
Rough Order of Magnitude:
Between $25,000 and $100,000
Instructions to Offerors:
- Check your SAM registration, this must be current at the time you make your offer.
- Please email or call with any questions you have, prior to the closing date, with enough time to research an answer.
- Email your signed quote package to: kspetter@blm.gov, with " 140L1725Q0063 Baldwin/Gerber Fence Replacement" in the subject line, no later than the closing date. Include your UEI number on your quote.
- You may put your prices on the SF-18 form itself.
- Include enough description/information in order to determine technical acceptability.
- Offers are due September 17, 2025 not later than 17:00 hrs (5:00 PM) Mountain Time (MT).
Attachments:
Attachment 1 A04 Iron Fire BaldwinGerber Fence_SOW
Attachment 2 A06 Baldwin Gerber Fence Spec
Attachment 3 A06 Baldwin Gerber Fence Site
Attachment 4 A06 Baldwin Gerber Fence Transport
Attachment 5 B03 Wage Determination
Attachments
| File | Type | Posted |
|---|---|---|
| Sol_140L1725Q0063_Amd_0001.pdf | ||
| A06_Fence_drainage_spec_0001.pdf | ||
| A06_-_Additional_Terms_Conditions_and_Information.docx | DOCX document | |
| A06_Baldwin-Gerber_fence_spec.pdf | ||
| B03_Wage_Determination.pdf | ||
| A04_Iron_Fire_BaldwinGerber_fence_SOW.doc | DOC document | |
| A06_Baldwin_Fence_Transport.pdf | ||
| Sol_140L1725Q0063.pdf | ||
| A06_Baldwin_Fence_Site.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| BLM-CO iron fire baldwin/gerber fence replacement | Award Notice | |
| Iron fire baldwin/gerber fence contract | Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity