80JSC018R0008_-_GVNVI_RFP_-_Amendment_1.pdf
PDF 367 KB Posted
- Attached to
- Gulfstream Nadir Viewport Installation (GVNVI)
- Solicitation number
- 80JSC018R0008
About this file
RFP Amendment 1
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 80JSC018R0008_-_GVNVI_RFP_-_Statement_of_Work_-_Amendment_1.docx | DOCX document | |
| 80JSC018R0008_-_GVNVI_RFP_-_SF_1449_-_Amendment_1.pdf | ||
| 80JSC018R0008_-_GVNVI_RFP_-_Terms_and_Conditions.docx | DOCX document | |
| 80JSC018R0008_-_GVNVI_RFP_-_SF_1449.pdf | ||
| 80JSC018R0008_-_GVNVI_RFP_-_Cover_Letter.pdf | ||
| 80JSC018R0008_-_GVNVI_RFP_-_Statement_of_Work.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
80JSC018R0008 – Gulfstream V Nadir Viewport Installation (GVNVI) Amendment 1
SF30 Block 14. DESCRIPTION OF AMENDMENT/MODIFICATION The purpose of this Amendment 1 to the Request for Proposal, 80JSC018R0008, is to:
1. Extend the proposal submission due date from Friday, January 19, to Thursday, January 25, 2018.
See Attachment: 80JSC018R0008 - GVNVI RFP – SF 1449 – Amendment 1
2. Update Section 5.9, Ground and Flight Testing, of the 80JSC018R0008 – GVNVI RFP – Statement of Work to clarify instructions.
Section 5.9 is hereby deleted in its entirety and replaced by the following:
5.9 Ground & Flight Testing
5.9.1 Ground Testing
The Contractor shall prepare written ground test plans, provide all test instrumentation and test fixtures, and perform ground testing as required to verify design requirements and aircraft modifications (e.g. ground pressure test). The written test plans shall be approved by NASA prior to test start. In particular, the Contractor shall:
a) Perform instrumented tests to verify the optical viewport structural design requirements listed in Section 5.1.3.
b) Test both the Contractor provided window plug and NASA provided window pack configurations.
c) Provide machined plates representative of glass windows to install in the NASA provided window pack assembly.
d) Document the results of all tests in a written report. Reference AOD 33840, Flight Readiness Review and Test Readiness Review and AOD 33843, Flight Test.
5.9.2 Flight Testing
The Contractor shall prepare written flight test plans, provide all test instrumentation and test fixtures, and support flight testing as required to verify design requirements and aircraft modifications (e.g. functional test flight). The written test plans shall be approved by NASA prior to test start. In particular, the Contractor shall:
a) Perform instrumented tests to verify the optical viewport structural design requirements listed in Section 5.1.3.
b) Test both the Contractor provided window plug and NASA provided window pack configurations.
c) Provide machined plates representative of glass windows to install in the NASA provided window pack assembly.
d) Document the results of all tests in a written report. Reference AOD 33840, Flight Readiness Review and Test Readiness Review and AOD 33843, Flight Test.
80JSC018R0008 – Gulfstream V Nadir Viewport Installation (GVNVI) Amendment 1
See Attachment: 80JSC018R0008 - GVNVI RFP – Statement of Work – Amendment 1
3. Post Part II of the Questions and Answers.
See Attachment: 80JSC018R0008 - GVNVI RFP – Q and A Part II
Except as provided herein, all terms and conditions remain unchanged and in full force and effect.