Installation of Washer and Dryer in Greenhouse

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
12639526Q0143
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Gastonia, North Carolina 28054, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The USDA Animal and Plant Health Inspection Service seeks installation of a stacked washer and dryer unit at its AMS Science & Technology Program greenhouse facility in Gastonia, North Carolina, with quotes due June 10, 2026. The procurement is a Total Small Business Set-Aside with an estimated project magnitude under $25,000 and no bonds required.

The scope includes supply and installation of a Samsung-compatible stacking kit for the government-furnished frontload washer and dryer set, removal and installation of utility sinks, reconfiguration of existing plumbing, and new electrical, ventilation, and structural modifications along an exterior wall in the greenhouse entryway. The contractor must provide all labor, tools, equipment, materials, transportation, permits, and incidentals. Work includes a new 230VAC single-phase electrical circuit for the dryer (not exceeding 30 feet run length) complying with the National Electrical Code, a 2-inch plumbing drain washer box with PEX hot and cold supply lines, installation of a 120VAC single-phase 6-gallon tank-type water heater, cinder block wall demolition to access the existing drain line, dryer exhaust venting with exterior weatherproof cover and core-drilled vent hole, and site cleanup with waste removal. The contractor must coordinate facility entry during normal business hours (Monday through Friday, 7 a.m. to 5 p.m.) or at coordinated evenings and weekends with the government point of contact.

Work must commence within five calendar days of the notice to proceed and complete within 45 days. Federal construction wage rates for Gaston County apply. Questions are due June 5, 2026, at noon CT. A site visit occurred May 27, 2026. Award will be made on firm-fixed-price basis to the lowest-priced, technically acceptable quoter with acceptable or neutral past performance. The NAICS code is 238220, Plumbing, Heating, and Air-Conditioning Contractors. Quotes must include demonstration of relevant plumbing and electrical experience and past performance references with specific contract numbers, project titles, locations, award/completion dates, and contact information.

Notice text

4 versions

Update #4 · Latest ·

The AMS Science & Technology Program operates a greenhouse facility requiring the installation of a stacked washer and dryer to support laboratory and operational needs. The program already owns a Samsung front‑load washer and dryer set, which is compatible with stackable installation. A stacking kit needs to be supplied and installed as part of the project.  The installation area is located along an exterior wall in the greenhouse entryway.  Existing plumbing must be reconfigured, and new electrical, ventilation, and structural modifications are required.

Two sets of photos are posted below.

RFIs posted below.

Site visit attendance sheet posted below.

Update #3 ·

The AMS Science & Technology Program operates a greenhouse facility requiring the installation of a stacked washer and dryer to support laboratory and operational needs. The program already owns a Samsung front‑load washer and dryer set, which is compatible with stackable installation. A stacking kit needs to be supplied and installed as part of the project.  The installation area is located along an exterior wall in the greenhouse entryway.  Existing plumbing must be reconfigured, and new electrical, ventilation, and structural modifications are required.

Two sets of photos are posted below.

RFIs posted below.

Update #2 ·

The AMS Science & Technology Program operates a greenhouse facility requiring the installation of a stacked washer and dryer to support laboratory and operational needs. The program already owns a Samsung front‑load washer and dryer set, which is compatible with stackable installation. A stacking kit needs to be supplied and installed as part of the project.  The installation area is located along an exterior wall in the greenhouse entryway.  Existing plumbing must be reconfigured, and new electrical, ventilation, and structural modifications are required.

Two sets of photos are posted below.

Update #1 ·

The AMS Science & Technology Program operates a greenhouse facility requiring the installation of a stacked washer and dryer to support laboratory and operational needs. The program already owns a Samsung front‑load washer and dryer set, which is compatible with stackable installation. A stacking kit needs to be supplied and installed as part of the project.  The installation area is located along an exterior wall in the greenhouse entryway.  Existing plumbing must be reconfigured, and new electrical, ventilation, and structural modifications are required.

Files

File Type Posted
Site visit attendance.pdf PDF
RFIs and responses.docx DOCX document
Photos 2.pdf PDF
Photos 1.pdf PDF
12639526Q0143.docx DOCX document
Attachment 2_Federal Construction Wage Rates_Gaston County.txt TXT text file
Attachment 1_Statement of Work.docx DOCX document

Notice history

Notice Type Posted
Installation of Washer and Dryer in Greenhouse Award Award Notice
This notice Latest solicitation Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Washer/Dryer Lease and Maintenance, Naval Submarine Base (NSB), Kings Bay, GA Kings Bay, Georgia 31547, United States · NAICS 532210 Naval Supply Systems Command Total Small Business
Washer-dryer, househol Construction and Equipment Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors