GASNTi2 BLOCK 1 Nationwide Material Procurement (Electrical & Telecommunications)
Closed Solicitation Posted
- Solicitation number
- W50S8326QA002
- Agency
-
Army National Guard
Department of the Army, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238210 Electrical Contractors and Other Wiring Installation Contractors
- PSC
- 5975 Electrical Hardware And Supplies
- Place of performance
- Bangor, Maine, United States
- Points of contact
-
- 101st Contracting Office 101.msg.msc.contracting@us.af.mil (207) 404-7107
- Daniel Curtis daniel.curtis.9@us.af.mil (207) 404-7434
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Army National Guard's 101st Military Support Center seeks procurement of wireless communications infrastructure materials, conduit, grounding equipment, and electrical hardware for the GASNTi2 BLOCK 1 project, with proposals due September 18, 2026, at 5:00 PM EST. This is a women-owned small business (WOSB) set-aside, 100% of requirement. Amendment #1, effective September 3, 2026, extended the deadline by 12 hours (from 5:00 AM to 5:00 PM EST on the same date), revised the PSC from L059 to 5975 and NAICS code from 238210 to 335999, and added government responses to industry questions as Attachment 13.
Place of performance encompasses eleven Air Force and Air National Guard installations: Seymour Johnson AFB (North Carolina), Minot AFB (North Dakota), Grissom ARB (Indiana), Whiteman AFB (Missouri), Kirtland AFB (New Mexico), Goldwater ANG Base (Arizona), McConnell AFB (Kansas), Tinker AFB (Oklahoma), General Mitchell ARW (Wisconsin), McGhee Tyson ANG Base (Tennessee), and Fairchild ARW (Washington), with staggered delivery dates between October 31, 2026, and August 31, 2027, by location. Each installation is a separate line item (CLINs 0001–0011) with independent acceptance and invoicing following successful delivery.
All materials must strictly conform to specifications in the Statement of Work and attached List of Materials or approved "or-equal" equivalents. A mandatory requirement mandates delivery in new or highly refurbished, weather-tight, lockable ISO shipping containers, palatized for forklift transportation; the contractor must cover all container costs and logistics, fully amortized within unit pricing with no separate demurrage, retention, or container rental line items permitted. Title and ownership of the container permanently transfer to the Government upon delivery. Contractors bear all transportation costs and responsibility for coordination of acceptable delivery times and offload equipment. Inspection and acceptance occur at destination with Government Quality Assurance Representatives verifying quantity, condition, conformance, and packaging. Contractors must submit receiving reports via WAWF and comply with WOSB utilization requirements, FAR and DFARS clauses for commercial products and services, electronic funds transfer payment procedures, military base security protocols, and item unique identification for deliverables valued at $5,000 or more. The NAICS code is 335999; the PSC is 5975.
Notice text
2 versions
Update #2 · Latest ·
AMENDMENT #1 issued 3 September 2026, see attached documents.
The 101st MSC Office is issuing this combined synopsis/solicitation for the procurement of wireless communications infrastructure materials, conduit, grounding equipment, and supporting electrical hardware in support of the SC GASNTi2 BLOCK 1 project.
This procurement includes a mandatory requirement for a purchased ISO shipping container in which all materials must be delivered and stored. Upon acceptance of delivery, title and ownership of the shipping container will permanently transfer to the United States Government.
All materials must strictly conform to the specifications outlined in the Statement of Work (SOW) and the attached List of Materials (LOM) (or approved "or-equal" equivalents).
2. INSTRUCTIONS TO OFFERORS (FAR 52.212-1 ADDENDUM)
2.1. Submission Instructions
Offerors must submit their quotes via email to the primary Government Points of Contact (POCs) listed below no later than September 18, 2026, at 5:00 PM EST. Late submissions will not be evaluated.
2.2. Quote Package Requirements
The quote package must include the following distinct elements:
-
Technical Quote:
-
A completed bill of materials pricing sheet matching the item numbers in Attachments (LOM).
-
Detailed product specification sheets for any proposed "or-equal" items, including a side-by-side comparison chart matching the salient characteristics defined in the LOM.
-
Conformance statement confirming that all materials will be delivered palletized for forklift transportation within a new or highly refurbished ISO shipping container that will become the permanent property of the Government upon delivery.
-
-
Price Quote:
-
A firm-fixed-price (FFP) quote detailing unit and extended pricing for all LOM items.
-
Crucial Pricing Note: The total cost of the ISO shipping container, including its initial freight and logistics, must be fully integrated and amortized within the unit prices of the delivered materials. No separate demurrage, retention, or container rental line items will be accepted.
-
-
Representations and Certifications:
-
Completed copy of FAR 52.212-3 (Offeror Representations and Certifications—Commercial Products and Commercial Services) or confirmation of an active and up-to-date registration in the System for Award Management (SAM.gov).
-
3. EVALUATION AND AWARD CRITERIA (FAR 52.212-2)
The Government intends to award a Firm-Fixed-Price contract resulting from this solicitation to the responsible offeror whose quote conforms to the solicitation and represents the Lowest Price Technically Acceptable (LPTA).
Quotes will be evaluated based on the following two factors:
Factor 1: Technical Acceptability
The technical evaluation will be graded on a Pass/Fail (Acceptable/Unacceptable) basis. To be rated "Technical Acceptable," the quote must demonstrate:
-
Strict conformance to the exact part numbers specified in Attachment #1, OR technical data sheets proving 100% equivalency to all listed salient physical, functional, and performance characteristics for proposed "or-equal" substitutions.
-
Unequivocal acceptance of all Statement of Work terms, including base security access, delivery terms, and the permanent transfer of ownership of the delivery/storage shipping container (SOW Section 2, Item 5).
Factor 2: Price
Pricing will be evaluated for fairness and reasonableness. Award will be made to the lowest-priced quote that has been determined to be technically acceptable.
4. PLACE OF PERFORMANCE AND DELIVERY TERMS
-
FOB Destination:
Seymour Johnson Air Force Base - Goldsboro, NC
Minot Air Force Base - North Dakota
Grissom Air Reserve Base - Indiana
Whiteman Air Force Base - Missouri
Kirtland Air Force Base - Albuquerque, NM
Goldwater Air National Guard Base - Phoenix, AZ
McConnell Air Force Base - Wichita, KS
Tinker Air Force Base - Oklahoma City, OK
General Mitchell Air Refueling Wing - Milwaukee, WI
McGhee Tyson Air National Guard Base - Louisville, TN
Fairchild Air Refueling Wing - Spokane, WA -
Delivery Timeline: Delivery must be coordinated with the Government POCs to occur during normal business hours, excluding Federal holidays. All items must be delivered fully weatherproofed, palletized, and secured inside the purchased ISO container.
Update #1 ·
The 101st MSC Office is issuing this combined synopsis/solicitation for the procurement of wireless communications infrastructure materials, conduit, grounding equipment, and supporting electrical hardware in support of the SC GASNTi2 BLOCK 1 project.
This procurement includes a mandatory requirement for a purchased ISO shipping container in which all materials must be delivered and stored. Upon acceptance of delivery, title and ownership of the shipping container will permanently transfer to the United States Government.
All materials must strictly conform to the specifications outlined in the Statement of Work (SOW) and the attached List of Materials (LOM) (or approved "or-equal" equivalents).
2. INSTRUCTIONS TO OFFERORS (FAR 52.212-1 ADDENDUM)
2.1. Submission Instructions
Offerors must submit their quotes via email to the primary Government Points of Contact (POCs) listed below no later than September 18, 2026, at 5:00 PM EST. Late submissions will not be evaluated.
2.2. Quote Package Requirements
The quote package must include the following distinct elements:
-
Technical Quote:
-
A completed bill of materials pricing sheet matching the item numbers in Attachments (LOM).
-
Detailed product specification sheets for any proposed "or-equal" items, including a side-by-side comparison chart matching the salient characteristics defined in the LOM.
-
Conformance statement confirming that all materials will be delivered palletized for forklift transportation within a new or highly refurbished ISO shipping container that will become the permanent property of the Government upon delivery.
-
-
Price Quote:
-
A firm-fixed-price (FFP) quote detailing unit and extended pricing for all LOM items.
-
Crucial Pricing Note: The total cost of the ISO shipping container, including its initial freight and logistics, must be fully integrated and amortized within the unit prices of the delivered materials. No separate demurrage, retention, or container rental line items will be accepted.
-
-
Representations and Certifications:
-
Completed copy of FAR 52.212-3 (Offeror Representations and Certifications—Commercial Products and Commercial Services) or confirmation of an active and up-to-date registration in the System for Award Management (SAM.gov).
-
3. EVALUATION AND AWARD CRITERIA (FAR 52.212-2)
The Government intends to award a Firm-Fixed-Price contract resulting from this solicitation to the responsible offeror whose quote conforms to the solicitation and represents the Lowest Price Technically Acceptable (LPTA).
Quotes will be evaluated based on the following two factors:
Factor 1: Technical Acceptability
The technical evaluation will be graded on a Pass/Fail (Acceptable/Unacceptable) basis. To be rated "Technical Acceptable," the quote must demonstrate:
-
Strict conformance to the exact part numbers specified in Attachment #1, OR technical data sheets proving 100% equivalency to all listed salient physical, functional, and performance characteristics for proposed "or-equal" substitutions.
-
Unequivocal acceptance of all Statement of Work terms, including base security access, delivery terms, and the permanent transfer of ownership of the delivery/storage shipping container (SOW Section 2, Item 5).
Factor 2: Price
Pricing will be evaluated for fairness and reasonableness. Award will be made to the lowest-priced quote that has been determined to be technically acceptable.
4. PLACE OF PERFORMANCE AND DELIVERY TERMS
-
FOB Destination:
Seymour Johnson Air Force Base - Goldsboro, NC
Minot Air Force Base - North Dakota
Grissom Air Reserve Base - Indiana
Whiteman Air Force Base - Missouri
Kirtland Air Force Base - Albuquerque, NM
Goldwater Air National Guard Base - Phoenix, AZ
McConnell Air Force Base - Wichita, KS
Tinker Air Force Base - Oklahoma City, OK
General Mitchell Air Refueling Wing - Milwaukee, WI
McGhee Tyson Air National Guard Base - Louisville, TN
Fairchild Air Refueling Wing - Spokane, WA -
Delivery Timeline: Delivery must be coordinated with the Government POCs to occur during normal business hours, excluding Federal holidays. All items must be delivered fully weatherproofed, palletized, and secured inside the purchased ISO container.
Files
| File | Type | Posted |
|---|---|---|
| GASNT LOM RFIs.xlsx | XLSX spreadsheet | |
| Conformed Solicitation Amendment-W50S8326QA0020001.pdf | ||
| Solicitation Amendment W50S8326QA0020001 SF 30.pdf | ||
| Seymour Johnson AFB LOM.pdf | ||
| Goldwater LOM.pdf | ||
| General Mitchell ANGB LOM.pdf | ||
| Solicitation - W50S8326QA002.pdf | ||
| Whiteman AFB LOM.pdf | ||
| Fairchild AFB LOM.pdf | ||
| Kirtland LOM.pdf | ||
| Grissom ARB LOM.pdf | ||
| Tinker LOM.pdf | ||
| Minot SOW LOM.pdf | ||
| McConnell LOM.pdf | ||
| McGhee Tyson LOM.pdf |
Show all 15
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| GASNTi2 BLOCK 1 Nationwide Material Procurement (Electrical & Telecommunications) | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| SCIF Tent | ACC Aberdeen Proving Ground | No set-aside | |
| Fiber, trans, 4 | Land and Maritime | No set-aside | |
| Solicitation_S-280C/G Vehicle Mounted Shelter | Department of the Army | Total Small Business | |
| NG SEW-electrical components | ACC Rock Island | Total Small Business | |
| Control, antenna | Land and Maritime | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity