GAOA Lolo Recreation Site Water System Replacements

Closed Pre-Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest solicitation from .

Solicitation number
1240LU24B0002
Agency
Forest Service Department of Agriculture
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Z1AZ Maintenance Of Other Administrative Facilities And Service Buildings
Place of performance
Missoula, Montana, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This pre-solicitation notice seeks to replace water systems at four recreation sites within Montana's Lolo National Forest. The Forest Service is soliciting proposals to provide all labor, materials, equipment, supervision and expertise to complete water system replacements at Bend Guard Station, Lee Creek Campground, Grizzly Campground and Seeley Lake Campground. Proposals are due by January 30, 2024 and the selected contractor must complete all work by October 1, 2025. Evaluation will consider the contractor's ability to perform the distinct scopes of work outlined for each location.

There is no set-aside designated for this procurement. The primary NAICS code is 237110 and PSC code N071. The construction magnitude is estimated between $250,000 and $500,000 to replace water systems at the four recreation sites on the Lolo National Forest by the October 2025 deadline. Optional bid items are included to further improve some sites.

Notice text

GAOA Lolo Recreation Site Water Systems on various sites on the Lolo National Forest 

PreSolicitation Notice ONLY - All Solicitation documents will be pisted here by Mid to late December. 

Description of Work.  This project includes the replacement of water systems at four recreation sites on the Lolo National Forest:

  • Bend Guard Station
  • Lee Creek Campground
  • Grizzly Campground
  • Seeley Lake Campground

The contractor shall furnish all labor, transportation, equipment, material, supervision, and expertise necessary to accomplish the work at each site.  The scope of work at each site is slightly different in nature, details of the work at each site are described below:

Bend Guard Station – This project includes installation of new waterline from existing well to cookhouse, connection to existing well and connection to existing water service piping within cookhouse, installation of lateral line over to stock tank with non-potable water hydrant, installation lateral line to flushing hydrant controlled with ball valve, and replacement of piping and appurtenances within the cookhouse building.  Additional valves, pressure switches, and junctions will also be required. (See Attached Plans and Specifications)

Lee Creek Campground – This project includes the replacement of all water system lines and four water spigots within the Lee Creek Campground. A new pumphouse and new inner workings such as pressure tanks are also included as optional bid items. (See Attached Plans and Specifications)

Grizzly Campground – This project includes coordinating with power utility company to bring power into the campground, a new pumphouse/control room, remove existing hand pump and installing new pump, new waterline between pump and pumphouse/control room, and one hydrant with concrete splash pad.  The contract will also include an option item to install an additional water line to second hydrant. (See Attached Plans and Specifications)

Seeley Lake Campground – This project will include the replacement of a segment of waterline and the associated hydrants and pipe junctions that have been damaged at the Seeley Lake Campground.  (See Attached Plans and Specifications)

Project Location.  The project is located at various recreation sites throughout the Lolo National Forest 

Bend Guard Station – Plains/Thompson Falls Ranger District, Sanders County

Lee Creek Campground – Missoula Ranger District, Missoula County

Grizzly Campground – Missoula Ranger District, Missoula County

 Seeley Lake Campground – Seeley Lake Ranger District, Missoula County

Construction Magnitude: Between $250,000 an $500,000

Period of Performance: All work shall be completed by October 1, 2025.

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
GAOA Lolo Recreation Site Water System Replacements Award Award Notice
GAOA Lolo Recreation Site Water System Replacements Latest solicitation Solicitation
GAOA Lolo Recreation Site Water System Replacements This notice Pre-Solicitation
Site Visit - GAOA Lolo Recreation Site Water System Replacements Original Special Notice

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity