GAOA Echo Amphitheatre Rec Site Improvements: Phase II
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 127EAX24R0005
- Agency
-
Forest Service
Department of Agriculture
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Place of performance
- Abiquiu, New Mexico 87510, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The United States Forest Service is seeking proposals to improve facilities at the Echo Amphitheater Recreation Site in Carson National Forest, New Mexico under solicitation number 127EAX24R0005. Work includes upgrading the water system, installing underground electric lines, constructing drainage features, improving roads and campsites, installing fencing and a kiosk, and developing nine campsites. Offerors must be small businesses registered in the System for Award Management. Proposals will be evaluated based on technical qualifications and price. The solicitation will be released on the SAM.gov website on January 31, 2024, with proposals due by March 4, 2024.
The opportunity is set aside for total small businesses. The NAICS code is 237990 for other heavy civil engineering construction. The estimated value for the total project is between $500,000 to $1,000,000. Work will involve extending approximately 1,300 linear feet of water distribution lines, installing nine RV pedestals and secondary electric lines to campsites, and improving facilities that will serve 127 overnight campers. A pre-bid site visit is scheduled to be detailed in the forthcoming RFP.
Notice text
Description: THIS IS A PRE-SOLICITATION NOTICE FOR A REQUEST FOR PROPOSAL (RFP). Proposals shall only be requested and accepted from contractors who are a 100% Small Business owned AND certified in System for Award Management (SAM, https://sam.gov).
The United States Department of Agriculture (USDA), United States Forest Service (USFS), has a requirement for but not limited to the following:
127EAX24R0005: GAOA Echo Amphitheatre Improvements Phase II, Carson National Forest, NM.
The Carson National Forest is seeking to make improvements to the Echo Amphitheater Recreation Site located on the Canjilon District in Canjilon, NM.
Phase II of this project will include:
- The Water System improvements include the extension of the distribution line provide:
- A water fill station for overnight campers (complete with a new hydrant & shutoff valve assembly)
- Water to the host site
Water system improvements will also include the installation one (1) new drinking water/sanitary hydrant near the restroom facility and the abandonment of the upper portion of the drinking water system including 4 hydrants.
- This project will include excavation, trenching, and backfilling for new underground primary electric line installation. The USFS has a separate contract with NORA Electric Cooperative to place the electric line. Earthwork for the electrical placement is included in this contract and is the responsibility of the contractor awarded the project. The USFS will aid in facilitating correspondence between the contractor and NORA Electric Cooperative for scheduling of construction. Also, to be installed is approximately 1300 linear feet of secondary underground electric lines to provide power to 9 campsites (including host site). Contractor additionally will be responsible for the furnishment and installation of a meter base, a main distribution panel, 9 RV pedestals and the secondary lines in addition to the associated trenching, excavation and backfill.
- Campground drainage improvements will include berm construction, ditch construction and the installation of valley gutters. All these components will serve to channel any stormwater runoff in the vicinity of the overnight campground area.
- Campground loop and campsite driving/parking surface improvements will include the blading and shaping of the existing campground loop road and campsites in preparation for placement of base coarse and a new gravel driving/parking surface.
- Day use Ramada shelter erosion control will include the construction of timber retaining walls around designated permitters of the Ramada shelters. This work will also include the construction of a gravel drainage pad between the existing Ramada concrete slab and the new retaining wall.
- Split rail fencing will be installed on various intervals along the path leading up to the Amphitheater.
- Existing informational KIOSK shall be removed and replaced with a new KIOSK.
- Campsite living units shall be installed at all 9 campsites (host site included).
Location: Echo Amphitheater is located approximately 17 miles NW of Abiquiu NM along US HWY-84. The recreation site is on the Westside of the highway.
GPS Location: 36.358730, -106.521580
Solicitation 127EAX24R0005 for this effort will be posted to SAM.gov (https://sam.gov) on or about January 31, 2024. This solicitation will contain all necessary specifications, drawings, and other information necessary to submit a proposal for this project.
A pre-bid site visit is currently planned and will be scheduled in the RFP. The solicitation will include site visit information, as necessary.
Disclosure of the magnitude of construction projects: The estimated cost of the total project is expected to be between $500,000 and $1,000,000.
NAICS Code: 237990- Other Heavy Civil Engineering Construction
Size Standard: $39.5 Million
Point of Contact: Clement Bucher, Contract Specialist
Clement.Bucher@USDA.gov
(301-800-8610)
Interested firms are encouraged to register via https://sam.gov to view the formal solicitation when it is released.
Files
| File | Type | Posted |
|---|---|---|
| ECHO Drawings.pdf | ||
| Section 02103 - Split Rail Fence.doc | DOC document | |
| Section 02100 - Timber Retaining Walls and Gravel Pad.doc | DOC document | |
| Section 00151 - Mobilization.docx | DOCX document | |
| Section 02510 - Water Distribution.doc | DOC document | |
| Section 02104 - General Recreation Site.doc | DOC document | |
| Section 16400 - Underground Cable.doc | DOC document | |
| Section 02102 - Clearing and Grubbing.doc | DOC document | |
| Wage determination.pdf | ||
| Section 02316 - Excavation Trenching and Backfilling for Utility Systems.doc | DOC document | |
| Section 02101 - Road and Campsite Resurfacing.doc | DOC document | |
| 127EAX24R0005.pdf |
Show all 12
Notice history
| Notice | Type | Posted |
|---|---|---|
| GAOA Echo Amphitheatre Rec Site Improvements: Phase II | Award Notice | |
| GAOA Echo Amphitheatre Rec Site Improvements: Phase II | Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| GAOA Grizzly Bear Campground | Region 2 - Rocky Mountain Region | Total Small Business | |
| Stove Prairie Campground Gate Replacement | Forest Service | Total Small Business | |
| Request for Proposal Effigy Mounds National Monument - EFMO 224159/318539 | — | No set-aside | |
| Access Road Repair National Elk Refuge | — | Total Small Business | |
| GRCA 318719 North Rim & Roaring Springs Rehabilitation Program | — | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity