Installation of Thirteen (13) Aircraft Hangar Deadbolt Locking Systems

Closed Solicitation Posted

Solicitation number
FA8224-20-Q-0033
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
238190 Other Foundation, Structure, and Building Exterior Contractors
PSC
5680 Miscellaneous Construction Materials
Place of performance
Hill Afb Ut 84056 USA

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

The closing date of this solicitation is hereby extended to 11 May 2020, 11:00 am Mountain Time.

Fabrication and installation of thirteen (13) aircraft hangar door deadbolt locking systems for the Ogden Air Logistics (OO-ALC) 309 Aircraft Maintenance Group (AMXG) at Hill Air Force Base, Utah.  Locking system shall prevent hangar door from opening with less than 500 lbs of external force when locked, but the bolt shall be frangible and fail when exposed to greater than 500 lbs of external opening force.  For reference images of an existing aircraft hangar door deadbolt locking system are included.  Contractor shall be responsible for providing six (6) months of support after the deadbolt locking systems are installed, whereby Contractor shall replace bolts and/or bolt assemblies when they become unserviceable.  Additional information regarding this requirement is outlined in the attached Performance Work Statement and Standard Form 18 Request For Quotation.

Update #1 ·

Fabrication and installation of thirteen (13) aircraft hangar door deadbolt locking systems for the Ogden Air Logistics (OO-ALC) 309 Aircraft Maintenance Group (AMXG) at Hill Air Force Base, Utah.  Locking system shall prevent hangar door from opening with less than 500 lbs of external force when locked, but the bolt shall be frangible and fail when exposed to greater than 500 lbs of external opening force.  For reference images of an existing aircraft hangar door deadbolt locking system are included.  Contractor shall be responsible for providing six (6) months of support after the deadbolt locking systems are installed, whereby Contractor shall replace bolts and/or bolt assemblies when they become unserviceable.  Additional information regarding this requirement is outlined in the attached Performance Work Statement and Standard Form 18 Request For Quotation.

Files

File Type Posted
Aircraft Hangar Deadbolt Locking System Questions and Answers.docx DOCX document
Example Image 02.jpg JPG image
Standard Form 18 Request For Quotation.pdf PDF
Example Image 05.jpg JPG image
Performance Work Statement.docx DOCX document
Example Image 03.jpg JPG image
Example Image 01.jpg JPG image
Synopsis Solicitation Aircraft Hangar Deadbolt Locking Systems.docx DOCX document
Example Image 04.jpg JPG image

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity