Notice text

4 versions

Update #4 · Latest ·

This is modification 3 to the synopsis entitled Gulfstream V Nadir Viewport Installation (GVNVI), 80JSC018R008, which was posted on 12/11/2017. You are notified that the following changes are made to the synopsis: questions and answers are provided below and amendment 1 to the RFP is attached.

The following changes have been made to the RFP:  1. the proposal submission due date has been extended from Friday, January 19, 2018, to Thursday, January 25, 2018, and 2. Statement of Work section 5.9 has been updated.

Documents related to this procurement will be available over the Internet. These documents will reside on a World Wide Web (WWW) server, which may be accessed using a WWW browser application. Potential offerors are responsible for downloading their own copy of the solicitation and amendments (if any).



Q20: Since this is commercial items contract, will the government be providing quality assurance from the Defense Contract Management Agency (DCMA)?

A20: NASA does not intend to solicit DCMA quality assurance help for this project. NASA does intend to provide contractor surveillance activities per SOW Section 4.3 and Inspection clauses outlined in the Terms and Conditions sections of the RFP.


Q21: Will NASA provide the optical viewport pressure plugs for flight testing?

A21: No. Per SOW 5.1.4, the Contractor is responsible for providing optical viewport pressure plugs. Also, note that the Contractor provided pressure plugs are the FAA certificated configuration. SOW Section 5.9 has been updated to clarify ground and flight test requirements.



Q22: Are the optical viewport windows acrylic?


A22: No, per SOW 5.1.3, the optical viewport windows are glass.



Q23: What is driving the optical window fuselage stations of FS 290.5 & FS 339.5?


A23: NASA based the locations on existing GV aircraft with similar optical viewport modifications.



Q24: It is understood NASA is leveraging a previous modification on another GV aircraft. Is NASA willing to consider alternative Nadir window solutions?


A24: NASA has already completed a significant amount of work (e.g. floor modification design and window pack assembly design) based on the design requirements presented in the SOW. Although NASA is interested in creative solutions, the Contractor's proposed solution must meet SOW requirements.



Q25: Does NASA need to keep the existing oxygen bottle size, i.e. could a smaller oxygen bottle be installed?


A25: No, a smaller oxygen bottle may not be installed. Per SOW Section 5.2.1, the existing oxygen bottle will need to be relocated.



Q26: In the Statement of Work, page 9 of 24, Footnote 1, states that NASA will modify the floor structure prior to aircraft delivery. Will the technical data package be made available to the GV Nadir Port contractor in the event it is relevant to the design approach?


A26: Yes, NASA will provide the Contractor all modification drawings for the floor structure.



Q27: In the Statement of Work, page 10 of 24, Footnote 3, states NASA will provide a window pack assembly with a single and double pane configuration. Must the contractor proposed solution accommodate both solutions or is one intended for FWD and the other for AFT configurations.


A27: The Contractor's solution must accommodate both a single and double pane configuration. NASA does not intend for the window pack assemblies to be port specific. The window pack structural interface to the aircraft will be the same for both viewports and the window packs may be installed in either viewport. See drawings 25-0000054 and 25-0000055 in the solicitation technical library. Although not currently shown in drawings 25-0000054 and 25-0000055, NASA plans to design the window pack to support both a single and dual window configuration by revising the design of the window stack structure.



Q28: In the Terms and Conditions Document, section 52.212-1, paragraph (c) (page 2 of 60), states prices must be held for 30 days. However Section 52.212-1 paragraph (m) (page 6 of 60) states prices must be held for 120 days. Can you please clarify how long the offer must hold prices with the proposal submission?


A28: In accordance with 52.212-1(c), the offeror agrees to hold the prices in its offer firm for 30 calendar days from the date specified for receipt of offers, unless another time period is specified in an addendum to the solicitation. Therefore, in accordance with paragraph (m) of the addendum to 52.212-1, the offeror shall agree to hold the prices in its offer firm for 120 calendar days from the date specified for receipt of offers.



Q29: We request a 5 day extension to the proposal due date in order to review OEM manuals, mature our design approach and better identify potential risk items, considering this to be a FFP contract.


A29: Based on industry feedback, NASA has extended the proposal due date from Friday, January 19, to Thursday, January 25, 2018.



Q30: Can you please clarify Terms and Conditions, Section 52.216-90, page 45 of 60? It states the maximum ordering limit is $1,000,000. Does this mean the contract value cannot exceed $1,000,000 or that no single item (labor or ODC) may exceed $1,000,000?


A30: Clause 52.216-90, IDIQ MINIMUM AND MAXIMUM ORDERING LIMITS (AUG 2013) (JSC PROCUREMENT INSTRUCTION), will only apply to Time-and-Material (T&M) task orders issued under the resulting contract. The cumulative value of all T&M task orders issued shall not exceed $1,000,000.



Q31: Regarding the RFP to install Nadir portals in a GV aircraft, is access to Gulfstream specific data a requirement? If Gulfstream data is not available to the Contractor, will it be acceptable to do a detailed survey of the aircraft to obtain all necessary geometry and configuration data to begin the project?


A31: NASA does not require that the Contractor have access to original GV technical data such as drawings as long as the Contractor has a feasible engineering plan to obtain the necessary technical data required for the modification. The Contractor will need to have access to some Gulfstream data such maintenance manuals for aircraft disassembly, reassembly, calibration, and system checkout. See SOW Section 5.8.1.

Update #3 ·

This is modification 2 to the synopsis entitled Gulfstream V Nadir Viewport Installation (GVNVI), 80JSC018R008, which was posted on 12/11/2017. You are notified that the following changes are made to the synopsis: questions and answers are provided below.  No amendments have been made to the final RFP.


The due date for responses is not extended.


Documents related to this procurement will be available over the Internet. These documents will reside on a World Wide Web (WWW) server, which may be accessed using a WWW browser application. Potential offerors are responsible for downloading their own copy of the solicitation and amendments (if any).



Q1. Please confirm that the cover plates and corresponding station locations shown on drawing 25-0000074 are antenna cover plates and not viewport cover plates.


A1. Yes, the cover plates shown on drawing 25-0000074 are antenna cover plates, not viewport cover plates.



Q2. May the oxygen bottle be relocated?


A2. Yes, per the Statement of Work (SOW) Section 5.2, the oxygen bottle will need to be relocated since it interferes with the viewport installation.



Q3. What kind of modifications will NASA perform in preparation for the viewport installations?


A3. Per SOW, Footnote 1, NASA intends to install the extended seat tracks, viewport floor modification, and antenna relocations.



Q4. Does NASA have a preference for cockpit electrical control switch location for the Option 1, Viewport Shutter, and Option 2, Optical Viewport Window Defog System?


A4. NASA does not require the Contractor to design the cockpit electrical control switch installations for Options 1 & 2. NASA will design the cockpit switch installations. Per SOW Sections 6.1 & 6.2, the Contractor shall provide electrical connectors accessible from the pressurized interior of the aircraft to interface with the cockpit electrical control switch wiring designed by NASA.



Q5. Does NASA intend on moving the flight control cables?


A5. No. Per SOW Section 5.2.1, NASA does not require the Contractor to relocate any flight control cables and NASA has no plans to relocate flight control cables in the future.



Q6. Can the viewport centerline be offset (port or starboard) from the aircraft centerline?


A6. No. Per SOW Section 5.1.1 the viewport centerline shall be centered on the aircraft centerline.



Q7. It looks like the only aircraft systems that need to be relocated are the ones inside the gust lock and speed break cables, is that correct?


A7. No, per SOW Section 5.2, the Contractor needs to relocate all necessary aircraft systems to install the NASA-provided window pack assembly (see SOW Section 5.1.2) and Contractor-designed pressure plug (see SOW Section 5.1.4). For example, the outer flange on the NASA-provided window pack assembly (see drawing 25-0000055) has an outside diameter of approximately 23.6 inches which is much larger than 17.4 inches clear aperture referenced in the SOW. Additionally, the Contractor needs to consider what aircraft systems need to be relocated based on the Contractor design, such as fuselage reinforcement structure.



Q8. Section 5.7 specifies a quality management system compliant with the requirements of SAE AS9100 QMS. Will the lack of AS9100 QMS certification disqualify a vendor from being awarded the bid work?


A8. No, lack of AS9100 QMS certification does not disqualify a vendor. Per SOW Section 5.7, NASA requires AS9100 compliance; NASA does not require AS9100 certification.



Q9. Will NASA consider a 15-day extension to the RFP response time?


A9. The Government does not intend to allow for an extension to the existing proposal due date.



Q10. Please confirm that NASA intends to install circular windows and not square windows.


A10. Yes, per SOW Section 5.1.1, NASA's requires circular viewport windows.



Q11. Will NASA provide GV tech data?


A11. No, the Contractor will need to have access to all required Gulfstream GV aircraft technical data. NASA will only be providing the technical data made available for the Aircraft Survey which includes the seat track installation, floor modification, and GV viewport modification reference data.



Q12. Will NASA provide aircraft shoring?


A12. No, per SOW Section 5.8.2, it is the Contractors responsibility to provide all required tooling, and per SOW Section 5.8.4, a detailed aircraft shoring plan.



Q13. Will the aircraft need to be cradled to install the viewports?


A13. Yes, per SOW Section 5.8.2, it is the Contractor's responsibility to provide all required tooling, and per SOW Section 5.8.4, a detailed aircraft shoring plan.



Q14. Will the test flights be performed with NASA crew or contractor crew?


A14. Per SOW, Footnote 8, NASA will supply pilots for test flights.



Q15. When the contractor receives the aircraft, will the NASA structural modifications already be completed?


A15. Yes. It is NASA's intent to have all of the NASA modifications outlined in SOW Footnote 1, completed prior to aircraft delivery to the Contractor.



Q16. Is there any intent to combine the GV viewport modification with the GV Synthetic Aperture Radar effort currently out for Request For Information?


A16. No. NASA does not intend to combine these solicitations.



Q17. Are the viewport windows going to be acrylic?


A17. No, per SOW Section 5.1.3, the viewport windows are glass.



Q18. Is NASA changing the seat tracks?


A18. NASA is installing new continuous seat tracks in the existing seat track locations.



Q19. Will the viewport installation be permanent, i.e. does NASA have any plans to return the aircraft to its original configuration?


A19. NASA intends for the viewport modification to be permanent.


 

Update #2 ·

This is modification 1 to the synopsis entitled Gulfstream V Nadir Viewport Installation (GVNVI), 80JSC018R008, which was posted on 12/11/2017. You are notified that the following changes are made: The final RFP, and all applicable documents have been posted.


The due date for responses is not extended.


Documents related to this procurement will be available over the Internet.  These documents will reside on a World Wide Web (WWW) server, which may be accessed using a WWW browser application.  Potential offerors are responsible for downloading their own copy of the solicitation and amendments (if any).

Update #1 ·

NASA/JSC plans to issue a Request for Proposal (RFP) for the following Commercial item/services: Gulfstream V Nadir Viewport.


This procurement is a total small business set-aside.  


The NAICS Code and Size Standard are 336411, Aircraft Manufacturing, and 1,500 employees, respectively. 


The release date of RFP 80JSC018R0008 is on 12/11/2017 with an anticipated proposal due date of on or about 01/19/2018.


The Government anticipates a 2.5-year period of performance for the baseline work and all options, if exercised. There will be no phase-in period for this contract.


All responsible sources may submit a proposal which shall be considered by the agency. The government is not obligated to award a contract as a result of the RFP.


Aircraft Survey
NASA intends to make the GV aircraft and some technical data available for a vendor survey as indicated below:


a)      Schedule: offerors will be allowed 1 hour each for the survey during the following dates and times.


 


Dates:                   12/18/2017 thru 12/22/2017


Times:                   7:30 AM – 2:00 PM


 


b)      Offerors shall provide NASA a minimum of three business days’ notice if interested in scheduling an aircraft survey. Appointments shall be made by sending a request to David McMahon via email at david.mcmahon@nasa.gov. The subject of the email shall be “80JSC018R0008 – Aircraft Survey”.


c)       The aircraft will be configured with floor panels removed over the areas where the optical viewports will be installed to allow contractors to survey the current aircraft configuration.


d)      Due to aircraft space limitations, representation of any potential Offeror may not exceed three (3) company representatives/persons per Offeror.


e)      Interested parties are encouraged to submit written questions following the aircraft survey. The official answers to questions will be posted to the procurement website after all offeror aircraft surveys have been completed.


f)       Attendance at the aircraft survey is recommended; however, attendance is neither required nor a prerequisite for proposal/bid submission and will not be considered in the evaluation.


 


NASA Clause 1852.215-84, Ombudsman, is applicable.  The Center Ombudsman for this acquisition can be found at http://prod.nais.nasa.gov/pub/pub_library/Omb.html. 


All contractual and technical questions must be submitted in writing (e-mail or FAX) to Portia Keyes (portia.s.keyes@nasa.gov) or Alice Pursell (alice.j.pursell@nasa.gov) not later than 01/05/2018.  Telephone questions will not be accepted.


Potential offerors may locate the technical library by visiting the GVNVI website at https://procurement.jsc.nasa.gov/gvnvi/ .


The solicitation and any documents related to this procurement will be available over the Internet. These documents will reside on a World-Wide Web (WWW) server, which may be accessed using a WWW browser application.


It is the offeror's responsibility to monitor the Internet site for the release of amendments (if any). Potential offerors will be responsible for downloading their own copy of the solicitation and amendments (if any). 


 

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity