GSA Design Excellence Project - D-B - Dunseith, ND Land Port of Entry - Phase 1 Solicitation

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
47PJ0023R0041
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Dunseith, North Dakota, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The federal contract opportunity is for the design and construction of the Dunseith Land Port of Entry facilities in North Dakota. The project includes a new main inspection building, primary inspection canopy, non-commercial secondary canopy, hard inspection building, four new covered primary inspection lanes, new commercial secondary inspection dock and facility, and NII building. The total contract estimated price range is between $70,000,000 and $80,000,000, with the submission due date/time being 10:00 AM Mountain time, July 11, 2023.

List of services/products to be provided:

  1. Design of Dunseith Land Port of Entry facilities
  2. Construction of a new main inspection building
  3. Construction of a primary inspection canopy
  4. Construction of a non-commercial secondary canopy
  5. Construction of a hard inspection building adjacent to the main building
  6. Construction of four new covered primary inspection lanes
  7. Construction of a new commercial secondary inspection dock and facility
  8. Construction of an NII building.

Notice text

6 versions

Update #6 · Latest ·

ANNOUNCEMENT OF SHORTLISTED OFFERORS

September 23, 2023 – The list of shortlisted offerors for design-build services for the new construction of the Dunseith, North Dakota, Land Port of Entry (LPOE) is provided as follows in alphabetical order:

Korte Construction Company

Address: 5700 Oakland Ave. Ste 275, Saint Louis, MO  83110-1375

Phone: 618.654.8611

McGough Construction Company

Address: 2737 Fairview Ave N, Saint Paul, MN  55113-1307

Phone: 651.900.4706

M.A. Mortenson Company

Address: 700 Meadow Ln N, Minneapolis, MN  55422-4837

Phone: 763.287.5865

Businesses who are interested in partnering or subcontract opportunities should contact the above firms directly.

-----------------------------------------------------------------------------------------------------------------------

Amendment 0004:

Amendment 0004 is issued to correct minor errors to; 1) evaluation Subfactor 1B: Past Experience of the A/E Firm, and 2) Subfactor 2A: Past Performance of the General Contractor.     

The following revised documents are provided under the cover of this Amendment and are hereby incorporated into the Solicitation:

  • A. The Solicitation - Phase 1, revision 03 dated July 25, 2023

Offerors shall submit completed and signed copies of Amendment 0004 to the Contracting Officer by the response due date/time.

-----------------------------------------------------------------------------------------------------------------------

Amendment 0003:

Amendment 0003 is issued to; 1) provide additional answers to questions received in writing in response to the solicitation document. 

Offerors shall submit completed and signed copies of Amendment 0003 to the Contracting Officer by the response due date/time.

-----------------------------------------------------------------------------------------------------------------------

Amendment 0002:

Amendment 0002 is issued to; 1) provide additional answers to questions received in writing in response to the solicitation document, and 2) change the Phase 1 Similar Project definition. 

The following revised documents are provided under the cover of this Amendment and are hereby incorporated into the Solicitation:

  • A. The Solicitation - Phase 1, revision 02 dated June 29, 2023
  • F.  Solicitation Attachment 04 - Past Performance Questionnaire for General Contractor, revision 02 dated June 29, 2023
  • G.  Solicitation Attachment 05 - Past Performance Questionnaire for Architect-Engineer, revision 02 dated June 29, 2023

Offerors shall submit completed and signed copies of Amendment 0002 to the Contracting Officer.

-----------------------------------------------------------------------------------------------------------------------

Amendment 0001:

Amendment 0001 is issued to; 1) provide answers to questions received in writing in response to the solicitation document, 2) change the Phase 1 Similar Project definition, and 3) change the Evaluation Factor 4 submittal requirement. 

The following revised documents are provided under the cover of this Amendment and are hereby incorporated into the Solicitation:

  • A. The Solicitation - Phase 1, revision 01 dated June 26, 2023
  • F.  Solicitation Attachment 04 - Past Performance Questionnaire for General Contractor, revision 01 dated June 26, 2023
  • G.  Solicitation Attachment 05 - Past Performance Questionnaire for Architect-Engineer, revision 01 dated June 26, 2023

Offerors shall submit a signed copy of Amendment 0001 to the Contracting Officer.

-----------------------------------------------------------------------------------------------------------------------

GSA Design Excellence Project - D-B - Dunseith, ND Land Port of Entry - Phase 1 Solicitation

This project is for the design and construction of the Dunseith Land Port of Entry facilities, which will include a new main inspection building, primary inspection canopy, non-commercial secondary canopy, and hard inspection building adjacent to the main building. Construction of four new covered primary inspection lanes, new commercial secondary inspection dock and facility, and NII building. This project is designated as a GSA Design Excellence project.

PHASE 1 – REQUEST FOR QUALIFICATIONS

The Phase 1 Solicitation documents are comprised of the following:

A. The Solicitation – Phase 1

B. Standard Form (SF) 1442 – Solicitation Offer and Award

C. Solicitation Attachment 01 – Request for Controlled Unclassified Information (CUI)

D. Solicitation Attachment 02 – Offeror’s Representations and Certifications

E. Solicitation Attachment 03 – ASHRAE – Climatic Data for Building Design Standards

F. Solicitation Attachment 04 – Past Performance Questionnaire for General Contractor

G. Solicitation Attachment 05 – Past Performance Questionnaire for Architect-Engineer

H. Draft of The Agreement

I. Draft of the Scope of Work, Appendix, Exhibits, and Other Documents

Scope of Work documents are available. To receive a copy of the scope of work documents, offerors must first complete the provided CUI Information Request Form (Solicitation Attachment 01 – Request for Controlled Unclassified Information (CUI)) and return the completed/signed document to both the Contracting Officer at Rhonda.Widick@gsa.gov and the Contract Specialist at Christie.VandenDries@gsa.gov. Documents will be distributed to Offerors who return properly completed forms.

All questions related to solicitation 47PJ0023R0041 shall be submitted in writing via email, to both the Contracting Officer and Contract Specialist, no later than 10:00 AM Mountain Time, June 26, 2023. Questions received after this cutoff may not receive a response.

All Phase 1 qualification submissions must be submitted via email and received by the Government no later than 10:00 AM, Mountain Time, July 27, 2023 (Revised via Amendment 0001).

Update #5 ·

Amendment 0004:

Amendment 0004 is issued to correct minor errors to; 1) evaluation Subfactor 1B: Past Experience of the A/E Firm, and 2) Subfactor 2A: Past Performance of the General Contractor.     

The following revised documents are provided under the cover of this Amendment and are hereby incorporated into the Solicitation:

  • A. The Solicitation - Phase 1, revision 03 dated July 25, 2023

Offerors shall submit completed and signed copies of Amendment 0004 to the Contracting Officer by the response due date/time.

-----------------------------------------------------------------------------------------------------------------------

Amendment 0003:

Amendment 0003 is issued to; 1) provide additional answers to questions received in writing in response to the solicitation document. 

Offerors shall submit completed and signed copies of Amendment 0003 to the Contracting Officer by the response due date/time.

-----------------------------------------------------------------------------------------------------------------------

Amendment 0002:

Amendment 0002 is issued to; 1) provide additional answers to questions received in writing in response to the solicitation document, and 2) change the Phase 1 Similar Project definition. 

The following revised documents are provided under the cover of this Amendment and are hereby incorporated into the Solicitation:

  • A. The Solicitation - Phase 1, revision 02 dated June 29, 2023
  • F.  Solicitation Attachment 04 - Past Performance Questionnaire for General Contractor, revision 02 dated June 29, 2023
  • G.  Solicitation Attachment 05 - Past Performance Questionnaire for Architect-Engineer, revision 02 dated June 29, 2023

Offerors shall submit completed and signed copies of Amendment 0002 to the Contracting Officer.

-----------------------------------------------------------------------------------------------------------------------

Amendment 0001:

Amendment 0001 is issued to; 1) provide answers to questions received in writing in response to the solicitation document, 2) change the Phase 1 Similar Project definition, and 3) change the Evaluation Factor 4 submittal requirement. 

The following revised documents are provided under the cover of this Amendment and are hereby incorporated into the Solicitation:

  • A. The Solicitation - Phase 1, revision 01 dated June 26, 2023
  • F.  Solicitation Attachment 04 - Past Performance Questionnaire for General Contractor, revision 01 dated June 26, 2023
  • G.  Solicitation Attachment 05 - Past Performance Questionnaire for Architect-Engineer, revision 01 dated June 26, 2023

Offerors shall submit a signed copy of Amendment 0001 to the Contracting Officer.

-----------------------------------------------------------------------------------------------------------------------

GSA Design Excellence Project - D-B - Dunseith, ND Land Port of Entry - Phase 1 Solicitation

This project is for the design and construction of the Dunseith Land Port of Entry facilities, which will include a new main inspection building, primary inspection canopy, non-commercial secondary canopy, and hard inspection building adjacent to the main building. Construction of four new covered primary inspection lanes, new commercial secondary inspection dock and facility, and NII building. This project is designated as a GSA Design Excellence project.

PHASE 1 – REQUEST FOR QUALIFICATIONS

The Phase 1 Solicitation documents are comprised of the following:

A. The Solicitation – Phase 1

B. Standard Form (SF) 1442 – Solicitation Offer and Award

C. Solicitation Attachment 01 – Request for Controlled Unclassified Information (CUI)

D. Solicitation Attachment 02 – Offeror’s Representations and Certifications

E. Solicitation Attachment 03 – ASHRAE – Climatic Data for Building Design Standards

F. Solicitation Attachment 04 – Past Performance Questionnaire for General Contractor

G. Solicitation Attachment 05 – Past Performance Questionnaire for Architect-Engineer

H. Draft of The Agreement

I. Draft of the Scope of Work, Appendix, Exhibits, and Other Documents

Scope of Work documents are available. To receive a copy of the scope of work documents, offerors must first complete the provided CUI Information Request Form (Solicitation Attachment 01 – Request for Controlled Unclassified Information (CUI)) and return the completed/signed document to both the Contracting Officer at Rhonda.Widick@gsa.gov and the Contract Specialist at Christie.VandenDries@gsa.gov. Documents will be distributed to Offerors who return properly completed forms.

All questions related to solicitation 47PJ0023R0041 shall be submitted in writing via email, to both the Contracting Officer and Contract Specialist, no later than 10:00 AM Mountain Time, June 26, 2023. Questions received after this cutoff may not receive a response.

All Phase 1 qualification submissions must be submitted via email and received by the Government no later than 10:00 AM, Mountain Time, July 27, 2023 (Revised via Amendment 0001).

Update #4 ·

Amendment 0003:

Amendment 0003 is issued to; 1) provide additional answers to questions received in writing in response to the solicitation document. 

Offerors shall submit completed and signed copies of Amendment 0003 to the Contracting Officer by the response due date/time.

-----------------------------------------------------------------------------------------------------------------------

Amendment 0002:

Amendment 0002 is issued to; 1) provide additional answers to questions received in writing in response to the solicitation document, and 2) change the Phase 1 Similar Project definition. 

The following revised documents are provided under the cover of this Amendment and are hereby incorporated into the Solicitation:

  • A. The Solicitation - Phase 1, revision 02 dated June 29, 2023
  • F.  Solicitation Attachment 04 - Past Performance Questionnaire for General Contractor, revision 02 dated June 29, 2023
  • G.  Solicitation Attachment 05 - Past Performance Questionnaire for Architect-Engineer, revision 02 dated June 29, 2023

Offerors shall submit completed and signed copies of Amendment 0002 to the Contracting Officer.

-----------------------------------------------------------------------------------------------------------------------

Amendment 0001:

Amendment 0001 is issued to; 1) provide answers to questions received in writing in response to the solicitation document, 2) change the Phase 1 Similar Project definition, and 3) change the Evaluation Factor 4 submittal requirement. 

The following revised documents are provided under the cover of this Amendment and are hereby incorporated into the Solicitation:

  • A. The Solicitation - Phase 1, revision 01 dated June 26, 2023
  • F.  Solicitation Attachment 04 - Past Performance Questionnaire for General Contractor, revision 01 dated June 26, 2023
  • G.  Solicitation Attachment 05 - Past Performance Questionnaire for Architect-Engineer, revision 01 dated June 26, 2023

Offerors shall submit a signed copy of Amendment 0001 to the Contracting Officer.

-----------------------------------------------------------------------------------------------------------------------

GSA Design Excellence Project - D-B - Dunseith, ND Land Port of Entry - Phase 1 Solicitation

This project is for the design and construction of the Dunseith Land Port of Entry facilities, which will include a new main inspection building, primary inspection canopy, non-commercial secondary canopy, and hard inspection building adjacent to the main building. Construction of four new covered primary inspection lanes, new commercial secondary inspection dock and facility, and NII building. This project is designated as a GSA Design Excellence project.

PHASE 1 – REQUEST FOR QUALIFICATIONS

The Phase 1 Solicitation documents are comprised of the following:

A. The Solicitation – Phase 1

B. Standard Form (SF) 1442 – Solicitation Offer and Award

C. Solicitation Attachment 01 – Request for Controlled Unclassified Information (CUI)

D. Solicitation Attachment 02 – Offeror’s Representations and Certifications

E. Solicitation Attachment 03 – ASHRAE – Climatic Data for Building Design Standards

F. Solicitation Attachment 04 – Past Performance Questionnaire for General Contractor

G. Solicitation Attachment 05 – Past Performance Questionnaire for Architect-Engineer

H. Draft of The Agreement

I. Draft of the Scope of Work, Appendix, Exhibits, and Other Documents

Scope of Work documents are available. To receive a copy of the scope of work documents, offerors must first complete the provided CUI Information Request Form (Solicitation Attachment 01 – Request for Controlled Unclassified Information (CUI)) and return the completed/signed document to both the Contracting Officer at Rhonda.Widick@gsa.gov and the Contract Specialist at Christie.VandenDries@gsa.gov. Documents will be distributed to Offerors who return properly completed forms.

All questions related to solicitation 47PJ0023R0041 shall be submitted in writing via email, to both the Contracting Officer and Contract Specialist, no later than 10:00 AM Mountain Time, June 26, 2023. Questions received after this cutoff may not receive a response.

All Phase 1 qualification submissions must be submitted via email and received by the Government no later than 10:00 AM, Mountain Time, July 27, 2023 (Revised via Amendment 0001).

Update #3 ·

Amendment 0002:

Amendment 0002 is issued to; 1) provide additional answers to questions received in writing in response to the solicitation document, and 2) change the Phase 1 Similar Project definition. 

The following revised documents are provided under the cover of this Amendment and are hereby incorporated into the Solicitation:

  • A. The Solicitation - Phase 1, revision 02 dated June 29, 2023
  • F.  Solicitation Attachment 04 - Past Performance Questionnaire for General Contractor, revision 02 dated June 29, 2023
  • G.  Solicitation Attachment 05 - Past Performance Questionnaire for Architect-Engineer, revision 02 dated June 29, 2023

Offerors shall submit completed and signed copies of Amendment 0002 to the Contracting Officer.

-----------------------------------------------------------------------------------------------------------------------

Amendment 0001:

Amendment 0001 is issued to; 1) provide answers to questions received in writing in response to the solicitation document, 2) change the Phase 1 Similar Project definition, and 3) change the Evaluation Factor 4 submittal requirement. 

The following revised documents are provided under the cover of this Amendment and are hereby incorporated into the Solicitation:

  • A. The Solicitation - Phase 1, revision 01 dated June 26, 2023
  • F.  Solicitation Attachment 04 - Past Performance Questionnaire for General Contractor, revision 01 dated June 26, 2023
  • G.  Solicitation Attachment 05 - Past Performance Questionnaire for Architect-Engineer, revision 01 dated June 26, 2023

Offerors shall submit a signed copy of Amendment 0001 to the Contracting Officer.

-----------------------------------------------------------------------------------------------------------------------

GSA Design Excellence Project - D-B - Dunseith, ND Land Port of Entry - Phase 1 Solicitation

This project is for the design and construction of the Dunseith Land Port of Entry facilities, which will include a new main inspection building, primary inspection canopy, non-commercial secondary canopy, and hard inspection building adjacent to the main building. Construction of four new covered primary inspection lanes, new commercial secondary inspection dock and facility, and NII building. This project is designated as a GSA Design Excellence project.

PHASE 1 – REQUEST FOR QUALIFICATIONS

The Phase 1 Solicitation documents are comprised of the following:

A. The Solicitation – Phase 1

B. Standard Form (SF) 1442 – Solicitation Offer and Award

C. Solicitation Attachment 01 – Request for Controlled Unclassified Information (CUI)

D. Solicitation Attachment 02 – Offeror’s Representations and Certifications

E. Solicitation Attachment 03 – ASHRAE – Climatic Data for Building Design Standards

F. Solicitation Attachment 04 – Past Performance Questionnaire for General Contractor

G. Solicitation Attachment 05 – Past Performance Questionnaire for Architect-Engineer

H. Draft of The Agreement

I. Draft of the Scope of Work, Appendix, Exhibits, and Other Documents

Scope of Work documents are available. To receive a copy of the scope of work documents, offerors must first complete the provided CUI Information Request Form (Solicitation Attachment 01 – Request for Controlled Unclassified Information (CUI)) and return the completed/signed document to both the Contracting Officer at Rhonda.Widick@gsa.gov and the Contract Specialist at Christie.VandenDries@gsa.gov. Documents will be distributed to Offerors who return properly completed forms.

All questions related to solicitation 47PJ0023R0041 shall be submitted in writing via email, to both the Contracting Officer and Contract Specialist, no later than 10:00 AM Mountain Time, June 26, 2023. Questions received after this cutoff may not receive a response.

All Phase 1 qualification submissions must be submitted via email and received by the Government no later than 10:00 AM, Mountain Time, July 27, 2023 (Revised via Amendment 0001).

Update #2 ·

Amendment 0001:

Amendment 0001 is issued to; 1) provide answers to questions received in writing in response to the solicitation document, 2) change the Phase 1 Similar Project definition, and 3) change the Evaluation Factor 4 submittal requirement. 

The following revised documents are provided under the cover of this Amendment and are hereby incorporated into the Solicitation:

  • A. The Solicitation - Phase 1, revision 01 dated June 26, 2023
  • F.  Solicitation Attachment 04 - Past Performance Questionnaire for General Contractor, revision 01 dated June 26, 2023
  • G.  Solicitation Attachment 05 - Past Performance Questionnaire for Architect-Engineer, revision 01 dated June 26, 2023

Offerors shall submit a signed copy of Amendment 0001 to the Contracting Officer.

-----------------------------------------------------------------------------------------------------------------------

GSA Design Excellence Project - D-B - Dunseith, ND Land Port of Entry - Phase 1 Solicitation

This project is for the design and construction of the Dunseith Land Port of Entry facilities, which will include a new main inspection building, primary inspection canopy, non-commercial secondary canopy, and hard inspection building adjacent to the main building. Construction of four new covered primary inspection lanes, new commercial secondary inspection dock and facility, and NII building. This project is designated as a GSA Design Excellence project.

PHASE 1 – REQUEST FOR QUALIFICATIONS

The Phase 1 Solicitation documents are comprised of the following:

A. The Solicitation – Phase 1

B. Standard Form (SF) 1442 – Solicitation Offer and Award

C. Solicitation Attachment 01 – Request for Controlled Unclassified Information (CUI)

D. Solicitation Attachment 02 – Offeror’s Representations and Certifications

E. Solicitation Attachment 03 – ASHRAE – Climatic Data for Building Design Standards

F. Solicitation Attachment 04 – Past Performance Questionnaire for General Contractor

G. Solicitation Attachment 05 – Past Performance Questionnaire for Architect-Engineer

H. Draft of The Agreement

I. Draft of the Scope of Work, Appendix, Exhibits, and Other Documents

Scope of Work documents are available. To receive a copy of the scope of work documents, offerors must first complete the provided CUI Information Request Form (Solicitation Attachment 01 – Request for Controlled Unclassified Information (CUI)) and return the completed/signed document to both the Contracting Officer at Rhonda.Widick@gsa.gov and the Contract Specialist at Christie.VandenDries@gsa.gov. Documents will be distributed to Offerors who return properly completed forms.

All questions related to solicitation 47PJ0023R0041 shall be submitted in writing via email, to both the Contracting Officer and Contract Specialist, no later than 10:00 AM Mountain Time, June 26, 2023. Questions received after this cutoff may not receive a response.

All Phase 1 qualification submissions must be submitted via email and received by the Government no later than 10:00 AM, Mountain Time, July 27, 2023 (Revised via Amendment 0001).

Update #1 ·

GSA Design Excellence Project - D-B - Dunseith, ND Land Port of Entry - Phase 1 Solicitation

This project is for the design and construction of the Dunseith Land Port of Entry facilities, which will include a new main inspection building, primary inspection canopy, non-commercial secondary canopy, and hard inspection building adjacent to the main building. Construction of four new covered primary inspection lanes, new commercial secondary inspection dock and facility, and NII building. This project is designated as a GSA Design Excellence project.

PHASE 1 – REQUEST FOR QUALIFICATIONS

The Phase 1 Solicitation documents are comprised of the following:

A. The Solicitation – Phase 1

B. Standard Form (SF) 1442 – Solicitation Offer and Award

C. Solicitation Attachment 01 – Request for Controlled Unclassified Information (CUI)

D. Solicitation Attachment 02 – Offeror’s Representations and Certifications

E. Solicitation Attachment 03 – ASHRAE – Climatic Data for Building Design Standards

F. Solicitation Attachment 04 – Past Performance Questionnaire for General Contractor

G. Solicitation Attachment 05 – Past Performance Questionnaire for Architect-Engineer

H. Draft of The Agreement

I. Draft of the Scope of Work, Appendix, Exhibits, and Other Documents

Scope of Work documents are available. To receive a copy of the scope of work documents, offerors must first complete the provided CUI Information Request Form (Solicitation Attachment 01 – Request for Controlled Unclassified Information (CUI)) and return the completed/signed document to both the Contracting Officer at Rhonda.Widick@gsa.gov and the Contract Specialist at Christie.VandenDries@gsa.gov. Documents will be distributed to Offerors who return properly completed forms.

All questions related to solicitation 47PJ0023R0041 shall be submitted in writing via email, to both the Contracting Officer and Contract Specialist, no later than 10:00 AM Mountain Time, June 26, 2023. Questions received after this cutoff may not receive a response.

All Phase 1 qualification submissions must be submitted via email and received by the Government no later than 10:00 AM, Mountain Time, July 11, 2023.

Files

File Type Posted
20230725 - Amendment 0004 - Standard Form 30 - Correction of Minor Errors.pdf PDF
20230725 - Amendment 0004 - The Solicitation - Phase 1 - Revision 03 dated July 25 2023.pdf PDF
Amendment 0003 - Standard Form 30 - Questions and Answers.pdf PDF
20230629 - Amendment 0002 - G. SOLICITATION ATTACHMENT 05 - Past Performance Questionnaire for Architect Engineer - Revision 02 dated June 29, 2023.pdf PDF
20230629 - Amendment 0002 - F. SOLICITATION ATTACHMENT 04 - Past Performance Questionnaire for General Contractor - Revision 02 dated June 29, 2023.pdf PDF
F. SOLICITATION ATTACHMENT 04 - Past Performance Questionnaire for General Contractor - Revision 02 dated June 29, 2023.pdf PDF
G. SOLICITATION ATTACHMENT 05 - Past Performance Questionnaire for Architect Engineer - Revision 02 dated June 29, 2023.pdf PDF
A. The Solicitation - Phase 1 - Revision 02 dated June 29, 2023.pdf PDF
Amendment 0002 - Standard Form 30 - Questions and Answers.pdf PDF
G. SOLICITATION ATTACHMENT 05 - Past Performance Questionnaire for Architect Engineer - Revision 01 dated June 26, 2023.pdf PDF
F. SOLICITATION ATTACHMENT 04 - Past Performance Questionnaire for General Contractor - Revision 01 dated June 26, 2023.pdf PDF
Amendment 0001 - Standard Form 30 - Questions and Answerss.pdf PDF
A. The Solicitation - Phase 1 - Revision 01 dated June 26, 2023.pdf PDF
F. SOLICITATION ATTACHMENT 04 - Past Performance Questionnaire for General Contractor.pdf PDF
G. SOLICITATION ATTACHMENT 05 - Past Performance Questionnaire for Architect Engineer.pdf PDF
A. The Solicitation - Phase 1.pdf PDF
B. Standard Form (SF) 1442 - Solicitation Offer and Award.pdf PDF
F. SOLICITATION ATTACHMENT 04 - Past Performance Questionnaire for General Contractor.pdf PDF
G. SOLICITATION ATTACHMENT 05 - Past Performance Questionnaire for Architect Engineer.pdf PDF
C. SOLICITATION ATTACHMENT 01 - Request for Controlled Unclassified Information (CUI).pdf PDF
D. SOLICITATION ATTACHMENT 02 - Offeror's Representations and Certifications.pdf PDF
E. SOLICITATION ATTACHMENT 03 - ASHRAE - Climatic Data for Building Design Standards.pdf PDF
H. DRAFT of The Agreement.pdf PDF
Show all 23

Notice history

Notice Type Posted
GSA Design Excellence Project - D-B - Dunseith, ND Land Port of Entry - Phase 1 Solicitation Award Award Notice
This notice Latest solicitation Solicitation
D-B - Dunseith, ND Land Port of Entry Pre-Solicitation
Industry Day D-B - Dunseith, ND Land Port of Entry Special Notice
D-B - Dunseith, ND Land Port of Entry Special Notice
D-B - Dunseith, ND Land Port of Entry Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
SOLICITATION NOTICE- Massena NY Virtual Law Enforcement Training Facility- Construction Massena, New York 13662, United States · NAICS 236220 — Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors