Homestead Air Reserve Base B121 - B122 Hallway Connection

Closed Pre-Solicitation Posted

Solicitation number
FA664826SS0002
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Homestead, Florida 33039, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Air Force Reserve Command is conducting market research for a design-build contractor to repair and connect Buildings 121 and 122 at Homestead Air Reserve Base, Florida, with sources-sought responses due August 7, 2026. This is not a solicitation and carries no set-aside. The estimated construction magnitude ranges from $1 million to $5 million; the small business size standard is $45 million.

The scope includes demolition, restoration, alterations, and finishes across the two buildings and a new connecting structure. Key elements comprise a new enclosed hallway with interior office finishes (carpet, lighting, electrical, fire sprinkler, and lightning protection), standing seam metal roof, and insulated/painted walls; extension of asphalt area with a 35-foot-long by 28-foot-wide by 16-foot-high canopy for three mobility vehicles; perimeter chain link fencing with gates; new chilled-water air conditioning for warehouse bays; roof replacement with standing seam metal; and specialized operational spaces including a climate-controlled 2,400-square-foot equipment bay, control center, training/briefing room, testing room, quality assurance area, and office extensions.

The contractor must prepare design submissions at 65-percent, 100-percent, and final certified phases using Unified Facilities Guide Specifications, signed and sealed by a Florida-registered Professional Engineer and Registered Architect. Design analysis must include load calculations, electrical coordination, arc flash analysis, lighting calculations, and structural verification. Overall contract performance is 540 calendar days from Notice to Proceed; construction does not commence until final design approval. Work must comply with Unified Facilities Criteria, Florida Building Code, NFPA standards, and HARB-specific requirements.

Place of performance is Homestead Air Reserve Base, Florida. NAICS 236220 applies.

Notice text

SOURCES SOUGHT SYNOPSIS

Project Title: Design-Build - KYJM 17-9010 Repair and Connect B-121 to B-122 for EOD Location: Homestead Air Reserve Base (HARB), Florida Notice Type: Sources Sought / Market Research NAICS Code: 236220 - Commercial and Institutional Building Construction Small Business Size Standard: $45.0 Million Estimated Magnitude of Construction: Between $1,000,000 and $5,000,000

1. INTRODUCTION

This is a Sources Sought Synopsis. This notice is issued for market research purposes only to determine the availability, capability, and interest of qualified firms.

THIS IS NOT A SOLICITATION OR REQUEST FOR PROPOSALS. No contract will be awarded from this synopsis. No reimbursement will be made for any costs associated with providing information in response to this notice or any follow-up information requests.

2. PROJECT DESCRIPTION

The Government is seeking a Design-Build Contractor to provide all , labor, services, tools, materials, equipment, transportation, supervision, and miscellaneous requirements to prepare complete construction documents (design drawings, specifications, design analysis) and perform construction at Homestead Air Reserve Base (HARB), Florida.

The scope of work includes demolition, restoration, alterations, additions, and finishes to satisfy mission requirements. Key elements of the project include, but are not limited to:

  • Design-Build Submission Packages: Preparation of 65% design, 100% design, and Final Certified submission packages utilizing Unified Facilities Guide Specifications (UFGS) and signed/sealed by a Florida-registered Professional Engineer (P.E.) and Registered Architect.

  • New Hallway Addition: Construction of an enclosed hallway to connect building 121 to building 122, including interior office finishes (carpet, lighting, electrical, fire sprinkler, and lightning protection systems), standing seam metal roof, and insulated/painted walls.

  • Site Work & Canopy: Extending the asphalt area and installing a new 35' L x 28' W x 16' H clear-span canopy (no columns) to accommodate three (3) mobility vehicles. Work includes a professional geotechnical study, grading/drainage plans (max 2% slope), and heavy-duty black polyethylene bird netting.

  • Perimeter Security: Installation of a perimeter chain link fence with one double vehicle gate, two single personnel gates, and integration of specialized security lock hardware.

  • Complex HVAC Systems: Installation of a new, highly efficient Carrier air-cooled chiller (ACCH-1) with copper/copper coils capable of withstanding 8,000 hours of salt spray testing. Work includes multi-zone variable airflow chilled water systems, DX mini-splits for communications closets, and a Bacnet DDC control system fully compatible with HARB's campus-wide WebCTRL 7.0 AutomatedLogic license.

  • Roof Replacement: Design and installation of a new standing seam metal roof system (with an R-value of 30) for warehouse building 121, admin building 121, and building 122. Design must comply with Miami-Dade County high-velocity wind zone standards (minimum 150 mph wind speed/150 psf uplift pressure) and include a 20-year single-source water-tightness warranty.

  • Specialized Security & Administrative Spaces:

    • Secure Open Storage Space (B-122): Construction of a secure room designed for high-security storage of specialized equipment. Construction requirements include permanent reinforced walls (with expanded steel mesh/18-gauge screen), no windows, GSA-approved security locks (meeting FF-L-2740), and hardened utility openings.

    • Secure Briefing and Training Room (B-122): A specialized space designed to host secure briefings for up to 35 personnel, compliant with military facility security, access control, and acoustic shielding requirements.

    • Climate-Controlled Equipment Bay (B-121): A 2,400 sq/ft secure storage bay for specialized mobility packages and equipment requiring strict environmental parameters (65°F to 80°F, 40% to 60% relative humidity) and physical separation from administrative areas.

    • Integrated Secure Communications: Maintenance, integration, and protection of existing secure network communication lines and drops throughout the facility footprint.

  • Critical Operational Constraints: Uninterrupted electrical power must be strictly maintained for existing high-security storage areas and their respective alarm systems during the entire duration of the project.

3. PERIOD OF PERFORMANCE

The period of performance for the design and construction phases is 540 calendar days from the Notice to Proceed (NTP).

4. REQUESTED INFORMATION (CAPABILITY STATEMENT)

Interested and capable firms are requested to submit a Capability Statement demonstrating their ability to perform the work described above. Submissions should be limited to five (5) pages and must include the following:

  1. Company Profile:

    • Company Name, Address, and Point of Contact (Name, Phone, Email).

    • CAGE Code and Unique Entity ID (UEI).

    • Business size and socio-economic status (e.g., Small Business, 8(a), HUBZone, SDVOSB, WOSB) under the anticipated NAICS code.

  2. Bonding Capacity:

    • Provide single and aggregate bonding capacity from an approved surety.

  3. Relevant Past Performance:

    • A brief summary of up to three (3) recent projects (within the last 5 years) that are similar in size, scope, and complexity to this requirement (specifically design-build projects on military installations involving secure administrative spaces, high-velocity wind zone roofing, and complex chilled-water HVAC systems).

    • Include the contract number, project title, location, contract value, role (Prime or Subcontractor), and a brief description of the work performed.

5. SUBMISSION INSTRUCTIONS

All capability statements must be submitted electronically via email to:

  • Contracting Officer / Contract Specialist: Tahj Guilford

  • Email Address: Tahj.Guilford.2@us.af.mil

Responses must be received no later than 4:00 PM Eastern Standard Time (EST) on August 7, 2026.

Please include "Sources Sought Response: KYJM 17-9010 Repair and Connect B-121 to B-122" in the email subject line.

Questions regarding this notice may be directed to the email address listed above. Telephone inquiries will not be accepted.

Files

File Type Posted
B121 B122 Hallway Connection SOW.pdf PDF

Similar open opportunities

Opportunity Agency Set-aside Responses due
Sources Sought - Construction Repair Building 6413 Secure Space (511669 & 519580) Barksdale AFB Barksdale AFB, Louisiana 71110, United States · NAICS 236220 ENDIST Fort Worth No set-aside
REQUEST FOR INFORMATION (RFI) / MARKET RESEARCH NOTICE RELATED TO SEVERAL UPCOMING PROJECTS at WRIGHT-PATTERSON AFB, OHIO Wright Patterson AFB, Ohio 45433, United States · NAICS 236220 ENDIST Louisville No set-aside
WWYK260004 - repair structural integrity, B1134, post 34 & north wall Tinker AFB, Oklahoma 73145, United States · NAICS 238190 Air Force Sustainment Center Total Small Business
Market Intelligence - Progressive Design-Build - SRM Campaign for the 96th Medical Group Eglin AFB, Florida, United States · NAICS 236220 ENDIST Mobile No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity