RFI_Vertech.pdf

PDF 15 KB Posted

Attached to
Hume Lake Dam Rehabilitation
Solicitation number
AG-9A40-S-15-0008
Issued by

About this file

Answers to RFI Vertech

View the file

Other files

File Type Posted
Amendment__1.pdf PDF
Hume_Lake_Drawdown-2010.pdf PDF
Revised_Drawing_Sheet_C1.1.pdf PDF
SF_30.pdf PDF
FAR_52.232-5_Payment_Under_Fixed-Price_Construction_Contracts.pdf PDF
Permits_and_Sediment_Discharge.pdf PDF
Revised_Drawing_Sheet_C1.7.pdf PDF
Sch_Items_Revised.xlsx XLSX spreadsheet
misc_photos_1984_and_prior.pdf PDF
Revisions_to_Specifications.pdf PDF
Hume_Lake_geo-tech_dam_report.pdf PDF
Nov_18_2010_Drained_Hume_Lake_Photos.pdf PDF
RFI_Carpi.pdf PDF
RFI_Crenshaw_2.pdf PDF
Section_I_Contract_Clauses.pdf PDF
Sch_Items_Revised.pdf PDF
Business_cards.pdf PDF
Existing_Outlet_Valves_Control_Schematics.pdf PDF
SF-30_Amendment_No._1.pdf PDF
PreBidMtgNotes_3-25-2015.pdf PDF
Attendance_Sheet.pdf PDF
RFI_Questions_2015.03.15.pdf PDF
1984FinalConstructionReport.PDF PDF
Remote_Monitoring_System_Data.pdf PDF
Solicitation.pdf PDF
Project_Specifications.pdf PDF
Fire_Plan.pdf PDF
Sch_Items.xlsx XLSX spreadsheet
Wage_Determination_CA29.pdf PDF
Drawings.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

From: Chris McLaughlin

RFI

1. Should the proposal include a server for the SCADA software at a remote control center or office? Answer: No. If yes, should it be a rack-mount server? No.

2. Should the proposal include an Ethernet switch for the server? Answer: No.

3. Should the proposal include a SCADA workstation computer and monitor at a remote control center or office? Answer: No.

4. Should this proposal include a computer and monitor dedicated to viewing the webcam? It could be on the same computer as the SCADA software, or it could be a separate computer, or the webcam can be viewed from the browser on an existing computer. Answer: No.

5. Should the proposal include a DVR or NVR (Network Video Recorder) for recording the webcam footage?

6. Shall the SCADA system be capable of historically logging data and reporting?

Alarm notification by email, text, phone (any or all of those options)? Answer:

No. The SCADA system data will be routed through an asset tracking service provided by AMCI.

7. Should the proposal include a UPS in the MTU to avoid momentary power losses or changeovers? Answer: The system must be designed to provide uninterrupted power to the MTU regardless of the power source (solar, battery, or generator) and during transitions between power sources.

8. Are the electric valve actuators already in place? Answer: Yes. Are there any mechanical valve controls that need to be provided in this proposal, or are we merely controlling existing equipment? This contract merely requires controlling existing equipment.

9. Is the panel provided by the Government in Bid Schedule Option 4 Item 14 the same as the Reservoir SCADA panel mentioned in specification section 4D.2?

Answer: No; the panel provided by the government is part of the remote monitoring system to transmit data to a satellite to be picked up by the asset tracking service; see data sheet provided.

10. Satellite modems have monthly fees for service? Should any fees be included in the proposal? No monthly fees should be included in the proposal.

11. Will there be Ethernet cables run between the MTU and other remote control panels (Control Valves SCADA Panel and Reservoir SCADA Panel), or should we provide a wireless radio solution? Answer: The pressure transducer will have a control cable installed (pay item 14). Pay item 15b requests a wireless solution for power and data transfer/control at the webcam under the trail bridge. Pay item 15c requests conduit and conductors for power and data transfer/control at the webcam. Pay item 16 requests conduct and conductors for both power and data from the generator building to the control valves at the outlet works. A wireless solution for the control valves could be proposed as a substitute for the conduit and conductors, but would have to provide both power and data transfer without adding visually intrusive equipment to the historic dam’s appearance.

From: Chris McLaughlin