Gate Stem Repairs, West Thompson Lake, North Grosvenordale, CT

Closed Solicitation Posted

Solicitation number
W912WJ23B0005
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks a contractor to perform gate stem repairs at the West Thompson Lake Dam in North Grosvenordale, Connecticut. The United States Army Corps of Engineers, New England District will procure refurbishment of three hydraulic cylinders, replacement of various gate components, fabrication of new composite stop logs and lifting beam, and related services. Offerors must coordinate work restrictions, perform tasks in a specified sequence, and submit a dewatering plan utilizing stop logs to isolate individual conduits. Proposals are due by June 15, 2023. Amendments to the solicitation provide additional details on pre-bid site visits and responses to questions.

This requirement has been set aside for total small business concerns. The NAICS code is 237990 and size standard is $45 million. The possible award value ranges from $1-5 million to be performed at the West Thompson Lake Dam in North Grosvenordale, Connecticut. Offerors must verify field dimensions, coordinate operational restrictions and dewatering requirements, and develop a hoisting system using an existing 5-ton crane rail to disassemble hydraulic cylinders under a firm fixed price contract.

Notice text

There are three hydraulically operated gates located in the Intake Tower at West Thompson Dam located in North Grosvenordale, CT. The dam and its operating equipment are approximately 58 years old and therefore the gate cylinder and gate assembly components are beginning to show signs of wear. The work for this project will likely include, but not be limited to, the following:Refurbish all three hydraulic cylinders located in the gate chamberReplace gate leaf stemsPolish gate stem extension rodsHone inside of hydraulic cylinder barrelReplace lower/upper gate stem oil packings and gate stem water packingsReplace middle piston ring with rubber sealReplace cylinder gaskets and gate stem O-ringsReplace digital gate height indicator system, including transducers, digital displays, and wiring/conduitRemove the middle piston ring on both pistons and replace with a new hydrolysis resistant polyurethane (HPU) piston seal manufactured to operate within specified hydraulic fluid type, pressures, and temperatures. New composite stop logs and lifting beam shall be fabricated and new stop logs shall be installed prior to the start of construction. Stop logs shall be of equivalent dimensional size, quantity, and strength and shall be designed by a Registered professional Engineering in the State of Connecticut. Upon completion of the work, the stop logs and lifting beam shall be turned over to the Government.The Contractor will be required to coordinate operational restrictions with the Contracting Officer?s Representative and onsite personnel. Proper work sequencing will be critical for project success. Full dewatering of the conduits may be required to perform work. Contractor shall field verify extent of dewatering requirements to obtain safe working conditions and to ensure that the space below the bonnet cover is not pressurized prior to any work beginning. Contractor shall then coordinate sufficient time ahead of required dewatering to allow for local personnel to draw down the existing pool elevation.A 5-ton capacity crane rail is located on the operating floor; however, the electric operated hoist system shown on the record drawings has since been removed. The Contractor may use the existing crane rail to develop a hoist system to assist in the disassembly and assembly of the hydraulic cylinders. Prior to use, a competent person, employed by the Contractor, shall verify the rail capacity and confirm the proposed hoisting system will be compatible with the crane rail. The Contractor shall refer to EM-385-1-1, Section 16, Load Handling Equipment and Section 15, Rigging, for additional requirements.Work shall be done on only one gate at a time and at no time shall more than one conduit be out of service. One conduit at a time can be isolated at the upstream end by use of a stop log system. The Contractor shall be responsible for verifying the condition of the stop log channels and providing stop logs to be used for this project. The Contractor shall submit a plan for utilizing stop log systems to ensure safe and reliable operation for dewatering the conduit for approval to the Contracting Officer prior to proceeding with work.

Files

File Type Posted
Amendment 0003.pdf PDF
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
Specs.pdf PDF
Drawings.pdf PDF
W912WJ23B0005.pdf PDF

Notice history

Notice Type Posted
This notice Latest solicitation Solicitation
Gate Stem Repairs, West Thompson Lake, North Grosvenordale, CT Pre-Solicitation
Gate Stem Repairs, West Thompson Lake, North Grosvenordale, CT Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Dike B Generator Installation, Mansfield Hollow Dam, Mansfield Center, CT Mansfield Center, Connecticut, United States · NAICS 238290 ENDIST New England Total Small Business
Float Well Pipe Repairs, Surry Mountain Dam, Surry, NH Surry, New Hampshire, United States · NAICS 237990 ENDIST New England No set-aside
Denison Valve Replacement NAICS 237990 ENDIST Tulsa No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors