Sch_Items_Revised.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
Hume Lake Dam Rehabilitation
Solicitation number
AG-9A40-S-15-0008
Issued by

About this file

Schedule of items Revised Excel

View the file

Other files

File Type Posted
Amendment__1.pdf PDF
Hume_Lake_Drawdown-2010.pdf PDF
Revised_Drawing_Sheet_C1.1.pdf PDF
SF_30.pdf PDF
FAR_52.232-5_Payment_Under_Fixed-Price_Construction_Contracts.pdf PDF
Permits_and_Sediment_Discharge.pdf PDF
Revised_Drawing_Sheet_C1.7.pdf PDF
RFI_Vertech.pdf PDF
misc_photos_1984_and_prior.pdf PDF
Revisions_to_Specifications.pdf PDF
Hume_Lake_geo-tech_dam_report.pdf PDF
Nov_18_2010_Drained_Hume_Lake_Photos.pdf PDF
RFI_Carpi.pdf PDF
RFI_Crenshaw_2.pdf PDF
Section_I_Contract_Clauses.pdf PDF
Sch_Items_Revised.pdf PDF
Business_cards.pdf PDF
Existing_Outlet_Valves_Control_Schematics.pdf PDF
SF-30_Amendment_No._1.pdf PDF
PreBidMtgNotes_3-25-2015.pdf PDF
Attendance_Sheet.pdf PDF
RFI_Questions_2015.03.15.pdf PDF
1984FinalConstructionReport.PDF PDF
Remote_Monitoring_System_Data.pdf PDF
Solicitation.pdf PDF
Project_Specifications.pdf PDF
Fire_Plan.pdf PDF
Sch_Items.xlsx XLSX spreadsheet
Wage_Determination_CA29.pdf PDF
Drawings.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SchItems

PART I THE SCHEDULE
SECTION B - SERVICE AND SUPPLIES
SEQUOIA NATIONAL FOREST
Hume Lake Dam Rehabilitation
ITEM NO.DESCRIPTIONMMEst. QtyPAY UNITUNIT PRICEAMOUNT
Base Bid Items:
1Mobilization/Demobilization (includes bonding costs)L.S.Q.1L.S.$0.00
2Site preparation, including coffer dam construction, excavation to expose dam toe, and water diversionL.S.Q.1L.S.$0.00
3Geomembrane system (100 mil PVC liner) with Geocomposite geonet drainage layer and drain system (Includes all associated costs.)A.Q.21,000S.F.$0.00
4Outlet works and Bays 4 and 5 integrity investigationL.S.Q.1L.S.$0.00

Total Base Bid: $0.00

Option 1 - Foundation Grouting:
5Mobilization/Demobilization for GroutingL.S.Q.1L.S.$0.00
6Licensed Grouting Engineer (Minimum 10 years experience)A.Q.50HR$0.00
7ADrill grout hole for Bays 4 and 5 (includes pressure test and washing)A.Q.300L.F.$0.00
7BDrill grout hole for Bays 1, 2, and 3 (includes pressure test and washing)A.Q.450L.F.$0.00
8APortland Cement for GroutA.Q.70094 lb Bag$0.00
8BMicrofine Cement for GroutA.Q.20044 lb Bag$0.00
8CSand for GroutA.Q.800CF$0.00
8DBentonite for GroutA.Q.5050 lb Bag$0.00
8EFly Ash for GroutA.Q.10074 lb Bag$0.00
9AGrout production, processing, and placement for Bays 4 and 5A.Q.100Pump Hours$0.00
9BGrout production, processing, and placement for Bays 1, 2, and 3A.Q.100Pump Hours$0.00
Option 2 - Outlet Works Rehabilitation:
10Outlet works Intake structure fabrication (includes transportation)L.S.Q1L.S.$0.00
11Outlet works Intake structure installation (Includes removal of existing intake structure. Combine crane costs with item 9 if possible.)L.S.Q1L.S.$0.00
12Rehabilitation in Place of outlet works outfall conduit using one of the following methods based on results of integrity inspection$0.00
12ACured in Place Pipe (CIPP)A.Q.70L.F.$0.00
12BInterior resurfacing, corrosion protection, or coatingA.Q.600S.F.$0.00
12CBituminious CoatingL.S.Q1L.S.$0.00
Option 3 - Scour Protection in Bay 4:
13Bay 4 scour protection (Includes leveling rock, anchors, hardware, geomembrane, articulated concrete block matt, crane and operator for 5 days)A.Q.100S.Y.$0.00
Option 4 - Supervisory Control And Data Acquisition (SCADA) System:
14AFurnish and Install remote valve controls at valves; solar array, battery bank, control panel, and accessories at generator building. Size solar array and battery bank to power monitoring system only (not valve actuators).L.S.Q.1L.S.$0.00
14BFurnish and Install additional solar generation and power storage capability at generator building to operate valve actuators without activating generator.L.S.Q.1L.S.$0.00
15Install remote sensing system, including pressure transducer, control cable, and control panel. (Equipment is government furnished.)L.S.Q.1L.S.$0.00
16AFurnish and Install webcam at trail bridge. Power supply and controls to be selected from item B or C below.L.S.Q.1L.S.$0.00
16BFurnish and Install solar panel, battery, and wireless controls/data transfer for webcam.L.S.Q.1L.S.$0.00
16CFurnish and Install conduit and conductors for power supply and data transfer from SCADA control panel in generator building to webcam.A.Q.550L.F.$0.00
17Furnish and Install conduit and conductors for power supply and data transfer from SCADA control panel in generator building to valve controls at outlet works.A.Q.475L.F.$0.00
Option 5 Generator Building Replacement:
18Furnish and install prefabricated concrete generator building and new fenced enclosure (includes demolition and removal of existing building and chain link fencing)L.S.Q1L.S.$0.00

Note: Work includes all transportation, installation, or placement costs. Items not listed shall be considered incidental.