Gaoa water canyon trail bridge replacement

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
140L3923R0024
Agency
Nevada Region Bureau of Land Management, Department of the Interior
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Y1LB Construction Of Highways, Roads, Streets, Bridges, And Railways

Notice details come from SAM.gov. Updated .

About this opportunity

The Bureau of Land Management Nevada Region is soliciting proposals to replace two pedestrian bridges along the Water Canyon Trail in Winnemucca, Nevada under solicitation number 140L3923R0024. The contractor will demolish the existing bridges and construct two new prefabricated steel bridges, precast concrete abutments, and clear approximately 750 feet and 210 feet of nature trail. Proposals will be evaluated based on technical approach, past performance, and price. The closing date for proposals is September 11, 2023.

The project has been set aside for small businesses with a NAICS code of 237310 for highway, street, and bridge construction. The period of performance is from September 22, 2023 through November 30, 2023 for construction services valued between $250,000 to $500,000 to be performed in Humboldt County, Nevada.

Notice text

GAOA WATER CANYON TRAIL BRIDGE REPLACEMENT

Attachments

Files attached to this notice, newest first
File Type Posted
Sol_140L3923R0024_Amd_0001.pdf PDF
B09_Q_and_A_0001.docx DOCX document
A06__Drawing_Book_Water_Canyon_Trail_Bridges_100_percent.pdf PDF
B03_DBA_Wages_NV20220005.pdf PDF
A06_Trail_Specifications.doc DOC document
Sol_140L3923R0024.pdf PDF
A04_100__Statement_of_work_TrailsPortion.docx DOCX document
A06_Water_Canyon_Trail_Bridges_SCR_s.docx DOCX document
A06_Chapter_10__Outdoor_Developed_Areas.pdf PDF
A04_100__Statement_of_work_PedestrianBridges.docx DOCX document

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Gaoa water canyon trail bridge replacement Award Award Notice
Gaoa water canyon trail bridge replacement This notice · Latest solicitation Solicitation
Gaoa water canyon trail bridge replacement Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity