COMPLETE Q&A, disregard attachment Solicitation QA 2

View the file

Other files for this federal contract opportunity

Other files attached to Hanley Upper Envelope Construction, newest first.
File Type Posted
SF30-Amendment_2.pdf PDF
Solicitation_QA__2.pdf PDF
SF30-16a.pdf PDF
Solicitation_QA.pdf PDF
Sign_in_Sheet.pdf PDF
GSA527-Hanley_Upper_Envelope_Construction.pdf PDF
HanleyUpperEnvelope_Reps_&_Certs.pdf PDF
SF1442_-_Hanley_Upper_Envelope_Construction.pdf PDF
www.wdol.gov_-_NY16.pdf PDF
HanleyUpperEnvelopeAgreement.pdf PDF
HanleyUpperEnvelope_Solicitation.pdf PDF
DocumentSecurityNotice.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GSA Solicitation No. GS-02-P-17-PW-C-0001 Construction for James M. Hanley Federal Building Upper Envelope Additional Questions and Answers

Question 1. Refer to detail 1/AE501. The flashing is shown to terminate with a T-bar and counter flashing at a height of eight (8) inches above the step-in-the-wall. Currently, there are numerous D-ring tie-offs attached to the wall in this 8-inch space. Please advise on how the D-rings should be addressed. (Should they be removed, for instance? Should the roof terminate below the D-rings? Another option?)

Answer 1. Install roof flashing to bottom of D-Ring locations (D-Rings are to remain in place). All other areas to be 8” min. height.

Question 2. Section 075400, paragraph 2.5.A calls for R-25 insulation. Keynotes 1/AE101, 5/AE102, 8/AE102, 1/AE103, and 6/AE103 call for insulation R-values other than R- 25.

Which prevails, the specification or the keynotes?

Answer 2. R-25 is a minimum rating due to varying conditions on multiple roofs.

Drawing Keynotes shall govern, unless noted otherwise. Note: Areas on the “South Tower” (refer drawing AE102) shall maintain the same height of insulation installed as currently existing in order to eliminate potential termination issues created by the large quantity of mechanical equipment on this section of roof.

Question 3. Section 075400, paragraph 2.5.C calls for taper insulation. Does this occur anywhere other than the gray-shaded "cricket areas" shown on this roof plans?

Answer 3. Tapered insulation is typically noted by shaded areas with ¼” / 1’-0” markers.

Question 4. For the gray-shaded crickets areas, are we to use insulation boards factory-fabricated to a 1/4" per foot slope, or is the combined slope of the cricket board and the underlying structural slope supposed to be 1/4" per foot (meaning factory fabricated slope in the board would have to be greater than 1/4" per foot).

Answer 4. Design intent is to provide a reverse slope that is equivalent to ¼” per foot.

In some areas, thickness would be greater than ¼” per foot.

Question 5. Section 075400, paragraph 2.5.D states that the "roof system (vapor retarder, insulation, cover board, and membrane) thickness [shall] not exceed six (6) inches." In areas that may receive R-30 insulation, the total system thickness will exceed six (6) inches. Please confirm if roof can exceed the 6" thickness or if we should reduce the insulation thickness.

Answer 5. Roof section R15A depicted as “South Tower” (refer drawing AE102) is to maintain the same height of insulation installed as currently existing in order to eliminate potential termination issues created by the large quantity of mechanical equipment on this section of roof. This is also referred to on Drawing AE102, Keyed Note 5.

Construction for James M. Hanley Federal Building Upper Envelope Additional Questions and Answers

Question 6. For the purposes of this project, is a Torch-applied sheet vapor retarder (title of Section 071326) the same thing as a Self-Adhering Sheet Vapor Retarder (footer of Section 071326 and as mentioned in 075400, paragraph 2.4)?

Answer 6. Any reference to “Self-adhering membrane” shall be deleted. Torch-applied sheet vapor retarder is required.

Question 7. Refer to Roof 15A on Sheet AE102. The roof legend for the hatch-marks on this roof state to install minimum R-25 insulation. Keyed Note 5 on this roof section states to install 2-1/2", R-15 insulation. Which is correct?

Answer 7. To the extent possible, follow Keyed Note 5, as pre-existing conditions in several areas will limit the installation of R-25 thicknesses.

Question 8. Refer to Roof 15A. Which portions of this roof area receive taper insulation? Is there a structural slope in any portion of this roof deck?

Answer 8. Roof 15A has a structural slope. Past renovation has altered this slope in ways that require additional tapered insulation to provide proper drainage.

Question 9. Refer to Roof 15C on Sheet AE102. The roof legend for the hatch-marks on this roof state to install minimum R-25 insulation. Keyed Note 8 on this roof section states to install 6", R-30 insulation. Which is correct?

Answer 9. To the extent possible, follow Keyed Note 5, as pre-existing conditions in several areas will limit the installation of R-25 thicknesses.

Question 10. Refer to Roof 16 on Sheet AE102. Keyed note 8 states to install 6" XPS. The gray hatching states to install taper insulation. Is the taper insulation in addition to the 6" XPS?

Answer 10. Correct. This roof section has no structural slope.

Question 11. Refer to Roof 2 on Sheet AE103. The roof legend for the hatch-marks on this roof state to install 6", R-30 insulation. Keyed Note 6 on this roof section states to install 4", R-20 insulation. Which is correct?

Answer 11. Keyed Note 6 is indicated, as the existing roof edge limitations prevent a full 6” R-30 insulation installation.

Question 12. See keynote 5 and Sheet AE103. Please provide a reference for detail ####.

Answer 12. Refer to Detail #2 on Drawing AE504.

Question 13. Is there a specific design criterion for the new lightning protection system (material type, etc.)?

Answer 13. Follow notes on EP-Series Drawings and Specification Section 26114 – Lightening Protection System.

Question 14. Does the underground parking boundary reach past the plaza deck boundary lines referenced on Drawing G-002?

Answer 14. Plaza deck boundary starts is one sidewalk width from the road.

Believe the sidewalk width in this situation is 8 ft.

Question 15. Are there any tunnels or pipe chases in the crane staging locations shown on Drawing G-0002?

Answer 15. None owned by US Gov. as this is City of Syracuse property.

Contractor shall expect normal underground utilities to be present.

Question 16. Can crane outriggers set up on properly protected sidewalk areas in the crane staging areas shown on G-0002?

Answer 16. Not on any area considered on or within plaza deck area as the weight limitation (shown as not on drawing) of the plaza would be exceed.

Question 17. Are alternate material handling and hoisting methods (other than crane method) permissible on this project? We understand chutes are not permitted.

Answer 17. GSA does not object to use “coordinated off hour” use of the freight elevator provided compliance with weight limitation (8,000 lb) of freight elevator. Freight elevator highest stop is 14th floor whereby access to north tower roof is one additional flight of stairs up.

Construction for James M. Hanley Federal Building Upper Envelope Additional Questions and Answers

Question 18. It was said that the new roof system going back was not going to be thicker than the existing system being removed. This was to avoid conflict with existing flashing heights. The existing roof is approximately 3" thick. The drawings however suggest that we are installing 6" of insulation and a 1/2" cover board (note 1 in keyed notes). The details reflect a variety of different insulation thicknesses at each roof level. What insulation thickness will we be installing, and does it vary from roof level to roof level?

Answer 18.

1. The South Tower, specifically Roof Area R15A, must maintain the existing flashing heights due to the density of roof top equipment located in this area that cannot be removed or disconnected. Therefore, less than 6” insulation will be installed here as shown.

2. The North Tower is not an issue and 6” insulation can be installed as shown on the documents.

3. Due to the parapet wall mounted D-Rings that will remain in-place, flashing heights will be adjusted to terminate just underneath them.

4. The Annex roofs, unless noted otherwise, can accommodate the 6” of insulation called for.

Question 19. Please clarify if all existing concrete surfaces need to be recoated or just patched at locations that are disturbed?

General roofing plan note 9 states contractor to ensure all concrete surfaces are to be protected and sealed. If concrete surfaces are to remain they must be coated with Dow corning all guard grindstones.

Statement of work states re-coat with exact same coating material and sealant any concrete/parapet/façade portions of the building left exposed disturbed and or damaged.

Answer 19. Contractor is only expected to address locations that are damaged, disturbed and or left exposed by how the work was performed.

Question 20. What is the meaning to the abbreviation reference note N.I.E.

pointing to the South Tower on Drawing G-0002?

Answer 20. The abbreviation “N.I.E.” should be changed to “N.I.C.” and refers to the center tower roof.

Question and Answer previously posted on February 8, 2017

Question:

Specification Section 011000-3, 2.6 states approximately 20,000 square feet of roof area is included in the base bid. Can you confirm the approximate square footage?

Answer:

The sentence in Specification Section 011000 - 1.2, J.2.b is incorrect.

Please revise the sentence as follows: "Approximately 29,000 total square feet of roof will be replaced."

This is in conformance with the areas shown on the drawings.

North Tower: 9262 SF South Tower Low roof: 3938 SF South Tower High roof: 1650 SF Annex Low roof: 4985 SF Annex High roof: 9512 Total Roof SF= 29,347

Two Amendments to the Solicitation:

1. Posted as Amendment 1 SF30-16a on February 8, 2017:

Amendment to Specification Section 017320: There are two (2) roof top AC units not initially identified within the project documents (each being two (2) ton units) that have had the coolant extracted, are electrically and mechanically disconnected, and have been recently abandoned in place. The units need to be removed from the Annex roof and disposed of as part of this project.

All remaining roof penetrations, electrical cabling and piping originally used to operate and or service these two units shall be removed, cut flush to the concrete deck, and securely covered prior to installation of the new roofing assembly (similar to how other abandoned equipment is to be handled per the project documents).

2. Amendment 2 SF30 Amendment 2, Posted February 13, 2017:

ADD the following section to Specification 01100 - Summary of Work, para. 1.2.J.3:

“3. The design intent is to provide 6” of XPS insulation throughout all roof areas where existing conditions will allow. Due to the varying limitations at certain roof areas, this may not be possible. Drawings have indicated where certain roof areas will not allow 6” of new XPS insulation to be installed. In these cases, contractor shall install no less than the existing depth of insulation documented to maintain the same height as existing, without negatively impacting existing conditions, such as flashing and roof equipment curb heights, etc.”