Section 02101 - Road and Campsite Resurfacing.doc

DOC document 43 KB Posted

Attached to
GAOA Echo Amphitheatre Rec Site Improvements: Phase II
Solicitation number
127EAX24R0005
Issued by

About this file

This document includes a federal contract solicitation notice and related technical specifications for campground improvements at the Echo Amphitheater Recreation Site on the Carson National Forest in New Mexico. The solicitation notice seeks proposals from small businesses to complete Phase II of the project, which includes extending the water distribution system to provide a water fill station for campers and water to the host site. It also involves installing underground primary and secondary electric lines, constructing campground drainage improvements like berms and ditches, resurfacing campground roads and campsites, and installing campsite amenities. The estimated cost of the total project is between $500,000 and $1,000,000. Interested firms should register at SAM.gov to view the formal solicitation when released on or around January 31, 2024. The technical specifications provide requirements for the road and campsite resurfacing work, including soil profiles, compaction testing, and surface materials.

View the file

Other files

File Type Posted
Section 16400 - Underground Cable.doc DOC document
Section 02510 - Water Distribution.doc DOC document
Section 02104 - General Recreation Site.doc DOC document
ECHO Drawings.pdf PDF
Section 02316 - Excavation Trenching and Backfilling for Utility Systems.doc DOC document
Section 02100 - Timber Retaining Walls and Gravel Pad.doc DOC document
Section 00151 - Mobilization.docx DOCX document
127EAX24R0005.pdf PDF
Wage determination.pdf PDF
Section 02103 - Split Rail Fence.doc DOC document
Section 02102 - Clearing and Grubbing.doc DOC document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 02101

rOAD/CAMPSITE RESURFACING

PART 1 - GENERAL

1.1 SUMMARY

A. Campground loop and campsite driving/parking surface improvements will include the blading and shaping of the existing campground loop road and campsites in preparation for placement of base coarse and a new gravel driving/parking surface. Additionally, a pull through drive shall be constructed according to the same specifications outlined in this section for a water fill station. This section also includes the construction of concrete valley gutters and drainage berms.

1.2 MEASUREMENT

A. Linear measurements for roadwork will be horizontal along the road centerline.

B. Linear measurements for campsite work will be horizontal along the campsite centerline.

C. Quantity for blading and shaping of road and campsites will be linear along the centerline respectively.

D. Quantity for placement of compacted base coarse for driving/parking surfaces & drainage berms will be per cubic yard.

E. Quantity for placement of gravel for driving/parking surfaces & drainage berms will be per cubic yard.

F. Quantity for construction of concrete valley gutters will be per cubic yard.

G. The actual quantities will be paid for at the contract unit price for each pay item shown in the Schedule of items. Actual quantities are defined as the actual physical quantity of material needed to accomplish the work outlined in this section to deliver a product that is both safe and acceptable. If construction requires a higher quantity of material than what has been shown in the Schedule of items, contractor shall coordinate with the CO for approval prior to construction and/or purchasing and billing.

PART 2 – PRODUCTS

cONTRACTOR SHALL PROVIDE SUBMITALLS INCLUding but not limited to soil proctors, material gradation sheets, compaction curves etc.

2.1 BASE course

a.

Base course shall have a minimum dry unit weight of 138 pounds per cubic foot (lb/ft^3) +/- 10%. Contractor shall provide a soil proctor for base course from product supplier.

2.2 GRAVEL (Campsite Living Units & Electric Pedestals)

A.

Gravel shall be 1/2" minus fractured gravel (unwashed). Contractor shall provide supplier specification for gravel to ensure proper size and type.

2.3 GRAVEL (Roadway, Drainage Berms & Campsites) A.

Gravel shall be 1” - 2” unwashed-crushed gravel. Contractor shall provide supplier specifications for gravel to ensure proper size and type.

2.4

VALLEY GUTTER

A.

Concrete valley gutter shall be constructed with Quikrete High Strength Concrete Mix. Concrete shall be mixed per manufacturer recommendations.

PART 3 – EXECUTION

1.3 Typical road & Campsite soil profile (unless otherwise noted) A. Typical road section shall be comprised of:

1. Finish Surface: 2” layer of compacted 1” – 2” unwashed gravel

2. Road Base: 3” Layer of compacted base coarse

3. Subgrade: Compacted Native Material

1.4 Typical campsite living unit & Electric pedestal soil profile (unless otherise noted)

A. Typical campsite & campsite living unit section shall be comprised of:

1. Finish Surface: 2” layer of compacted 1/2" minus unwashed gravel

2. Base: 3” Layer of compacted base coarse

3. Subgrade: Compacted Native Material

1.5 Blading and shaping

A. Contractor shall blade & shape the existing Campground Loop Road and Campsites in preparation for resurfacing. Finished elevation of road shall be level with the high side of existing terrain. Low side road edge shall be built up with native material to ensure road surface material holds in place. Blading shall ensure that subgrade is compacted and level in anticipation of placing 5” of material on top of subgrade per section 3.2, 3.3 & 3.4 (for campsites).

1.6 base coarse A. Contractor shall place one (1) 3” layer of base coarse on top of compacted subgrade. Base coarse shall be compacted to a minimum of 95% of the dry unit weight. In situations where section shall be built up in exceedance of the typical road section, contractor shall compact in 6” lifts to 95% of the dry unit weight.

B. Contractor shall perform compaction tests at every campsite along the centerline of the Campground loop road and at every campsite. Campsite compaction tests shall occur at a location designated by COR.

C. Contractor shall be responsible for providing water to ensure an adequate soil water content level is maintained for compaction

1.7 Gravel Surface (Roadway, drainage berms & Campsites)

A. Contractor shall place one (1) evenly distributed 2” layer of 1-2” unwashed gravel as a finish surface on top of base coarse layer.

1.8 Gravel Surface (Campsite living Units)

A. Contractor shall place one (1) evenly distributed 2” layer of 1/2" minus unwashed gravel as a finish surface on top of base coarse layer.

B. Gravel shall be compacted to 95% of its maximum compaction as noted by supplier or as approved of by COR.

1.9 water fill station pull through

A. Contractor shall construct a camp spur pull through. Minimum outside radius = 80 FT, minimum inside radius = 80 FT. Spur Width shall be = 16 FT minimum.

B. Fill station shall be considered a campsite and therefore have the same soil profile specified for campsites.

1.10 Bar ditch

spec writer: edit type of method in paragraph below.

A. Contractor shall construct a bar ditch as depicted by flow lines in the construction drawings.

1.11 Drainage berms

A. Contractor shall construct two (2) berms North of the existing Group Shelter. The berm shall consist of a ditch with a 2% downward slope in the direction depicted by flow lines in the construction drawings. Refer to berm details in the construction drawings for the typical berm detail.

1.12 valley gutters spec writer: edit type of method in paragraph below.

A. Contractor shall construct three (3) 4-foot wide valley gutters. Total length may vary based on actual road width at the 3 locations. Refer to construction drawings for locations.

B. Contractor shall construct “lead-outs” after each valley gutter to channel runoff water from the valley gutters to the nearest vegetation cluster(s).

PART 4 – MEASUREMENT & PAYMENT

4.1

MEASUREMENT & PAYMENT

A.

Payment for blading and shaping shall be per linear foot (LF).

B.

Payment for ALL base coarse shall be per cubic yard (CY).

C.

Payment for ALL gravel shall be per cubic yard (CY).

D.

Payment for concrete valley gutter shall be per cubic yard (CY).

END OF SECTION 02102

02102 - 5

CLEARING & GRUBBING