Solicitation No. AG-9A40-S-15-0008 Amendment No. 2
ITEM
NO.
DESCRIPTION MM Est. Qty PAY UNIT UNIT PRICE AMOUNT
Mobilization/Demobilization (includes bonding costs)
L.S.Q. 1 L.S. $0.00
Site preparation, including coffer dam construction, excavation to expose dam toe, and water diversion
L.S.Q. 1 L.S. $0.00
Geomembrane system (100 mil PVC liner) with Geocomposite geonet drainage layer and drain system (Includes all associated costs.)
A.Q. 21,000 S.F. $0.00
Outlet works and Bays 4 and 5 integrity investigation
L.S.Q. 1 L.S. $0.00
$0.00
5 Mobilization/Demobilization for Grouting L.S.Q. 1 L.S. $0.00
Licensed Grouting Engineer (Minimum 10 years experience)
A.Q. 50 HR $0.00
7A Drill grout hole for Bays 4 and 5 (includes pressure test and washing)
A.Q. 300 L.F. $0.00
7B Drill grout hole for Bays 1, 2, and 3 (includes pressure test and washing)
A.Q. 450 L.F. $0.00
8A Portland Cement for Grout A.Q. 700 94 lb Bag $0.00
8B Microfine Cement for Grout A.Q. 200 44 lb Bag $0.00 8C Sand for Grout A.Q. 800 CF $0.00
8D Bentonite for Grout A.Q. 50 50 lb Bag $0.00
8E Fly Ash for Grout A.Q. 100 74 lb Bag $0.00
9A Grout production, processing, and placement for Bays 4 and 5
A.Q. 100 Pump Hours $0.00
9B Grout production, processing, and placement for Bays 1, 2, and 3
A.Q. 100 Pump Hours $0.00
Outlet works Intake structure fabrication (includes transportation)
L.S.Q 1 L.S. $0.00
Outlet works Intake structure installation (Includes removal of existing intake structure. Combine crane costs with item 9 if possible.)
L.S.Q 1 L.S. $0.00
Rehabilitation in Place of outlet works outfall conduit using one of the following methods based on results of integrity inspection
$0.00
12A Cured in Place Pipe (CIPP) A.Q. 70 L.F. $0.00
12B Interior resurfacing, corrosion protection, or coating
A.Q. 600 S.F. $0.00
12C Bituminious Coating L.S.Q 1 L.S. $0.00
Option 2 - Outlet Works Rehabilitation:
Option 1 - Foundation Grouting:
Total Base Bid:
SEQUOIA NATIONAL FOREST
PART I THE SCHEDULE
Base Bid Items:
Hume Lake Dam Rehabilitation
SECTION B - SERVICE AND SUPPLIES
Solicitation No. AG-9A40-S-15-0008 Amendment No. 2
ITEM
NO.
DESCRIPTION MM Est. Qty PAY UNIT UNIT PRICE AMOUNT
Bay 4 scour protection (Includes leveling rock, anchors, hardware, geomembrane, articulated concrete block matt, crane and operator for 5 days)
A.Q. 100 S.Y. $0.00
14A
Furnish and Install remote valve controls at valves;
solar array, battery bank, control panel, and accessories at generator building. Size solar array and battery bank to power monitoring system only (not valve actuators).
L.S.Q. 1 L.S. $0.00
14B
Furnish and Install additional solar generation and power storage capability at generator building to operate valve actuators without activating generator.
L.S.Q. 1 L.S. $0.00
Install remote sensing system, including pressure transducer, control cable, and control panel.
(Equipment is government furnished.)
L.S.Q. 1 L.S. $0.00
16A Furnish and Install webcam at trail bridge. Power supply and controls to be selected from item B or C below.
L.S.Q. 1 L.S. $0.00
16B Furnish and Install solar panel, battery, and wireless controls/data transfer for webcam.
L.S.Q. 1 L.S. $0.00
16C Furnish and Install conduit and conductors for power supply and data transfer from SCADA control panel in generator building to webcam.
A.Q. 550 L.F. $0.00
Furnish and Install conduit and conductors for power supply and data transfer from SCADA control panel in generator building to valve controls at outlet works.
A.Q. 475 L.F. $0.00
Furnish and install prefabricated concrete generator building and new fenced enclosure (includes demolition and removal of existing building and chain link fencing)
L.S.Q 1 L.S. $0.00
Note: Work includes all transportation, installation, or placement costs. Items not listed shall be considered incidental.
Option 3 - Scour Protection in Bay 4:
Option 5 Generator Building Replacement:
Option 4 - Supervisory Control And Data Acquisition (SCADA) System:
SchItems