GPO Room C109 Police Locker Room Design/Build Construction

Closed Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest special notice from .

Solicitation number
040ADV-25-R-0027
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Washington, District of Columbia 20401, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Government Publishing Office (GPO) is seeking a Design-Build contractor to renovate Room C-109 at their Washington, DC facility into a new Police Locker Room. The contractor will be required to develop a complete design based on provided conceptual drawings and perform comprehensive renovations covering all building systems including HVAC, electrical, architectural, fire protection, and security systems. The project involves significant challenges including asbestos abatement, as testing revealed chrysotile asbestos in ceiling materials and floor tiles that must be properly removed before construction begins. The procurement will use a best-value tradeoff evaluation process, with technical factors including Technical Capability and Management Plan, Key Personnel, and Past Performance weighted more heavily than price. Proposals are due by 5:00 PM EST on August 25, 2025, with a mandatory site visit scheduled for July 3, 2025.

This solicitation does not include any set-aside designation and is open to all qualified contractors. No incumbent contractors or current service providers are identified in the documentation. While no specific contract value is disclosed, the project scope encompasses 2,483 square feet of renovation work with a performance period of 415 days for completion. The work will be performed at the GPO facility located at 732 N. Capitol Street, Washington, DC 20401, and involves transforming the existing space into a fully functional police facility with break rooms, offices, separate men's and women's locker rooms, evidence room, lunch room, and shower facilities. The renovation requires compliance with national design and construction standards and represents a comprehensive modernization of the existing space to meet current operational requirements for the GPO's Uniformed Police Branch.

Notice text

Government Publishing Office (GPO), Facilities Managment requires a Design-Build (DB) project to repair/renovate building (C) 1st floor room C-109. A Contractor will be selected and required to develop a full realized design based off a provided conceptual drawing. The Contractor will also perform the required repairs and renovations for the facility to be utilized as a new Police Locker Room. Repair and Renovation shall include all systems (HVAC, Electrical, Architecture of the interior and exterior, Fire Protection, and Security) in accordance with the SOW and applicable codes of National Design and Construction standards. GPO is located at 732 N. Capitol Street Washington, DC 20401.

Files

Notice history

Notice Type Posted
GPO Room C109 Police Locker Room Design/Build Construction Award Award Notice
GPO Room C109 Police Locker Room Design/Build Construction Latest special notice Special Notice
This notice Original Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Design Build Markey DC0094ZZ Multi Floor Interior Finish Improvements Washington, District of Columbia 20011, United States · NAICS 236220 — Competitive 8(a)

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors