Hanley Upper Envelope Construction

Awarded Award Notice Posted

Solicitation number
GS-02-P-17-PW-C-0001
Agency
Region 2 Public Buildings Service, General Services Administration
Awarded
to Pulver Roofing Co., Inc.
Set-aside
Total Small Business

Opportunity facts

Contract number
GS02P17PWC0005 Federal contract award
NAICS code
238160 Roofing Contractors
PSC
Not on record
Place of performance
James M. Hanley Federal Building 100 S. Clinton Street Syracuse, New York 13261, United States

Notice details come from SAM.gov. Updated .

Notice text

3 versions

Update #3 · Latest ·

Added: Feb 08, 2017 4:15 pm Modified: Feb 13, 2017 1:50 pmTrack Changes  AMENDMENT #1 TO SOLICITATION:
Amendment to Specification Section 017320: There are two (2) roof top AC units not initially identified within the project documents (each being two (2) ton units) that have had the coolant extracted, are electrically and mechanically disconnected, and have been recently abandoned in place. The units need to be removed from the Annex roof and disposed of as part of this project.

All remaining roof penetrations, electrical cabling and piping originally used to operate and or service these two units shall be removed, cut flush to the concrete deck, and securely covered prior to installation of the new roofing assembly (similar to how other abandoned equipment is to be handled per the project documents).


 AMENDMENT #2 TO SOLICITATION:

This amendment posts(as an attachement), all the final questions and answers.  Document posted as "Solicitation QA #2"

Also, this amendment posts a change to Specification 01100.  Posted as an attachment "SF30-Amendment 2"

   ADD the following section to Specification 01100 - Summary of Work, para. 1.2.J.3:

 "3. The design intent is to provide 6" of XPS insulation throughout all roof areas where existing conditions will allow. Due to the varying limitations at certain roof areas, this may not be possible. Drawings have indicated where certain roof areas will not allow 6" of new XPS insulation to be installed. In these cases, contractor shall install no less than the existing depth of insulation documented to maintain the same height as existing, without negatively impacting existing conditions, such as flashing and roof equipment curb heights, etc."

Update #2 ·

Added: Feb 08, 2017 4:15 pm AMENDMENT TO SOLICITATION
Amendment to Specification Section 017320: There are two (2) roof top AC units not initially identified within the project documents (each being two (2) ton units) that have had the coolant extracted, are electrically and mechanically disconnected, and have been recently abandoned in place. The units need to be removed from the Annex roof and disposed of as part of this project.

All remaining roof penetrations, electrical cabling and piping originally used to operate and or service these two units shall be removed, cut flush to the concrete deck, and securely covered prior to installation of the new roofing assembly (similar to how other abandoned equipment is to be handled per the project documents).


 

Update #1 ·

Added: Jan 05, 2017 4:19 pm

The project consists of building renovations at the James M. Hanley Federal Building, 100 South Clinton Street, Syracuse, New York, 13261.  The base project consists of, but is not limited to, demolish existing roof system, abate roof areas, provide retrofit roof drains, provide new single-ply thermoplastic roofing system, XPS insulation and flashing, and re-coat with exact same coating material any concrete/parapet/façade portions of the building left exposed, disturbed, and/or damaged. This project was designed by N.K. Bhandari Architecture & Engineering P.C. of Syracuse, New York.

The Contractor shall provide all labor, material, equipment, tools, management, and supervision.  Three (3) main work areas comprising approximately 20,000 SF are identified for roofing replacement at the James M. Hanley Federal Building and Annex located in Syracuse, NY:  North Tower, South Tower and Annex (including bridge). . The base work shall be conducted in phases where the Contractor must complete one roof replacement work area before another roof replacement work area can be performed. Demolition consists of removal (and where indicated abatement) of all roof areas identified on plans and specifications. Existing counter-flashings will be removed and new installed, unless noted otherwise.  Roof replacement will include the installation of new fully adhered single-ply thermoplastic membrane system, and new retrofit roof drains into existing drain leaders/bodies. New insulation will be extruded polystyrene (XPS).  Areas of façade impacted by or left exposed due to roof replacement work activities shall be recoated with exact coating product and color to match existing. Existing skylights are to be replaced with new.  Existing abandoned mechanical equipment will be removed and disposed of.  Existing active mechanical equipment currently in use shall be disconnected and reconnected as required to replace the roof.  Existing rooftop equipment that cannot be taken out of service shall be left in place and roof shall be replaced up to this equipment and its supports.  Communications Antenna and Satellite Dish will be temporarily disconnected to facilitate roof replacement operations.  After roof is replaced, equipment will be reconnected/refastened and recalibrated for proper operation/function.  Existing lighting protection system will be disconnected and reconnected.  The lighting protection system will need to be re-certified as part of this project once the new roof system is installed. Base work shall include; but is not limited to, roof demolition, disconnect and reconnect of electrical, HVAC and plumbing systems, sealant and concrete coating repairs, roof installation, roof drains, roof deck repairs (as required), and flashing repairsExact work descriptions are identified and indicated in the Contract Documents.  Products to be used are specified within the drawings and individual specification sections.  The contractor shall comply with the project's design specifications and drawings.  The work will be constructed under a single prime contract. 

In accordance with FAR 14.408-1, award will be made as a firm fixed price sealed bid construction contract to a responsible bidder whose bid, conforms to the invitation, will be most advantageous to the Government, considering only price and the price-related factors included in the invitation. The magnitude of this construction project is estimated between $500,000 and $1,000,000.  The appropriate NAICS Code is 238160, Roofing Contractors with a size standard of $15.0 million dollars. Performance and payment bonds will be required following award pursuant to the Miller Act.  A bid guarantee is also required.  The procurement is 100% set-aside for small business concerns.  Offers from other than small business concerns will not be considered by the agency.  The required construction completion date is approximately on hundred-twenty (120) calendar days commencing one day after Notice to Proceed.  The tentative solicitation release date is no earlier than 15 days after posting of this notice in FedBizOpps.  The procurement is subject to FAR 52.232-18 Availability of Funds (APR 1984). 


To ensure that you receive all information regarding this solicitation, be sure to register to receive updates at www.fbo.gov.  It is anticipated that the solicitation (IFB) will be issued on or about January 19, 2017 with bids due or about February 22, 2017.  The solicitation (clauses, provisions, and bid forms) will only be available electronically on the FBO website; www.fbo.gov is a secure website designed to safeguard sensitive but unclassified (SBU) acquisition data.  Potential bidders must register with FedBizOpps in order to have access to the solicitation material.  All potential offerors must have an active registration in the System for Award Management (SAM). All prospective offerors are required to have completed the Representations and Certifications in SAM. To receive specifications and drawings, please fill out the document security form and send via email to james.berring@gsa.gov and Katherine.wheeler@gsa with a mailing address.  Once the filled out document security form is received and the information verified, a CD with the specs and drawings will be sent out. 


A site visit has been scheduled for February 1, 2017 at 10:30 am.  Additional information will be provided in the upcoming solicitation.


The points of contact for this synopsis are James Berring, Contract Specialist, 315-751-6837, james.berring@gsa.gov and Katherine Wheeler, Contracting Officer, 315-448-0922, katherine.wheeler@gsa.gov.


The Project Manager will be Jerry Boyle (Gerald.boyle@gsa.gov), GSA General Engineer, 315-448-0956.



 

Attachments

Files attached to this notice, newest first
File Type Posted
Solicitation_Complete_QA__2.pdf PDF
Solicitation_QA__2.pdf PDF
SF30-Amendment_2.pdf PDF
SF30-16a.pdf PDF
Solicitation_QA.pdf PDF
Sign_in_Sheet.pdf PDF
DocumentSecurityNotice.pdf PDF
GSA527-Hanley_Upper_Envelope_Construction.pdf PDF
HanleyUpperEnvelope_Reps_&_Certs.pdf PDF
SF1442_-_Hanley_Upper_Envelope_Construction.pdf PDF
www.wdol.gov_-_NY16.pdf PDF
HanleyUpperEnvelopeAgreement.pdf PDF
HanleyUpperEnvelope_Solicitation.pdf PDF
Show all 13

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity