J.6 - Cost-Price Proposal - Excel.xlsx

XLSX spreadsheet 10 KB Posted

Attached to
GPO Room C109 Police Locker Room Design/Build Construction
Solicitation number
040ADV-25-R-0027
Issued by

About this file

The file is a Cost-Price Proposal Excel spreadsheet for a Design-Build project at the Government Publishing Office (GPO) for renovating Room C-109 as a Police Locker Room. The proposal is structured with three Contract Line Item Numbers (CLINs): CLIN 0001 covers the Design Phase, including site survey across multiple disciplines (architectural, civil, HVAC, fire), design development, and design administration; CLIN 0002 addresses the Construction Phase, involving personnel mobilization, construction management for 200 calendar days, demolition labor and materials; and CLIN 0003 focuses on Quality Assurance/Quality Control, including bonds and design contingency. Despite the breakdown, the total price is listed as $0.00, which may indicate a placeholder or incomplete pricing document.

The related federal contract opportunity (Solicitation Number 040ADV-25-R-0027) seeks a contractor to develop a full design based on a conceptual drawing and perform comprehensive repairs and renovations for the police locker room. The project requires work on all building systems including HVAC, electrical, architectural (interior and exterior), fire protection, and security, to be completed in accordance with national design and construction standards. The project site is located at the GPO facility at 732 N. Capitol Street in Washington, DC, with the goal of transforming Room C-109 into a functional police locker room.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

CLINDescriptionFirm Fixed PriceNotes/Comment
CLIN 0001Design Phase for Room C-109 Police Locker Room Renovation Project
Site Survey (Architectural, Civil, HVAC, Fire, etc)
Travel
Design Development
Design Administration
Overhead, G&A
Profit

CLIN 0002 Construction Phase for Room C-109 Police Locker Room Renovation Project

Mobilization of Personnel & Equipment
Construction Management for 200 Calander Days
Demolition
Labor and Materials
Overhead, G&A
Profit
CLIN 0003Quality Assurance/Quality Control
Bonds
Design Contingency
Overhead, G&A
Profit

Total Price $0.00