Sch_Items_Revised.pdf

PDF 80 KB Posted

Attached to
Hume Lake Dam Rehabilitation
Solicitation number
AG-9A40-S-15-0008
Issued by

About this file

Schedule of Items Revised

View the file

Other files

File Type Posted
Amendment__1.pdf PDF
Hume_Lake_Drawdown-2010.pdf PDF
Revised_Drawing_Sheet_C1.1.pdf PDF
SF_30.pdf PDF
FAR_52.232-5_Payment_Under_Fixed-Price_Construction_Contracts.pdf PDF
Permits_and_Sediment_Discharge.pdf PDF
Revised_Drawing_Sheet_C1.7.pdf PDF
RFI_Vertech.pdf PDF
Sch_Items_Revised.xlsx XLSX spreadsheet
misc_photos_1984_and_prior.pdf PDF
Revisions_to_Specifications.pdf PDF
Hume_Lake_geo-tech_dam_report.pdf PDF
Nov_18_2010_Drained_Hume_Lake_Photos.pdf PDF
RFI_Carpi.pdf PDF
RFI_Crenshaw_2.pdf PDF
Section_I_Contract_Clauses.pdf PDF
Business_cards.pdf PDF
Existing_Outlet_Valves_Control_Schematics.pdf PDF
SF-30_Amendment_No._1.pdf PDF
PreBidMtgNotes_3-25-2015.pdf PDF
Attendance_Sheet.pdf PDF
RFI_Questions_2015.03.15.pdf PDF
1984FinalConstructionReport.PDF PDF
Remote_Monitoring_System_Data.pdf PDF
Solicitation.pdf PDF
Project_Specifications.pdf PDF
Fire_Plan.pdf PDF
Sch_Items.xlsx XLSX spreadsheet
Wage_Determination_CA29.pdf PDF
Drawings.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No. AG-9A40-S-15-0008 Amendment No. 2

ITEM

NO.

DESCRIPTION MM Est. Qty PAY UNIT UNIT PRICE AMOUNT

Mobilization/Demobilization (includes bonding costs)

L.S.Q. 1 L.S. $0.00

Site preparation, including coffer dam construction, excavation to expose dam toe, and water diversion

L.S.Q. 1 L.S. $0.00

Geomembrane system (100 mil PVC liner) with Geocomposite geonet drainage layer and drain system (Includes all associated costs.)

A.Q. 21,000 S.F. $0.00

Outlet works and Bays 4 and 5 integrity investigation

L.S.Q. 1 L.S. $0.00

$0.00

5 Mobilization/Demobilization for Grouting L.S.Q. 1 L.S. $0.00

Licensed Grouting Engineer (Minimum 10 years experience)

A.Q. 50 HR $0.00

7A Drill grout hole for Bays 4 and 5 (includes pressure test and washing)

A.Q. 300 L.F. $0.00

7B Drill grout hole for Bays 1, 2, and 3 (includes pressure test and washing)

A.Q. 450 L.F. $0.00

8A Portland Cement for Grout A.Q. 700 94 lb Bag $0.00

8B Microfine Cement for Grout A.Q. 200 44 lb Bag $0.00 8C Sand for Grout A.Q. 800 CF $0.00

8D Bentonite for Grout A.Q. 50 50 lb Bag $0.00

8E Fly Ash for Grout A.Q. 100 74 lb Bag $0.00

9A Grout production, processing, and placement for Bays 4 and 5

A.Q. 100 Pump Hours $0.00

9B Grout production, processing, and placement for Bays 1, 2, and 3

A.Q. 100 Pump Hours $0.00

Outlet works Intake structure fabrication (includes transportation)

L.S.Q 1 L.S. $0.00

Outlet works Intake structure installation (Includes removal of existing intake structure. Combine crane costs with item 9 if possible.)

L.S.Q 1 L.S. $0.00

Rehabilitation in Place of outlet works outfall conduit using one of the following methods based on results of integrity inspection

$0.00

12A Cured in Place Pipe (CIPP) A.Q. 70 L.F. $0.00

12B Interior resurfacing, corrosion protection, or coating

A.Q. 600 S.F. $0.00

12C Bituminious Coating L.S.Q 1 L.S. $0.00

Option 2 - Outlet Works Rehabilitation:

Option 1 - Foundation Grouting:

Total Base Bid:

SEQUOIA NATIONAL FOREST

PART I THE SCHEDULE

Base Bid Items:

Hume Lake Dam Rehabilitation

SECTION B - SERVICE AND SUPPLIES

Solicitation No. AG-9A40-S-15-0008 Amendment No. 2

ITEM

NO.

DESCRIPTION MM Est. Qty PAY UNIT UNIT PRICE AMOUNT

Bay 4 scour protection (Includes leveling rock, anchors, hardware, geomembrane, articulated concrete block matt, crane and operator for 5 days)

A.Q. 100 S.Y. $0.00

14A

Furnish and Install remote valve controls at valves;

solar array, battery bank, control panel, and accessories at generator building. Size solar array and battery bank to power monitoring system only (not valve actuators).

L.S.Q. 1 L.S. $0.00

14B

Furnish and Install additional solar generation and power storage capability at generator building to operate valve actuators without activating generator.

L.S.Q. 1 L.S. $0.00

Install remote sensing system, including pressure transducer, control cable, and control panel.

(Equipment is government furnished.)

L.S.Q. 1 L.S. $0.00

16A Furnish and Install webcam at trail bridge. Power supply and controls to be selected from item B or C below.

L.S.Q. 1 L.S. $0.00

16B Furnish and Install solar panel, battery, and wireless controls/data transfer for webcam.

L.S.Q. 1 L.S. $0.00

16C Furnish and Install conduit and conductors for power supply and data transfer from SCADA control panel in generator building to webcam.

A.Q. 550 L.F. $0.00

Furnish and Install conduit and conductors for power supply and data transfer from SCADA control panel in generator building to valve controls at outlet works.

A.Q. 475 L.F. $0.00

Furnish and install prefabricated concrete generator building and new fenced enclosure (includes demolition and removal of existing building and chain link fencing)

L.S.Q 1 L.S. $0.00

Note: Work includes all transportation, installation, or placement costs. Items not listed shall be considered incidental.

Option 3 - Scour Protection in Bay 4:

Option 5 Generator Building Replacement:

Option 4 - Supervisory Control And Data Acquisition (SCADA) System:

SchItems