Sch_Items.xlsx

XLSX spreadsheet 17 KB Posted

Attached to
Hume Lake Dam Rehabilitation
Solicitation number
AG-9A40-S-15-0008
Issued by

About this file

Excel Schedule of Items

View the file

Other files

File Type Posted
Amendment__1.pdf PDF
Hume_Lake_Drawdown-2010.pdf PDF
Revised_Drawing_Sheet_C1.1.pdf PDF
SF_30.pdf PDF
FAR_52.232-5_Payment_Under_Fixed-Price_Construction_Contracts.pdf PDF
Permits_and_Sediment_Discharge.pdf PDF
Revised_Drawing_Sheet_C1.7.pdf PDF
RFI_Vertech.pdf PDF
Sch_Items_Revised.xlsx XLSX spreadsheet
misc_photos_1984_and_prior.pdf PDF
Revisions_to_Specifications.pdf PDF
Hume_Lake_geo-tech_dam_report.pdf PDF
Nov_18_2010_Drained_Hume_Lake_Photos.pdf PDF
RFI_Carpi.pdf PDF
RFI_Crenshaw_2.pdf PDF
Section_I_Contract_Clauses.pdf PDF
Sch_Items_Revised.pdf PDF
Business_cards.pdf PDF
Existing_Outlet_Valves_Control_Schematics.pdf PDF
SF-30_Amendment_No._1.pdf PDF
PreBidMtgNotes_3-25-2015.pdf PDF
Attendance_Sheet.pdf PDF
RFI_Questions_2015.03.15.pdf PDF
1984FinalConstructionReport.PDF PDF
Remote_Monitoring_System_Data.pdf PDF
Solicitation.pdf PDF
Project_Specifications.pdf PDF
Fire_Plan.pdf PDF
Wage_Determination_CA29.pdf PDF
Drawings.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EngEst

PART I THE SCHEDULE
SECTION B - SERVICE AND SUPPLIES
SEQUOIA NATIONAL FOREST
Hume Lake Dam Rehabilitation
ITEM NO.DESCRIPTIONMMESTIMATED QUANTITYPAY UNITUNIT PRICEAMOUNT
Base Bid Items:
1Mobilization/Demobilization (includes bonding costs)L.S.Q.1L.S.$0.00
2Geomembrane system (100 mil PVC liner) with Geocomposite geonet drainage layer and drain system (Includes all associated costs.)A.Q.21,000S.F.$0.00
3Outlet works integrity investigationL.S.Q.1L.S.$0.00

Sub-Total Base Bid: $0.00

Option 1 - Foundation Grouting:
4Mobilization/Demobilization for GroutingL.S.Q.1L.S.$0.00
5Licensed Grouting Engineer (Minimum 10 years experience)A.Q.50HR$0.00
6ADrill grout hole for Bays 4 and 5 (includes pressure test and washing)A.Q.300L.F.$0.00
6BDrill grout hole for Bays 1, 2, and 3 (includes pressure test and washing)A.Q.450L.F.$0.00
7APortland Cement for Bays 4 and 5 (Sand, microfine, fly ash, and additives are incidental.)A.Q.700Bag$0.00
7BPortland Cement for Bays 1, 2, and 3 (Sand, microfine, fly ash, and additives are incidental.)A.Q.700Bag$0.00
8AGrout production, processing, and placement for Bays 4 and 5A.Q.100Pump Hours$0.00
8BGrout production, processing, and placement for Bays 1, 2, and 3A.Q.100Pump Hours$0.00

Sub-Total Option 1: $0.00

Option 2 - Outlet Works Rehabilitation:
9Outlet works Intake structure fabrication (includes transportation)L.S.Q1L.S.$0.00
10Outlet works Intake structure installation (Includes removal of existing intake structure. Combine crane costs with item 9 if possible.)L.S.Q1L.S.$0.00
11Rehabilitation in Place of outlet works outfall conduit using one of the following methods based on results of integrity inspection$0.00
11ACured in Place Pipe (CIPP)A.Q.70L.F.$0.00
11BInterior resurfacing, corrosion protection, or coatingA.Q.600S.F.$0.00
11CBituminious CoatingL.S.Q1L.S.$0.00

Sub-Total Option 2: $0.00

Option 3 - Scour Protection in Bay 4:
12Bay 4 scour protection (Includes leveling rock, anchors, hardware, geomembrane, articulated concrete block matt, crane and operator for 5 days)A.Q.100S.Y.$0.00

Sub-Total Option 3: $0.00

Option 4 - Supervisory Control And Data Acquisition (SCADA) System:
13AFurnish and Install remote valve controls at valves; solar array, battery bank, control panel, and accessories at generator building. Size solar array and battery bank to power monitoring system only (not valve actuators).L.S.Q.1L.S.$0.00
13BFurnish and Install additional solar generation and power storage capability at generator building to operate valve actuators without activating generator.L.S.Q.1L.S.$0.00
14Install remote sensing system, including pressure transducer, control cable, and control panel. (Equipment is government furnished.)L.S.Q.1L.S.$0.00
15AFurnish and Install webcam at trail bridge. Power supply and controls to be selected from item B or C below.L.S.Q.1L.S.$0.00
15BFurnish and Install solar panel, battery, and wireless controls/data transfer for webcam.L.S.Q.1L.S.$0.00
15CFurnish and Install conduit and conductors for power supply and data transfer from SCADA control panel in generator building to webcam.A.Q.550L.F.$0.00
16Furnish and Install conduit and conductors for power supply and data transfer from SCADA control panel in generator building to valve controls at outlet works.A.Q.475L.F.$0.00

Sub-Total Option 4: $0.00

Option 5 Generator Building Replacement:
17Furnish and install prefabricated concrete generator building and new fenced enclosure (includes demolition and removal of existing building and chain link fencing)L.S.Q1L.S.$0.00

Sub-Total Option 5: $0.00

TOTAL BID:$0.00
Note: Work includes all transportation, installation, or placement costs. Items not listed shall be considered incidental.

Solicitation No. AG-9A40-S-15-0008

Sheet2

Sheet3