Hume Lake Dam Rehabilitation

Award Notice Posted

Solicitation number
AG-9A40-S-15-0008
Agency
Awarded
to MCS Construction, Inc.
Set-aside
Total Small Business

Opportunity facts

Contract number
AG9A40C150007 Federal contract award
NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Not on record
Place of performance
Sequoia National Forest, Hume Lake Ranger District, United States

Notice details come from SAM.gov. Updated .

Notice text

The work consists of furnishing all equipment, labor, and materials to rehabilitate Hume Lake Dam. Hume Lake Dam is on Ten Mile Creek, on the western slope of the Sierra Nevada in Fresno County, California. The dam is a multiple-arch dam with 12 arches. The dam is 50.4 feet tall (crest elevation 5299 feet above sea level) and 675 feet long. The original dam construction was completed in 1908.

Work Items include the following:


1. Site preparation for membrane installation, including coffer dam construction, water diversion, and excavation to expose dam toe.
2. Furnish and install a geocomposite membrane system with drain on the upstream face of the dam.
3. Evaluate the integrity of the outlet works of the dam, including the intake structure, internal conduit, and valve seals.


The work includes Optional Bid Items as follows:


1. Grout bedrock foundation cracks in bays 4 and 5 upstream of the dam toe, and bays 1, 2, and 3 as well depending on site conditions.
2. Replace the intake assembly of the outlet works of the dam, and repair the interior surface lining of the outlet works conduit, depending on the results of the evaluation of integrity.
3. Furnish and install erosion protection mats in bay 4 downstream of the dam toe.
4. Design and install a Supervisory Control and Data Acquisition (SCADA) system to allow the control and adjustment of the outlet valves from remote locations, with some or all of the following components. The complete SCADA system includes a remote reservoir level monitoring system with solar array, a solar powered webcam with satellite link, and remotely accessed valve controls on the three valves in the outlet works.
5. Demolish and replace the generator and controls building and fencing with a new precast concrete building and fencing to house the generator and controls for the outlet works and SCADA system.

Files

File Type Posted
Amendment__1.pdf PDF
Permits_and_Sediment_Discharge.pdf PDF
RFI_Vertech.pdf PDF
Nov_18_2010_Drained_Hume_Lake_Photos.pdf PDF
FAR_52.232-5_Payment_Under_Fixed-Price_Construction_Contracts.pdf PDF
Sch_Items_Revised.xlsx XLSX spreadsheet
RFI_Carpi.pdf PDF
Revised_Drawing_Sheet_C1.7.pdf PDF
Revisions_to_Specifications.pdf PDF
misc_photos_1984_and_prior.pdf PDF
Hume_Lake_geo-tech_dam_report.pdf PDF
RFI_Crenshaw_2.pdf PDF
Section_I_Contract_Clauses.pdf PDF
Sch_Items_Revised.pdf PDF
Hume_Lake_Drawdown-2010.pdf PDF
Revised_Drawing_Sheet_C1.1.pdf PDF
SF_30.pdf PDF
SF-30_Amendment_No._1.pdf PDF
Business_cards.pdf PDF
Existing_Outlet_Valves_Control_Schematics.pdf PDF
PreBidMtgNotes_3-25-2015.pdf PDF
Attendance_Sheet.pdf PDF
Remote_Monitoring_System_Data.pdf PDF
1984FinalConstructionReport.PDF PDF
RFI_Questions_2015.03.15.pdf PDF
Project_Specifications.pdf PDF
Solicitation.pdf PDF
Fire_Plan.pdf PDF
Wage_Determination_CA29.pdf PDF
Drawings.pdf PDF
Sch_Items.xlsx XLSX spreadsheet
Show all 31